  810   Thu Oct 26 09:02:33 2023 VC,SC, ND, IC, VK, CB, V LinacLI | TL | Ring Linac 8h30 Mise en chauffe

Pas d'internet sur client1
et client2
  
  1149   Wed Nov 12 10:29:49 2025 Entered by Super Team from 134.158.76.9 on Wed Nov 12 10:29:34 2025Under ProcessShift summaryLI | TL | Ring   15h09 Cycling all magnets

15h12 HV is ON

15h15 The modulator was set to
  
  1162   Thu Dec 4 08:59:07 2025 Entered by Super Team from 134.158.195.141 on Thu Dec 4 08:58:52 2025 Shift summaryLI | TL | Ring Preparation/check of the 70 MeV WP for X-ray run Goal: preparation and checking the machine
operation at 70 MeV and 40 MeV (ideally with
X-rays)
 Screenshot_from_2025-12-04_16-10-14.pngScreenshot_from_2025-12-04_17-38-20.pngScreenshot_from_2025-12-04_18-01-39_WITH_EL.png 
  1000   Tue Jan 21 08:08:43 2025 KDUnder ProcessShift summaryLI | TL | Linac Commissionning | Ring Commissioning shift du 21 janvier 2025 8h10 : mise en chauffe à distance
(modulateur, laser, frigo/chiller)
  
  741   Tue Apr 25 14:19:49 2023 CB Shift summaryLI | TL | Linac Commissionning run du 20 avril 2023 icon13.gif Suite du run du 19 avril : objectif mesure
des twiss pour plusieurs valeur de solénoides
à partir de 180A
 coil2scan_11h46.png20230420.pptx 
  1009   Wed Feb 12 08:00:31 2025 KD MJUnder ProcessShift summaryLI | TL | Linac Commissionning shift du 12 février 2025 - Alignements 8h: mise en chauffe à distance (modulateur,
frigo, chiller, laser)

9h30: laser semble pas aligné
 2025-02-12-Shift.pngaxes_BPM_calib.jpgaxes_BPM_nocalib.jpg 
  1148   Mon Nov 10 16:15:53 2025 KD, M2 GIFixedShift summaryLI | TL | Linac Commissionning shift du 10 novembre 2025 8h: mise en chauffe en remote (modulateur,
laser, frigo/chiller)

10h: Démarrage machine
  
  687   Mon Feb 20 08:30:57 2023 KD, MJ, HGUnder ProcessShift summaryLI | TL | LE | Vide | Linac Commissionning shift du 20 février 2023 8h30 : Mise en chauffe de la machine (frigo,
chiller, laser, modulateur)

fosse vidée + circuit d'eau
 quad1_3_zero.pngrecette_20230217_quad1_3.png2023-02-20_15_29_20_tl_dg_sst_01-ccd_01_RAW.pnginjection_RING_recette_20230220_17_07_34.pngScreenshot_BPMs_Trend_from_2023-02-20_18-14-59.png 
  Draft   Mon Feb 20 10:16:18 2023 NDUnder ProcessShift summaryLI | TL | LE | Vide | Linac Commissionning RE: shift du 20 février 2023 Healthcheck signal effectivement un probleme
sur toute les vannes...  Et les atkpanels
signalent un problème de communi
 Capture_d’eÌcran_2023-02-20_aÌ€_10.15.37.png 
  689   Mon Feb 20 10:19:56 2023 NDUnder ProcessShift summaryLI | TL | LE | Vide | Linac Commissionning RE: shift du 20 février 2023 Healthcheck signal effectivement un probleme
sur toute les vannes...  Et les atkpanels
signalent un problème de communication...
 pb_vide_hc.pngpb_vide_atk.png 
  Draft   Thu Nov 13 08:00:59 2025 KD MJ VM HGFixedShift summaryLI | TL | LE | Ring | Opt | Linac Commissionning | Ring Commissioning shift du 13 novembre 2025 - spectres a differentes valeurs de bpmTL2_X Apres que Kevin a regle tous les problemes
synchro signal bpm etc etc etc

L'interface SST ne fonctionne
  
  840   Fri Feb 2 08:16:50 2024 Entered by Super Team from 134.158.195.141 on Fri Feb 2 08:16:31 2024Under ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning Shift du 2 février 2024 La clé PA est resté enclenchée
hier. Il faut penser à la tourner
avant de partir (demande de Maher)
 Screenshot_2024-02-02_12-05-19.png 
  977   Tue Dec 10 11:35:16 2024 VM,HG,SCUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning 50 and 70 MeV Emittance, and transport  Intervention chiller (Maher) : maintenance
nécessaire à prévoir
(clé outil clignote)
 Q_vs_SolenoScan_at_16-52-02_Q1_Off.pngQ_vs_SolenoScan_at_16-39-39_recette_good_xrays.png 
  1141   Thu Oct 23 07:45:25 2025 KD RC VC MJUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning shift du 23 octobre 2025 7h45: mise en chauffe en remote (modulateur,
laser, frigo/chillers, cyclage)
8h45 : mise en route Modulateur
  
  1176   Wed Jan 7 07:55:45 2026 VM DN MJ KDUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning shift du 07 janvier 2026 7h55: mise en chauffe en remote (modulateur,
frigo/chillers, laser, cyclage)
11h25 HV is ON
 16x 
  1177   Thu Jan 8 09:07:08 2026 IC, HG, RC, DN, JMUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning Test of the new receipt from BMAD Isol = 242 A 8h55: mise en chauffe (modulateur, frigo/chillers,
laser, cyclage)

10h20 HV ON
 13x 
  1185   Wed Jan 21 07:56:59 2026 KD MJ RC DNUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning Position Horiz FPC ("spectres dromadaires") 7h55: mise en chauffe en remote (modulateur,
cyclage, laser, frigo/chillers)
==> plus de trig sur la machine
  
  838   Thu Feb 1 11:50:28 2024 MJNot FixedShift summaryLI | TL | LE | Ring | Linac Commissionning Attenuateur LIL / Puissance LIL / Energie electrons La puissance entree canon a ete verifie
et conforme a l'atterndu (6 MW = 18/3
MW)
  
  817   Wed Nov 15 09:13:06 2023 KD, MJ, RCUnder ProcessShift summaryLI | TL | LE | Ring | Laser | Opt | SY shift du 15 novembre 2023 9h : mise en chauffe de la machine

12h: intervention Iryna et Slava
pour un meilleur stockage dans l'anneau
 6x 
  1160   Tue Dec 2 09:28:15 2025 Entered by Super Team from 134.158.205.28 on Tue Dec 2 09:27:54 2025Not FixedInfoLI | TL | LE | Ring | Diag | Linac Commissionning | Ring Commissioning Shift ThomX/Xrays : Soucis démarrage icon4.gif Last Recettes for 50 MeV:

recipe_recipe_LI_TL_RI_good_20251127_12_42_51.txt

recipe_recipe_LI_TL_RI_good_20251125_16_42_01.txt
 Screenshot-ICTLI.png 