  310   Wed Feb 9 09:13:04 2022 Entered by Super Team from 134.158.195.141 on Wed Feb 9 09:12:42 2022 Shift summaryLinac Commissionning   

Le modulateur à tourner toute la nuit on position Trig, je démarre  un essai de longue durée avec RF dans le canon et la section

Hier aussi nous avions toute l'aprèm de la RF dans le canon et la section

IHM RF signaux ne s'affichent pas, je re-demarre l'IHM

  1166   Wed Dec 10 10:45:33 2025 Entered by Super Team from 134.158.195.141 on Wed Dec 10 10:45:16 2025Under ProcessShift summaryLinac Commissionning   

8h30 : machine started on remote
50 MeV operation.
Problem with Yag-TL camera
--> try power off
Worked cool
Ajusterment retard camera : -20 µs / Gain 0 / exp 0.001s

Viktor : dispersion measurement.

Q-scan QP7, QP3

 

  203   Wed Dec 8 15:11:18 2021 Entered by Super Team from 134.158.195.141 on Wed Dec 8 15:10:57 2021Under ProcessInfoLinac Commissionning Run Linac alignement 

Operateurs : EG, HG

but : travailler sur l'alignement de la tete de machine

Laser :

Spot pas bien défini, toujours probleme avec le hublot.

difficile d'utiliser la position moteur pour optimiser (aligner le laser) car pas reproductible. Il faut prendre la position du faisceau laser, et notre alignement sera donné en position du laser sur la fausse cathode.

L'amplitude du signal de la photodiode dépend de l'alignement du Laser (moteurs M4). L'amplitude du signal est maximum pour un laser aligné.

Les algo d'optimisations ne peuvent pas fonctionner, il faut donc passer par une méthode de fit sur des données :

  • en faisant varier la phase autour du maximum de charge, nous faisons varier le déplacement du barycentre du faisceau (qu'on peut fitter avec une droite)
  • Le but est de minimiser cette pente (en valeur absolue)

Redpitaya :

on a mis les signaux RF (Vincent) sur les Redpitaya ainsi que le signal de photodiode. Il faudra vérifier les voies pour que les étiquettes soient correctes.

 

 

  202   Wed Dec 8 11:46:49 2021 Entered by Super Team from 134.158.195.141 on Wed Dec 8 11:46:36 2021FixedInfoLaser | Linac Commissionning Moteur Mirroir laser photocathode  

Operateur : EG, HG

 

Probleme constaté:

1 pas moteur fait déplcer le laser de 150 µm sur la photocathode (valeur trop élevée)

Résolution par Kevin (avec  IcepapCMS) :

1 pas moteur correspond maintenant à 15 µm

 

  1161   Wed Dec 3 11:09:12 2025 Entered by Super Team from 134.158.195.141 on Wed Dec 3 11:08:54 2025Not FixedInfoRF Anneau | Linac Commissionning | Ring Commissioning Demarrage ThomX icon1.gif 

Soucis Septum : Maher help crying

C'est résolu devil on est passé par les Atk pannel, et un moment il nous a écouté angel

Faisceau dans l'anneau avec recette : recipe_recipe_LI_TL_RI_good_20251125_18_31_45.txt
machine plutot stable.

Après la prise de donnée avec la cavité.

Quelques mesures machine alignée sur la section (recette du elog 1074)
-- Soléno scan et quad scan

Stop : 18h45

 

 

 

 

  196   Wed Dec 1 13:05:53 2021 Entered by Super Team from 134.158.195.141 on Wed Dec 1 13:04:57 2021Under ProcessLinacLinac Commissionning Alignements tete de machine 

Conditions

Phase RF :

On se place à la phase qui maximise l'energie des électrons.

  • Phase pour la charge max : 110° 

données : /data/shared/Commissioning_tools/Mesure/20211201/ChargePhase

  • Phase Energie max : 60°

Solénoides :

On allume les solénoides et on regarde le déplacement du centroide du faisceau. Plus le centroide se déplace plus le solénoide est désaligné. 

14h24 : Modulateur tombé ... on arrete le temps de manger du coup ...

Scan sur les moteurs des solénoides

  195   Wed Dec 1 11:45:03 2021 Entered by Super Team from 134.158.195.141 on Wed Dec 1 11:44:50 2021Under ProcessLinacLaser | Linac Commissionning alignement laser 

Laser:

Recentrer le faisceau laser dans la mire en agissant sur les moteurs M5.

Note : le pas moteur peut etre trop grand, difficile d'avoir une action précise.

Avant recentrage :

-1.400 mm
-0.160 mm

Apres recentrage :

-1.410 mm
-0.180 mm

 

Stabilité Laser :

 

  Draft   Tue Oct 28 08:40:22 2025 Entered by Super Team from 134.158.195.141 on Tue Oct 28 08:40:06 2025Under ProcessShift summary    

08h40 Warm-up ThomX: Modulator, Laser, Fridge

08h45 Chillers were started, cycling all magnets

09h45 HV is ON

09h49 HV was set to 1215 V

10h15 the receipt recipe_recipe_LI_TL_RI_all_20251023_12_06_10.txt was loaded, linac phases, section attenuator and steerers was adjusted

10h20 The beam is in the ring W/O RF. RF Gun phase 215 dg., Sect. phase 207 dg., Sect. Att. 2.47 dB, TL/BPM02 X=-2mm, Laser Att. 274,Charges (BPMs) -110, -109, -80, -80 ???

10h33 Data taking for different TL/BPM02 X

10h50 RF 100 kV, Phase 11 dg. YL/BPM02 x=-3 to -4 mm, Very good storage, but losses in the TL,  Check alignment

11h11 RF gun phase 202 dg. Secr. phase 206 dg. RF phase 3.5 dg. All charges are about -100 pC

11h27 TL/BPM02 X ==> 0 mm to minimize Sync. osc. Hor. Tun 0. 159

11h41 Hor. tun ==> 0.169

11h56 BBA

12h21 RF Gun phase ==> 207 dg.

12h32 Hv was set on standby

13h44 HV is ON

14h14 RF Gun phase ==> 211 dg.

16h52 Stop ThomX

  192   Tue Nov 30 10:31:04 2021 Entered by Super Team from 134.158.195.141 on Tue Nov 30 10:30:47 2021Not FixedProblemRF D1 | Linac Commissionning Soucis modulateur 

problèmes pour démarrer, il se met encore en défait pendant la periode de chauffe. Le probleme vu hier n'est donc pas réglé.

  633   Tue Nov 29 09:18:20 2022 Entered by Super Team from 134.158.195.141 on Tue Nov 29 09:18:00 2022 LinacLinac Commissionning Faisceau linac 

9h15 : Mise en chauffe modulateur, mise en route refroidissements

Clé fosse nord et fosse sud tournée en position ouverte sur le PSS 

Mise en trig du modulateur, pas de signaux RF sur l'IHM RF Plots du modulateur.

16h40 Faisceau

phase 215 degres de charge max

Pic approximatif redpitayas : 220 mV pour une HT de 1070V avec une temperature de consigne de 31.25 degres

 

  1157   Tue Nov 25 09:32:03 2025 Entered by Super Team from 134.158.195.141 on Tue Nov 25 09:31:46 2025Under ProcessShift summaryDiag | Ring Commissioning   

09h31 Warm-up ThomX: Modulator, Laser, Fridge

09h36 Chillers were started, cycling all magnets.

09h56 Unable to start MRSV and EL cameras. Need help.

10h33 HV is ON

10h40 HV set to 1215 V

11h24 Beam in the ring W/O RF

11h40 RF 100 kV, phase 3.7  dg. RF Gun phase 210 dg., Sect Att. 2.37 dB, Sect. phase 211 dg., Charges (BPMs) -161, -153, -158, -169 pC, Linac steerers H [0.88 -3.00], V [-2.52 3.08]. Receipt recipe_recipe_LI_TL_RI_good_20251106_16_23_16.txt

12h35 Vacuum interlock V1, restarted

Orbit correction, check with BBA and LOCO after adjusting the device indeces in MML.

16h46 Going to 70 MeV T sect. consigne 28.5ºC, Sect. Att. 0.137 dg., DP 255.8 A, TL/BPM02 X=-1.5 mm, 

As it was discussed before, the dipoles for unknown reasons were set to - 2A from nominal current in the saved receipt. We changed the current to the nominal one. Beam tuning ongoing for 70 MeV.

recipe_recipe_LI_TL_RI_good_20251125_18_31_45.txt W/O correctots in the ring, Manual phase shifter 6129, RF phase 14 dg.

to be continued.

18h40 Stop thomx

  176   Tue Nov 23 12:11:16 2021 Entered by Super Team from 134.158.195.141 on Tue Nov 23 12:11:01 2021Reference SolutionInfoLaser | Linac Commissionning energie laser 

La puissance laser aujourd'hui (23/11/2021) est de :

  - Sortie laser : 200 uJ
  - Sortie ligne de transport : 60 uJ
  - Injecté dans le canon (iris ouverte à 100%) : 47 uJ

La transmission de la ligne de transport est en baisse. Les Hublots sont en cause. Il faut augmenter la taille sur le hublot ou changer le coating de ce dernier.

Hublot d'entrée retiré :

- Puissance laser sortie ligne de transport : 105 uJ

 - Puissance iris ouverte 100% : 73 uJ

Kevin

  466   Tue May 24 09:12:27 2022 Entered by Super Team from 134.158.195.141 on Tue May 24 09:09:19 2022Under ProcessLinacLinac Commissionning Démarrage pour faisceau aujourd'hui 

OdJ : Prise de données pour le ML (SC, HG, VS, HM, VC)

Mise en chauffe modulateur et chillers

Centrage laser pour mesure energie

Valeurs initiales de M4 : Xposition : 896 et Yposition : 5477

Valeurs initiales de M5 : Xposition 0.300 Yposition = 0.465

Position de l'iris à 1.5 mm comme la semaine dernière

Position de l'attenuateur à 400 comme la semaine dernière aussi

Nouvelles valeurs M5 Xposition = 0.190 Yposition = 0.330

Energie laser = 50 uJ (VS)

La camera LI/DG/SST.01 ne s'affiche pas sur l'IHM, redemarrage des serveurs, camera ok

16H10 HM-VC

le modulateur a sauté 3 fois de suite (passage en mode trig) 

modulateur en stand by => Jean Noel et Alain vont dans la fosse faire les shadoks

 

  455   Tue May 10 14:03:55 2022 Entered by Super Team from 134.158.195.141 on Tue May 10 14:03:41 2022Under ProcessLinacLinac Commissionning Faisceau sur le premier ecran LI/DG/SST.01 

Image faisceau à phi = phiqmax - 40 = 100 degres, bobine de focalisation = 210 A sur LI/DG/SST.01

  409   Tue Mar 22 11:28:11 2022 Entered by Super Team from 134.158.195.141 on Tue Mar 22 11:27:07 2022Not FixedLinacLaser | RF D1 Signal Redpitaya 

Signal Photodiode :

Pour comprendre les échelles ainsi que le manque de dynamique, Viktor a retiré l'ampli pour voir directement le signal de photodiode sur les Redpitaya.

Redpitaya er/sy/rac.17-elr.01-rdp.04 ChannelB : soucis au niveau de la voie. 

 

 

  1027   Tue Mar 4 18:42:57 2025 Entered by Super Team from 134.158.195.141 on Tue Mar 4 18:42:42 2025Under ProcessLinacLI | TL Conditionnement Canon 

1- Conditionnement du Canon à 16 dB, on gagne un peu en vide. 

2- sautes du faisceau : vérification du signal avant la section. 

Signal visible sur les positions, voir les 2 images, avec ou sans steerer. 
hypothèse :

- si pas de saute sur le BPM-LI : le soucis est après le BPM, ou bien au niveau du BPM 
- sauf si le BPM n'est pas assez sensible, ou bien pas assez de recul pour un signal perturbé en amont. 

l'amplitude du signal semble aussi varier avec la taille faisceau. Pas de mesure systématique. 

 

18h45 : On ferme  

  377   Tue Mar 1 10:34:30 2022 Entered by Super Team from 134.158.195.141 on Tue Mar 1 10:34:10 2022Not FixedUrgentCC panneau IHM ne se lance pas [resolu] 

resolu

 

Voici l'erreur,

 

[18:20:30] operateur.thomx@client1:/tmp_mnt/data/operateur.thomx > IHM
MainThread     INFO     2022-03-01 10:30:19,883 TaurusRootLogger: Using "PyQt4" for Qt
MainThread     INFO     2022-03-01 10:30:19,950 taurus.qt.qtgui.icon.icon: Setting Tango icon theme (from /usr/local/lib/python2.7/dist-packages/taurus/qt/qtgui/icon/)
('------------ ', '/data/shared/Interfaces/panneaux/')
('HOME_IHM = ', '/data/shared/Interfaces/panneaux/')
('------------ ', '/data/shared/Interfaces/panneaux/')
Traceback (most recent call last):
  File "/data/shared/Interfaces/panneaux//PlateformeIHMThomX/PlateformeIHM.py", line 45, in <module>
    from IHM_charge import ChargeDevices
  File "/data/shared/Interfaces/panneaux//Diags/BPM/IHM_charge.py", line 14
SyntaxError: Non-ASCII character '\xc3' in file /data/shared/Interfaces/panneaux//Diags/BPM/IHM_charge.py on line 14, but no encoding declared; see http://python.org/dev/peps/pep-0263/ for details
 

  376   Tue Mar 1 09:08:55 2022 Entered by Super Team from 134.158.195.141 on Tue Mar 1 09:08:40 2022 Shift summaryLinac Commissionning   

démarrage chillers, modulateur ( en local )

pas de IHM modulateur meme pb que hier soir

  479   Tue Jun 14 09:56:16 2022 Entered by Super Team from 134.158.195.141 on Tue Jun 14 09:56:01 2022Under ProcessShift summaryLinac Commissionning Shift du jour 

10H demarrage chauffage Klystron et refroidissement.

10H30 fermeture casemate

11H00 trigg du modulateur

Réalignement soleno avec script de la veille

E max phase Q max -45 degrés (96 degrés) LIBPM :  x = 0.85mm; y= 0.65 soleno @180A

sans solenoides à phase Qmax : x= 1.1mm; y =0.85mm

 

 

  505   Tue Jul 12 12:27:38 2022 Entered by Super Team from 134.158.195.141 on Tue Jul 12 12:27:24 2022 Shift summaryRF Anneau   

12h00  Remplacement du PS par Scandinova et mise en route modulateur pour test mise en route frigo et chillers