| ID |
Date |
Author |
Status |
Type |
Category |
Important |
Subject |
Icon |
|
608
|
Wed Oct 26 14:13:16 2022 |
Entered by Super Team from 134.158.195.141 on Wed Oct 26 14:13:01 2022 | | Urgent | Linac Commissionning |
|
BPM TL 2, 3 et 4 ? | |
Les BPM TL 2 3 et 4 ont l'air fige . Les valeurs sur 'ihm sont totalement figees ...
Tu peux verifier Nicolas Stp
|
|
942
|
Wed Oct 23 17:30:58 2024 |
Entered by Super Team from 134.158.195.141 on Wed Oct 23 17:27:14 2024 | Under Process | Shift summary | Linac Commissionning |
|
| |
Gun phase 50 dg., At 0.5 dB; Sect phase 230 dg. At 2.65 dB; Sol. 220 A, Gun charge -131 pC, Linac -112 pC, TL -120 pC.
Linac steerers: H [2.2 -3.83], V [-1.46 2.1].
It was atempt to measure dispersion xith TL/BPM2 and the section attenuator. See figure.
It was atempt to measure dispersion xith TL/BPM2 and the section attenuator. See figure. It is unpossible to check TL/BPM2 with the TL/SST.02 camera because a lot of bright spots on the image.
17h50 end of the shift. |
|
179
|
Wed Nov 24 16:52:29 2021 |
Entered by Super Team from 134.158.195.141 on Wed Nov 24 16:52:10 2021 | Under Process | Linac | Linac Commissionning |
|
Mesure d'energie | |
Calibration Ecran TL-SST01
|
|
178
|
Wed Nov 24 11:21:41 2021 |
Entered by Super Team from 134.158.195.141 on Wed Nov 24 11:21:24 2021 | Under Process | Linac | Laser | Linac Commissionning |
|
shift du 24 Novembre 2021 | |
Laser :
- Viktor a remis le hublot pour gagner en stabilité laser
- Energie laser : 54 µJ
- laser beaucoup plus stable :
- mean x 5253.12 µm +/- 43.89 µm
- mean y 2941.86 µm +/- 70.49 µm
- FWHM x 1690.52 µm +/- 170.79 µm
- FWHM y 1367.08 µm +/- 36.47 µm
Charge :
- Scan nous donne une charge max à 263°
- Solénoides : 225 A pour avoir l'image sur SST01 du Linac.
- Image en PJ : saturation observée à charge max sur le Yag LI_SST01
- Solénoide à 195 (250 sur Atténuateur laser pour ne pas saturer le Yag) pour avoir un spot très petit sur le Yag : taille x= 0.36, y = 0.8 mm
|
|
Draft
|
Wed Nov 5 12:50:55 2025 |
Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025 | | | |
|
| |
Matin :
Soucis synchro :
- Nicolas les a redémarré
- kevin est vebu vérifier la synchro du laser, le signal du 500 Mega un peu faible (à vérifer)
- toujours des coups perdus
Soucis Alims :
Dipole --> 250A impossible de forcer 159.3
- currentSetpointPM=159.3
- currentSetpoint=250=Current ...
Ds passé en erreur. Ok L'alim était en local ....
Soucis phase section :
Problem with calc/li_hfi/write_dep.01-mot.01 does not work.
To change section phase li/hfi/dep.01-mot.01 was used
18h08 Unable to get low energy spread on TL sst2. It seems we observed a scattered beam.
18h15 Gave up. Stop ThomX |
|
859
|
Wed May 15 10:52:19 2024 |
Entered by Super Team from 134.158.195.141 on Wed May 15 10:51:59 2024 | | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Conditionnement section | |
sortie PA 120W ---> pas assez pour obtenir la puissance nominale Klystron, sortie puissance PA devrait etre autour de 400 W
Pb resolu : un connecteur etait mal serre sur le synthétiseur change lundi 13mai 2024
impossible de démarrer le DS conditionning
|
|
457
|
Wed May 11 18:32:38 2022 |
Entered by Super Team from 134.158.195.141 on Wed May 11 18:32:20 2022 | Under Process | Info | Linac Commissionning |
|
Run machine : JNC/HG | |
But du run :
refaire le transport jusqu'au DUMP en vérifiant le transport (steerers entrée section).
Laser :
pas centré dans l'iris

Apres correction sur M5:

Iris (li/op/opt.01-dia.01-mot.01) : Position : 2 mm
Stabilité Laser :
mean x 5136.50 µm +/- 9.84 µm
mean y 3521.23 µm +/- 20.95 µm
FWHM x 1129.35 µm +/- 8.70 µm
FWHM y 1151.89 µm +/- 12.77 µm
Position : 1.5 mm

Stabilité :
mean x 5154.80 µm +/- 6.80 µm
mean y 3532.75 µm +/- 12.97 µm
FWHM x 980.17 µm +/- 5.79 µm
FWHM y 1003.99 µm +/- 9.83 µm
Charge phase : plusieurs position du moteur d'atténuation ont été utilisés : 400 (Att min) 350 et 300 : /data/shared/Commissioning_tools/Mesure/20220511/Charge_phase
Phase de Charge max : 346-347° --> Charge max 40pC pour une Atténuation à 300.
Saut de phase (150° environ) entre hier et aujourd'hui suite certainement au redémarrage du laser.

Réglage alignement Solénoide :
Reprises de l'alignement TX0 TY 2.4 RX 6 RY -5
Att Laser 330 , Q 94pC
Scan phase LIL :
/tmp_mnt/data/shared/Commissioning_tools/Mesure/20220511/Scan_Data_Allign_LIL/
derniere valeur : LI_STR_1H-0.0_LI_STR_1V-0.0_LI_STR_2H-1.22__LI_STR_2V0.37

|
|
411
|
Wed Mar 23 12:52:58 2022 |
Entered by Super Team from 134.158.195.141 on Wed Mar 23 12:52:44 2022 | Under Process | Linac | Electronique | Linac Commissionning |
|
Test des redpitaya baie 17 | |
Point de départ :
- Signal d'entrée : Générateur AFG Techtro, Sortie sur 50 Ohm
--> Sin(f=10kHz) Amplitude : 200 mV CC
--> Signal non synchrone avec le timing
Redpitaya 4 --> ER/SY/RAC.17-ELR.01-RDP.04 Channel A

Signal entre : -2 et 3 (V ?)
Redpitaya 4 --> ER/SY/RAC.17-ELR.01-RDP.04 Channel B

Signal entre : -4 et 6 (V ?)
Redpitaya 1 --> ER/SY/RAC.17-ELR.01-RDP.01 Channel B

Redpitaya 1 --> ER/SY/RAC.17-ELR.01-RDP.01 Channel A

Redpitaya 3--> ER/SY/RAC.17-ELR.03-RDP.01 Channel B

Redpitaya 3 --> ER/SY/RAC.17-ELR.03-RDP.01 Channel A

redpitaya 4
A sortie (-2 3)
B sortie (-4 6)
redpitaya 1
A sortie (-2 3)
B sortie (-2 3)
redpitaya 3
A sortie (-2 3)
B sortie (-2 3) attention rupture acquisition
|
|
395
|
Wed Mar 9 11:37:29 2022 |
Entered by Super Team from 134.158.195.141 on Wed Mar 9 11:37:15 2022 | Under Process | Linac | Diag | Linac Commissionning |
|
Demarrage machine (JNC/HG) | |
Laser :
- 25 µJ
- Images sauvées : /data/shared/Commissioning_tools/Mesure/20220309/Laser
Stabilité :
|
|
1093
|
Wed Jun 25 18:47:20 2025 |
Entered by Super Team from 134.158.195.141 on Wed Jun 25 18:47:07 2025 | Under Process | Shift summary | LI |
|
Laser position |
|
New laser position :
5.041
4.448
Charge : 1.3 mm Iris + 420 Attenuation : 500 pC (Qmax)
|
|
1089
|
Wed Jun 18 12:45:49 2025 |
Entered by Super Team from 134.158.195.141 on Wed Jun 18 12:45:28 2025 | Under Process | Info | Linac Commissionning |
|
Linac measurement + phase + | |
- Phi Qmax ; 324° : Phi Emax : 274°
- Qmax : 70-80 pC (Att : 290°) and 300 pC (Att : 420°)
- Recipt : 50MeV_100pC_20250527_14_10_19.txt
- Att Section : 2.45 dB, phi min disp : 209°
- Quad align done
13h20 : Pause
13h30 ND operateur.
Acces controle
Alignement ligne streak linac
14h50 Laser alignement.
Travail sur chassis laser en cours et prioritaire.
Allumage kicker injection
La voie 19 du generateur de retrad des diags etait toujurs connectee au scope avec le smemes regalges que la voie 8.
On remet les wavecatcher sur les reglages anterieurs.
15h40
img5=HV
img6=Trig
Beam ON
On observe pas de probleme sur les ICT.
Charge IC22 / ICT3 non lue soucis WC ... ? On regarde Spsum sur BPM pour voir que la charge reste constante, les positions sur TLBPM2 ne bougent pas ( X=0.1 Y =2)
Trend de la phase 
pas de mesure de longueur aujourd'hui 
Quelques mesure
Goal: bunch length measurement in the transfert line to improve the model. Parameters to vary : phase (Section) , charge, laser size (? should not play a role), laser length (see with Viktor) |
|
495
|
Wed Jul 6 09:37:10 2022 |
Entered by Super Team from 134.158.195.141 on Wed Jul 6 09:36:51 2022 | | Shift summary | RF D1 |
|
| |
9h40 pemplissage réseau eau, mise en route modulateur et chillers
|
|
494
|
Wed Jul 6 09:20:53 2022 |
Entered by Super Team from 134.158.195.141 on Wed Jul 6 09:20:39 2022 | | Shift summary | RF D1 |
|
| |
J'arrete pour remplir le réseau eau ( il est à 2 bar )
Maher
|
|
493
|
Wed Jul 6 09:03:06 2022 |
Entered by Super Team from 134.158.195.141 on Wed Jul 6 09:02:45 2022 | Under Process | Shift summary | Diag | Laser | Linac Commissionning |
|
Q beam versus E laser | |
9H demarrage chauffage Klystron + frigo
9H 10 demarrage chiller canon et section |
|
1097
|
Wed Jul 2 14:45:20 2025 |
Entered by Super Team from 134.158.195.141 on Wed Jul 2 14:45:07 2025 | Under Process | Info | LI |
|
| |
Vérif position laser photocathode :
--> bouge de 1mm en Y et 0.2 en X
Nouvelle position:
--> bouge de <0.3 en X et 0 en Y.
Qmax : 321°
Emax : 271°
Quad Align :
- 'steerers : ', li/ps/str.01-h, v 1.0406, -2.4368
- 'steerers : ', li/ps/str.02-h, v -3.2289, 2.8844
|
|
235
|
Wed Jan 5 17:35:11 2022 |
Entered by Super Team from 134.158.195.141 on Wed Jan 5 17:34:46 2022 | Reference Solution | Info | Laser | Linac Commissionning |
|
Iris Motorisé | |
[KD et HG]
- Mise en place de l'iris motorisé à peu près à l'endroit ou se trouvait l'autre iris (+/- 1 cm).
- Le Ds doit être installé par le CC
|
|
234
|
Wed Jan 5 15:25:30 2022 |
Entered by Super Team from 134.158.195.141 on Wed Jan 5 15:25:13 2022 | Under Process | Problem | RF D1 | Linac Commissionning |
|
Interventon Modulateur | |
Soucis modulateur qui ne passe pas en HV.
--> [MO, JN] : Intervention sur le modulateur. |
|
236
|
Wed Jan 5 17:41:03 2022 |
Entered by Super Team from 134.158.195.141 on Wed Jan 5 15:25:13 2022 | Under Process | Problem | RF D1 | Linac Commissionning |
|
RE: Interventon Modulateur | |
soucis Modulateur toujours pas réglé. Un signal (dans un module d'automate du modulateur) semble poser problème.
Maher a contacté scandinova.
| Entered by Super Team from 134.158.195.141 on Wed Jan 5 15:25:13 2022 wrote: |
|
Soucis modulateur qui ne passe pas en HV.
--> [MO, JN] : Intervention sur le modulateur.
|
|
|
1014
|
Wed Feb 19 08:28:11 2025 |
Entered by Super Team from 134.158.195.141 on Wed Feb 19 08:27:57 2025 | Under Process | Shift summary | Ring Commissioning |
|
| |
08h26 Start ThomX: Modulator, Fridge, Laser
08h32 Chillers were started, cycling all magnets
11H changement de la carte synchro... Carte synchro opérationnel
Impossible d'avoir un signal sur l'ICT1 qq soit la phase ==> synchro ??
Vincent est repasse c ok
13h20 Receipt from 202514_14_21_55 loaded (suitable for 50 MeV), injector adjusted, there is a beam in the ring without RF and with RF 50 kV, 36.5 dg. It is necessary to adjust the injection (storage is not too bad, but TL/BPM2 x=+7.5). The injection kicker affects the radio protection system, causing blocking.
13h55 the modulator is in the standby mode, the laser shutter is closed
|
|
311
|
Wed Feb 9 16:59:58 2022 |
Entered by Super Team from 134.158.195.141 on Wed Feb 9 16:59:36 2022 | | Shift summary | Linac Commissionning |
|
| |
Arret du test longue durée à 17h00, pas d'interlock durant toute la période, pas d'interlock intempestif qui avait avant durant les tests depuis lundi aprèm ( 14h00 )
Maher |