HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 46 of 62  Not logged in ThomX    logo
ID Date Author Status Type Categorydown Important Subject Icon Text Attachments
  815   Thu Nov 9 09:02:39 2023 KDReference SolutionShift summaryLI | TL | LE | Ring | Diag | CC | Laser | Opt | RF Anneau | SY | Linac Commissionning | Ring Commissioning shift du 09 novembre 2023 8h30 : démarrage machine (laser,
klystron, chiller, frigo, aimant)

* Beaucoup de problème de
  
  Draft   Thu Dec 18 09:39:38 2025 DN, IC, HG, KD, MJ, and Co Shift summaryLI | TL | LE | Ring | Diag | Aimants | Laser | Vide | Linac Commissionning | Ring Commissioning X-ray measurement/characterization campaign The machine was warmed up remotemy

The FPC is ready. The laser is locked.

9h Start HV
 Q_missed_2025-12-18_13-50-19.png 
  819   Fri Nov 17 08:28:18 2023 VC/SCUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | SY | Linac Commissionning | Ring Commissioning Commissionning LE 8h20 demararage machine

laser PC

Frifo chiller
  
  867   Fri May 24 08:21:49 2024 MEK , SC, Victor, Vincent Under ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Ring Commissioning Conditionnement section 24/05 8h10: set to standby Modulateur

Démarrage Frigo et Chiller

8h30 - 9h : intervention de Kevin
 1_1dB_3us_1Hz.pngScreenshot_1.6dB_3us_2024-05-24_17-05-27.pngclaquage_1_1dB_3us_1Hz.pdfpassage_5Hz_3us_1dB.pdf 
  720   Mon Mar 27 13:55:41 2023 Entered by Super Team from 134.158.195.141 on Mon Mar 27 13:55:24 2023Under ProcessInfoLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Etat ThomX  Cavité FP a terminé son intervention

Mise sous vide possible cette après-midi

14h Intervention IHM cavité
  
  777   Fri Jun 23 13:56:03 2023 all Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning X detectes aujourd'hui Aujourd'hui on a detecte des X en mode
desynchro (notre signal correspond a ~ 3.10**6
ph/sec)
 2023-06-23-Shift.pdf 
  791   Mon Aug 21 09:10:35 2023 KDUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning redémarrage machine 21/08/2023 9h: redémarrage des systèmes.

- pompes boucle de refroidissement
(pompe primaire, pompe échangeur,
 2023-08-21_15_59_49_li_op_las_02_profile_laser_PC_log_scale_True_despeckle_False_Auto_scale_True.pngScreenshot_from_2023-08-21_17-54-55.png 
  837   Thu Feb 1 08:10:14 2024 VK VC HG SC MEUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commitionning 8h10 rémarrage machine chauffage
klystron frigo et chiller

pB DS   calc/er_sy/rac.17-elr.01-rdp.0X.Y 
  
  842   Tue Feb 6 08:52:28 2024 VC MJ KDUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commissionning 8h45 demarrage machine

modulateur frigo ampli laser chiller
et cyclage des aimants
 7x 
  843   Tue Feb 6 20:21:38 2024 Entered by Marie Jacquet from 134.158.89.45 on Tue Feb 6 20:21:21 2024FixedShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commissioning 14h - Mesures SPR radiations accelerateur

Beam shutter securite ne
remonte plus --> Mesure SPR X-hutch
  
  846   Mon Feb 26 09:07:06 2024 VC, VK, VM, IC, NDUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning redemarage machine après Ă©longation anneau 9H démarrage machine en mode linac

chauffage klystron ok

chiller ok
 scan_Laser_vs_RF_phase_2024_02_26_10_41.pngScreenshot_from_2024-02-26_12-13-46.png 
  848   Wed Feb 28 08:49:30 2024 VC, VM, VKUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Commintionning RING demarrage machine 8H50

Alim

EL/PS/DPI.01 demarrage à
 health_check_2024_02_28_08_50.pngScreenshot_from_2024-02-28_11-47-13.pngScreenshot_from_2024-02-28_15-34-51.pngScreenshot_from_2024-02-28_16-50-50.png 
  858   Tue May 14 17:50:45 2024 Entered by Marie Jacquet from 134.158.89.45 on Tue May 14 17:50:15 2024 Ligne XLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Camera PILATUS: instructions to use    CAMERA_PILATUS-Instructions_1.pdf 
  859   Wed May 15 10:52:19 2024 Entered by Super Team from 134.158.195.141 on Wed May 15 10:51:59 2024 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section sortie PA 120W ---> pas assez pour obtenir
la puissance nominale Klystron, sortie puissance
PA devrait etre autour de 400 W
  
  860   Wed May 15 15:23:14 2024 MEK, HG, DNNot FixedProblemLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section Disjonction de PA 15h00=

Disjonction de PA 15h36

Etape 1 conditionnement : 1µs
 plots_vide_section.png 
  862   Thu May 16 08:38:19 2024 MEK, RC,VC, VKUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 16/05 conditionnement démmare à
7.4 dB atténuation section ( ) pour
une largeur impulsion RF 1µs et fréquence
 vide_cond_16_may_.png 
  863   Fri May 17 08:08:29 2024 MEK SC SV DNUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 17/05 set to standby modulateur 8h05

demarrage modulateur à 9h

impossible de passer à 1220V
  
  864   Tue May 21 08:33:12 2024 MEK, SC, KD, IC, MOUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 21/05 8h15 impossible de mettre " standby"
du modulateur ==> la pompe de refroidissement
n'est en marche
 red_pitayafrom_2024-05-21_17-39-23.png 
  865   Wed May 22 08:47:19 2024 MEK,KDUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 22/05 8h45 : mise en marche de modulateur "set
to standby "

9h50 : démarrage, passage
 scope_3dB_2us_apres_claquage.pngscope_2dB_2us_apres_claquage.pngscope_1_7dB_2us_mauvais_reflechis.pngscope_1_7dB_2us_reflechis_OK.png 
  866   Thu May 23 08:19:19 2024 M EK, ND, Iryna, VictorUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 23/05 8h15: set to standby Modulateur

démarrage frigo et chiller
section
 RF_signals_1.7dB_1µs_1HzAtt1dB_2us_1Hz_2024-05-23_14-51-45.pngScr_0.6_us_0.6_dB_2024-05-23_17-01-31.png 
ELOG V3.1.4-395e101