ID Date Author Status Type Categorydown Important Subject Icon Text Attachments
  815   Thu Nov 9 09:02:39 2023 KDReference SolutionShift summaryLI | TL | LE | Ring | Diag | CC | Laser | Opt | RF Anneau | SY | Linac Commissionning | Ring Commissioning shift du 09 novembre 2023 8h30 : démarrage machine (laser,
klystron, chiller, frigo, aimant)

* Beaucoup de problème de
  
  Draft   Thu Dec 18 09:39:38 2025 DN, IC, HG, KD, MJ, and Co Shift summaryLI | TL | LE | Ring | Diag | Aimants | Laser | Vide | Linac Commissionning | Ring Commissioning X-ray measurement/characterization campaign The machine was warmed up remotemy

The FPC is ready. The laser is locked.

9h Start HV
 Q_missed_2025-12-18_13-50-19.png 
  819   Fri Nov 17 08:28:18 2023 VC/SCUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | SY | Linac Commissionning | Ring Commissioning Commissionning LE 8h20 demararage machine

laser PC

Frifo chiller
  
  867   Fri May 24 08:21:49 2024 MEK , SC, Victor, Vincent Under ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Ring Commissioning Conditionnement section 24/05 8h10: set to standby Modulateur

Démarrage Frigo et Chiller

8h30 - 9h : intervention de Kevin
 1_1dB_3us_1Hz.pngScreenshot_1.6dB_3us_2024-05-24_17-05-27.pngclaquage_1_1dB_3us_1Hz.pdfpassage_5Hz_3us_1dB.pdf 
  720   Mon Mar 27 13:55:41 2023 Entered by Super Team from 134.158.195.141 on Mon Mar 27 13:55:24 2023Under ProcessInfoLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Etat ThomX  Cavité FP a terminé son intervention

Mise sous vide possible cette après-midi

14h Intervention IHM cavité
  
  777   Fri Jun 23 13:56:03 2023 all Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning X detectes aujourd'hui Aujourd'hui on a detecte des X en mode
desynchro (notre signal correspond a ~ 3.10**6
ph/sec)
 2023-06-23-Shift.pdf 
  791   Mon Aug 21 09:10:35 2023 KDUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning redémarrage machine 21/08/2023 9h: redémarrage des systèmes.

- pompes boucle de refroidissement
(pompe primaire, pompe échangeur,
 2023-08-21_15_59_49_li_op_las_02_profile_laser_PC_log_scale_True_despeckle_False_Auto_scale_True.pngScreenshot_from_2023-08-21_17-54-55.png 
  837   Thu Feb 1 08:10:14 2024 VK VC HG SC MEUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commitionning 8h10 rémarrage machine chauffage
klystron frigo et chiller

pB DS   calc/er_sy/rac.17-elr.01-rdp.0X.Y 
  
  842   Tue Feb 6 08:52:28 2024 VC MJ KDUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commissionning 8h45 demarrage machine

modulateur frigo ampli laser chiller
et cyclage des aimants
 7x 
  843   Tue Feb 6 20:21:38 2024 Entered by Marie Jacquet from 134.158.89.45 on Tue Feb 6 20:21:21 2024FixedShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning commissioning 14h - Mesures SPR radiations accelerateur

Beam shutter securite ne
remonte plus --> Mesure SPR X-hutch
  
  846   Mon Feb 26 09:07:06 2024 VC, VK, VM, IC, NDUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning redemarage machine après Ă©longation anneau 9H démarrage machine en mode linac

chauffage klystron ok

chiller ok
 scan_Laser_vs_RF_phase_2024_02_26_10_41.pngScreenshot_from_2024-02-26_12-13-46.png 
  848   Wed Feb 28 08:49:30 2024 VC, VM, VKUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Commintionning RING demarrage machine 8H50

Alim

EL/PS/DPI.01 demarrage à
 health_check_2024_02_28_08_50.pngScreenshot_from_2024-02-28_11-47-13.pngScreenshot_from_2024-02-28_15-34-51.pngScreenshot_from_2024-02-28_16-50-50.png 
  858   Tue May 14 17:50:45 2024 Entered by Marie Jacquet from 134.158.89.45 on Tue May 14 17:50:15 2024 Ligne XLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Camera PILATUS: instructions to use    CAMERA_PILATUS-Instructions_1.pdf 
  859   Wed May 15 10:52:19 2024 Entered by Super Team from 134.158.195.141 on Wed May 15 10:51:59 2024 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section sortie PA 120W ---> pas assez pour obtenir
la puissance nominale Klystron, sortie puissance
PA devrait etre autour de 400 W
  
  860   Wed May 15 15:23:14 2024 MEK, HG, DNNot FixedProblemLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section Disjonction de PA 15h00=

Disjonction de PA 15h36

Etape 1 conditionnement : 1µs
 plots_vide_section.png 
  862   Thu May 16 08:38:19 2024 MEK, RC,VC, VKUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 16/05 conditionnement démmare à
7.4 dB atténuation section ( ) pour
une largeur impulsion RF 1µs et fréquence
 vide_cond_16_may_.png 
  863   Fri May 17 08:08:29 2024 MEK SC SV DNUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 17/05 set to standby modulateur 8h05

demarrage modulateur à 9h

impossible de passer à 1220V
  
  864   Tue May 21 08:33:12 2024 MEK, SC, KD, IC, MOUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 21/05 8h15 impossible de mettre " standby"
du modulateur ==> la pompe de refroidissement
n'est en marche
 red_pitayafrom_2024-05-21_17-39-23.png 
  865   Wed May 22 08:47:19 2024 MEK,KDUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 22/05 8h45 : mise en marche de modulateur "set
to standby "

9h50 : démarrage, passage
 scope_3dB_2us_apres_claquage.pngscope_2dB_2us_apres_claquage.pngscope_1_7dB_2us_mauvais_reflechis.pngscope_1_7dB_2us_reflechis_OK.png 
  866   Thu May 23 08:19:19 2024 M EK, ND, Iryna, VictorUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 23/05 8h15: set to standby Modulateur

démarrage frigo et chiller
section
 RF_signals_1.7dB_1µs_1HzAtt1dB_2us_1Hz_2024-05-23_14-51-45.pngScr_0.6_us_0.6_dB_2024-05-23_17-01-31.png 