  Draft   Mon Mar 9 12:55:30 2026 Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026    Restart after strange last shift  12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen
put last motor positions (2266 &&
  
  Draft   Fri Mar 13 08:33:25 2026 Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026      08h32 Warm-up ThomX: Modulator, Laser,
Fridge

08h37 Chillers were started, cycling
  
  Draft   Thu Mar 19 07:46:50 2026 Entered by Super Team from 127.0.0.1 on Thu Mar 19 07:46:39 2026    , entered from 127.0.0.1 7h45: mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)

8h46 The photocathode laser image
  
  Draft   Fri Mar 20 07:20:47 2026 IC, VMUnder ProcessShift summary  Work on orbit at 70 MeV for X rays 7h20: mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)

08h55 HV is ON
 xorbit70MeV_Xrays_20032026.pngyorbit70MeV_Xrays_20032026.pngScreenshot_from_2026-03-20_15-49-43.pngY_orbit61.5MeV4Xrays.pngX_orbit61.5MeV4Xrays.png 
  Draft   Thu Mar 26 07:39:02 2026 IC, VM, DN, MJUnder ProcessShift summary    7h37 : mise en chauffe en remote (frigo/chiller,
modulateur, laser, cyclage)

08h57 HV is ON
 MRSV_Size_vs_LaserPhase.pngHorOrbit_vs_LaserPhase.pngMRSV17h38.pngDispersionAfterLOCO20260326_16h54.png20260326_18h24_TL_Dispersion.png 
  Draft   Thu Apr 2 07:55:49 2026 IC,VMUnder ProcessShift summary    7h50 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

08h58 HV is ON
  
  Draft   Fri Apr 3 07:51:41 2026 IC,VM, NDUnder ProcessShift summary  , entered from 127.0.0.1 7h50 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

9h30 HV is ON
  
  Draft   Wed Apr 8 07:29:51 2026 7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)    , entered from 127.0.0.1 7h30 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

8h30 HV is ON
  
  Draft   Thu Apr 9 08:11:33 2026 IC,VMUnder ProcessShift summary    8h10 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

09h12 HV is ON
  
  Draft   Fri Apr 10 07:39:37 2026 IC,VMUnder ProcessShift summary    7h40 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

08h43 HV is ON
  
  Draft   Thu Apr 16 07:32:25 2026 Entered by Super Team from 127.0.0.1 on Thu Apr 16 07:32:14 2026    , entered from 127.0.0.1 7h30 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

9h00 HV is ON
 Screenshot_from_2026-04-16_20-53-14.pngScreenshot_from_2026-04-16_20-53-34.png 
  Draft   Mon Apr 20 10:37:11 2026 IC Shift summary    10h30 : mise en chauffe  (frigo/chillers,
modulateur, laser, cyclage)

All rondes are broken, THOMX key
  
  Draft   Wed Apr 22 10:26:28 2026 IC,VM      Dalkia solved the problem with vooling
circuit in the morning

10h15 mise en chauffe  (frigo/chillers,
  
  Draft   Thu Apr 23 09:06:22 2026 IC, VM      9h00 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)
  
  Draft   Fri Apr 24 08:05:11 2026 Entered by Super Team from 127.0.0.1 on Fri Apr 24 08:05:02 2026    , entered from 127.0.0.1 8h00 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)
  
  Draft   Wed Jun 3 08:41:41 2026 IC, HG, JNC Shift summary  Restart of the accelerator 02/06/2026

~15h30 Starting all system

16h Start up of the modulator,
  
  Draft   Tue Jun 9 10:13:24 2026 Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026      10h02 Start-up modulator, laser, fridge,
chillers

The SF6 pressure is low. Magnet
  
  Draft   Tue Jun 16 11:34:11 2026 IC, VM Shift summary  Restart of the accelerator 11h20 Try to restart the accelerator. Start-up
modulator, laser, fridge, chillers

Problem, with all magnets control
  
  Draft   Thu Jun 18 07:37:17 2026 IC, VM Shift summary  Ring working point studies 07h35 Start-up modulator (does not go to
standby), laser, magnets, cycling.

9h50 HT ON
  
  Draft   Tue Jun 23 09:43:31 2026 Entered by Super Team from 127.0.0.1 on Tue Jun 23 09:43:18 2026 Shift summary  Vaccum in the FPC 09h00 Start-up modulator, laser, fridge,
chillers

After discussion with Daniele
  