Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 45 of 62  Not logged in ThomX    logo
ID Date Author Status Type Categorydown Important Subject Icon Text Attachments
  810   Thu Oct 26 09:02:33 2023 VC,SC, ND, IC, VK, CB, V LinacLI | TL | Ring Linac 8h30 Mise en chauffe

Pas d'internet sur client1
et client2
  
  1149   Wed Nov 12 10:29:49 2025 Entered by Super Team from 134.158.76.9 on Wed Nov 12 10:29:34 2025Under ProcessShift summaryLI | TL | Ring   15h09 Cycling all magnets

15h12 HV is ON

15h15 The modulator was set to
  
  1162   Thu Dec 4 08:59:07 2025 Entered by Super Team from 134.158.195.141 on Thu Dec 4 08:58:52 2025 Shift summaryLI | TL | Ring Preparation/check of the 70 MeV WP for X-ray run Goal: preparation and checking the machine
operation at 70 MeV and 40 MeV (ideally with
X-rays)
 Screenshot_from_2025-12-04_16-10-14.pngScreenshot_from_2025-12-04_17-38-20.pngScreenshot_from_2025-12-04_18-01-39_WITH_EL.png 
  1000   Tue Jan 21 08:08:43 2025 KDUnder ProcessShift summaryLI | TL | Linac Commissionning | Ring Commissioning shift du 21 janvier 2025 8h10 : mise en chauffe à distance
(modulateur, laser, frigo/chiller)
  
  741   Tue Apr 25 14:19:49 2023 CB Shift summaryLI | TL | Linac Commissionning run du 20 avril 2023 icon13.gif Suite du run du 19 avril : objectif mesure
des twiss pour plusieurs valeur de solénoides
à partir de 180A
 coil2scan_11h46.png20230420.pptx 
  1009   Wed Feb 12 08:00:31 2025 KD MJUnder ProcessShift summaryLI | TL | Linac Commissionning shift du 12 février 2025 - Alignements 8h: mise en chauffe à distance (modulateur,
frigo, chiller, laser)

9h30: laser semble pas aligné
 2025-02-12-Shift.pngaxes_BPM_calib.jpgaxes_BPM_nocalib.jpg 
  1148   Mon Nov 10 16:15:53 2025 KD, M2 GIFixedShift summaryLI | TL | Linac Commissionning shift du 10 novembre 2025 8h: mise en chauffe en remote (modulateur,
laser, frigo/chiller)

10h: Démarrage machine
  
  687   Mon Feb 20 08:30:57 2023 KD, MJ, HGUnder ProcessShift summaryLI | TL | LE | Vide | Linac Commissionning shift du 20 février 2023 8h30 : Mise en chauffe de la machine (frigo,
chiller, laser, modulateur)

fosse vidée + circuit d'eau
 quad1_3_zero.pngrecette_20230217_quad1_3.png2023-02-20_15_29_20_tl_dg_sst_01-ccd_01_RAW.pnginjection_RING_recette_20230220_17_07_34.pngScreenshot_BPMs_Trend_from_2023-02-20_18-14-59.png 
  Draft   Mon Feb 20 10:16:18 2023 NDUnder ProcessShift summaryLI | TL | LE | Vide | Linac Commissionning RE: shift du 20 février 2023 Healthcheck signal effectivement un probleme
sur toute les vannes...  Et les atkpanels
signalent un problème de communi
 Capture_d’eÌcran_2023-02-20_aÌ€_10.15.37.png 
  689   Mon Feb 20 10:19:56 2023 NDUnder ProcessShift summaryLI | TL | LE | Vide | Linac Commissionning RE: shift du 20 février 2023 Healthcheck signal effectivement un probleme
sur toute les vannes...  Et les atkpanels
signalent un problème de communication...
 pb_vide_hc.pngpb_vide_atk.png 
  Draft   Thu Nov 13 08:00:59 2025 KD MJ VM HGFixedShift summaryLI | TL | LE | Ring | Opt | Linac Commissionning | Ring Commissioning shift du 13 novembre 2025 - spectres a differentes valeurs de bpmTL2_X Apres que Kevin a regle tous les problemes
synchro signal bpm etc etc etc

L'interface SST ne fonctionne
  
  840   Fri Feb 2 08:16:50 2024 Entered by Super Team from 134.158.195.141 on Fri Feb 2 08:16:31 2024Under ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning Shift du 2 février 2024 La clé PA est resté enclenchée
hier. Il faut penser à la tourner
avant de partir (demande de Maher)
 Screenshot_2024-02-02_12-05-19.png 
  977   Tue Dec 10 11:35:16 2024 VM,HG,SCUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning 50 and 70 MeV Emittance, and transport  Intervention chiller (Maher) : maintenance
nécessaire à prévoir
(clé outil clignote)
 Q_vs_SolenoScan_at_16-52-02_Q1_Off.pngQ_vs_SolenoScan_at_16-39-39_recette_good_xrays.png 
  1141   Thu Oct 23 07:45:25 2025 KD RC VC MJUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning shift du 23 octobre 2025 7h45: mise en chauffe en remote (modulateur,
laser, frigo/chillers, cyclage)
8h45 : mise en route Modulateur
  
  1176   Wed Jan 7 07:55:45 2026 VM DN MJ KDUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning shift du 07 janvier 2026 7h55: mise en chauffe en remote (modulateur,
frigo/chillers, laser, cyclage)
11h25 HV is ON
 16x 
  1177   Thu Jan 8 09:07:08 2026 IC, HG, RC, DN, JMUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning Test of the new receipt from BMAD Isol = 242 A 8h55: mise en chauffe (modulateur, frigo/chillers,
laser, cyclage)

10h20 HV ON
 13x 
  1185   Wed Jan 21 07:56:59 2026 KD MJ RC DNUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning Position Horiz FPC ("spectres dromadaires") 7h55: mise en chauffe en remote (modulateur,
cyclage, laser, frigo/chillers)
==> plus de trig sur la machine
  
  838   Thu Feb 1 11:50:28 2024 MJNot FixedShift summaryLI | TL | LE | Ring | Linac Commissionning Attenuateur LIL / Puissance LIL / Energie electrons La puissance entree canon a ete verifie
et conforme a l'atterndu (6 MW = 18/3
MW)
  
  817   Wed Nov 15 09:13:06 2023 KD, MJ, RCUnder ProcessShift summaryLI | TL | LE | Ring | Laser | Opt | SY shift du 15 novembre 2023 9h : mise en chauffe de la machine

12h: intervention Iryna et Slava
pour un meilleur stockage dans l'anneau
 6x 
  1160   Tue Dec 2 09:28:15 2025 Entered by Super Team from 134.158.205.28 on Tue Dec 2 09:27:54 2025Not FixedInfoLI | TL | LE | Ring | Diag | Linac Commissionning | Ring Commissioning Shift ThomX/Xrays : Soucis démarrage icon4.gif Last Recettes for 50 MeV:

recipe_recipe_LI_TL_RI_good_20251127_12_42_51.txt

recipe_recipe_LI_TL_RI_good_20251125_16_42_01.txt
 Screenshot-ICTLI.png 