| ID |
Date |
Author |
Status |
Type |
Category |
Important |
Subject |
Icon |
|
310
|
Wed Feb 9 09:13:04 2022 |
Entered by Super Team from 134.158.195.141 on Wed Feb 9 09:12:42 2022 | | Shift summary | Linac Commissionning |
|
| |
Le modulateur à tourner toute la nuit on position Trig, je démarre un essai de longue durée avec RF dans le canon et la section
Hier aussi nous avions toute l'aprèm de la RF dans le canon et la section
IHM RF signaux ne s'affichent pas, je re-demarre l'IHM |
|
1166
|
Wed Dec 10 10:45:33 2025 |
Entered by Super Team from 134.158.195.141 on Wed Dec 10 10:45:16 2025 | Under Process | Shift summary | Linac Commissionning |
|
| |
8h30 : machine started on remote
50 MeV operation.
Problem with Yag-TL camera
--> try power off
Worked 
Ajusterment retard camera : -20 µs / Gain 0 / exp 0.001s
Viktor : dispersion measurement.
Q-scan QP7, QP3
|
|
203
|
Wed Dec 8 15:11:18 2021 |
Entered by Super Team from 134.158.195.141 on Wed Dec 8 15:10:57 2021 | Under Process | Info | Linac Commissionning |
|
Run Linac alignement | |
Operateurs : EG, HG
but : travailler sur l'alignement de la tete de machine
Laser :
Spot pas bien défini, toujours probleme avec le hublot.
difficile d'utiliser la position moteur pour optimiser (aligner le laser) car pas reproductible. Il faut prendre la position du faisceau laser, et notre alignement sera donné en position du laser sur la fausse cathode.
L'amplitude du signal de la photodiode dépend de l'alignement du Laser (moteurs M4). L'amplitude du signal est maximum pour un laser aligné.
Les algo d'optimisations ne peuvent pas fonctionner, il faut donc passer par une méthode de fit sur des données :
- en faisant varier la phase autour du maximum de charge, nous faisons varier le déplacement du barycentre du faisceau (qu'on peut fitter avec une droite)
- Le but est de minimiser cette pente (en valeur absolue)
Redpitaya :
on a mis les signaux RF (Vincent) sur les Redpitaya ainsi que le signal de photodiode. Il faudra vérifier les voies pour que les étiquettes soient correctes.
|
|
202
|
Wed Dec 8 11:46:49 2021 |
Entered by Super Team from 134.158.195.141 on Wed Dec 8 11:46:36 2021 | Fixed | Info | Laser | Linac Commissionning |
|
Moteur Mirroir laser photocathode | |
Operateur : EG, HG
Probleme constaté:
1 pas moteur fait déplcer le laser de 150 µm sur la photocathode (valeur trop élevée)
Résolution par Kevin (avec IcepapCMS) :
1 pas moteur correspond maintenant à 15 µm
|
|
1161
|
Wed Dec 3 11:09:12 2025 |
Entered by Super Team from 134.158.195.141 on Wed Dec 3 11:08:54 2025 | Not Fixed | Info | RF Anneau | Linac Commissionning | Ring Commissioning |
|
Demarrage ThomX |
|
Soucis Septum : Maher help 
C'est résolu  on est passé par les Atk pannel, et un moment il nous a écouté 
Faisceau dans l'anneau avec recette : recipe_recipe_LI_TL_RI_good_20251125_18_31_45.txt
machine plutot stable.
Après la prise de donnée avec la cavité.
Quelques mesures machine alignée sur la section (recette du elog 1074)
-- Soléno scan et quad scan
Stop : 18h45
|
|
196
|
Wed Dec 1 13:05:53 2021 |
Entered by Super Team from 134.158.195.141 on Wed Dec 1 13:04:57 2021 | Under Process | Linac | Linac Commissionning |
|
Alignements tete de machine | |
Conditions
Phase RF :
On se place à la phase qui maximise l'energie des électrons.
- Phase pour la charge max : 110°
données : /data/shared/Commissioning_tools/Mesure/20211201/ChargePhase
Solénoides :
On allume les solénoides et on regarde le déplacement du centroide du faisceau. Plus le centroide se déplace plus le solénoide est désaligné.
14h24 : Modulateur tombé ... on arrete le temps de manger du coup ...
Scan sur les moteurs des solénoides |
|
195
|
Wed Dec 1 11:45:03 2021 |
Entered by Super Team from 134.158.195.141 on Wed Dec 1 11:44:50 2021 | Under Process | Linac | Laser | Linac Commissionning |
|
alignement laser | |
Laser:
Recentrer le faisceau laser dans la mire en agissant sur les moteurs M5.
Note : le pas moteur peut etre trop grand, difficile d'avoir une action précise.
Avant recentrage :
-1.400 mm
-0.160 mm
Apres recentrage :
-1.410 mm
-0.180 mm
Stabilité Laser :
|
|
Draft
|
Tue Oct 28 08:40:22 2025 |
Entered by Super Team from 134.158.195.141 on Tue Oct 28 08:40:06 2025 | Under Process | Shift summary | |
|
| |
08h40 Warm-up ThomX: Modulator, Laser, Fridge
08h45 Chillers were started, cycling all magnets
09h45 HV is ON
09h49 HV was set to 1215 V
10h15 the receipt recipe_recipe_LI_TL_RI_all_20251023_12_06_10.txt was loaded, linac phases, section attenuator and steerers was adjusted
10h20 The beam is in the ring W/O RF. RF Gun phase 215 dg., Sect. phase 207 dg., Sect. Att. 2.47 dB, TL/BPM02 X=-2mm, Laser Att. 274,Charges (BPMs) -110, -109, -80, -80 ???
10h33 Data taking for different TL/BPM02 X
10h50 RF 100 kV, Phase 11 dg. YL/BPM02 x=-3 to -4 mm, Very good storage, but losses in the TL, Check alignment
11h11 RF gun phase 202 dg. Secr. phase 206 dg. RF phase 3.5 dg. All charges are about -100 pC
11h27 TL/BPM02 X ==> 0 mm to minimize Sync. osc. Hor. Tun 0. 159
11h41 Hor. tun ==> 0.169
11h56 BBA
12h21 RF Gun phase ==> 207 dg.
12h32 Hv was set on standby
13h44 HV is ON
14h14 RF Gun phase ==> 211 dg.
16h52 Stop ThomX |
|
192
|
Tue Nov 30 10:31:04 2021 |
Entered by Super Team from 134.158.195.141 on Tue Nov 30 10:30:47 2021 | Not Fixed | Problem | RF D1 | Linac Commissionning |
|
Soucis modulateur | |
problèmes pour démarrer, il se met encore en défait pendant la periode de chauffe. Le probleme vu hier n'est donc pas réglé. |
|
633
|
Tue Nov 29 09:18:20 2022 |
Entered by Super Team from 134.158.195.141 on Tue Nov 29 09:18:00 2022 | | Linac | Linac Commissionning |
|
Faisceau linac | |
9h15 : Mise en chauffe modulateur, mise en route refroidissements
Clé fosse nord et fosse sud tournée en position ouverte sur le PSS
Mise en trig du modulateur, pas de signaux RF sur l'IHM RF Plots du modulateur.
16h40 Faisceau
phase 215 degres de charge max
Pic approximatif redpitayas : 220 mV pour une HT de 1070V avec une temperature de consigne de 31.25 degres

|
|
1157
|
Tue Nov 25 09:32:03 2025 |
Entered by Super Team from 134.158.195.141 on Tue Nov 25 09:31:46 2025 | Under Process | Shift summary | Diag | Ring Commissioning |
|
| |
09h31 Warm-up ThomX: Modulator, Laser, Fridge
09h36 Chillers were started, cycling all magnets.
09h56 Unable to start MRSV and EL cameras. Need help.
10h33 HV is ON
10h40 HV set to 1215 V
11h24 Beam in the ring W/O RF
11h40 RF 100 kV, phase 3.7 dg. RF Gun phase 210 dg., Sect Att. 2.37 dB, Sect. phase 211 dg., Charges (BPMs) -161, -153, -158, -169 pC, Linac steerers H [0.88 -3.00], V [-2.52 3.08]. Receipt recipe_recipe_LI_TL_RI_good_20251106_16_23_16.txt
12h35 Vacuum interlock V1, restarted
Orbit correction, check with BBA and LOCO after adjusting the device indeces in MML.
16h46 Going to 70 MeV T sect. consigne 28.5ºC, Sect. Att. 0.137 dg., DP 255.8 A, TL/BPM02 X=-1.5 mm,
As it was discussed before, the dipoles for unknown reasons were set to - 2A from nominal current in the saved receipt. We changed the current to the nominal one. Beam tuning ongoing for 70 MeV.
recipe_recipe_LI_TL_RI_good_20251125_18_31_45.txt W/O correctots in the ring, Manual phase shifter 6129, RF phase 14 dg.
to be continued.
18h40 Stop thomx |
|
176
|
Tue Nov 23 12:11:16 2021 |
Entered by Super Team from 134.158.195.141 on Tue Nov 23 12:11:01 2021 | Reference Solution | Info | Laser | Linac Commissionning |
|
energie laser | |
La puissance laser aujourd'hui (23/11/2021) est de :
- Sortie laser : 200 uJ
- Sortie ligne de transport : 60 uJ
- Injecté dans le canon (iris ouverte à 100%) : 47 uJ
La transmission de la ligne de transport est en baisse. Les Hublots sont en cause. Il faut augmenter la taille sur le hublot ou changer le coating de ce dernier.
Hublot d'entrée retiré :
- Puissance laser sortie ligne de transport : 105 uJ
- Puissance iris ouverte 100% : 73 uJ
Kevin |
|
466
|
Tue May 24 09:12:27 2022 |
Entered by Super Team from 134.158.195.141 on Tue May 24 09:09:19 2022 | Under Process | Linac | Linac Commissionning |
|
Démarrage pour faisceau aujourd'hui | |
OdJ : Prise de données pour le ML (SC, HG, VS, HM, VC)
Mise en chauffe modulateur et chillers
Centrage laser pour mesure energie
Valeurs initiales de M4 : Xposition : 896 et Yposition : 5477
Valeurs initiales de M5 : Xposition 0.300 Yposition = 0.465
Position de l'iris à 1.5 mm comme la semaine dernière
Position de l'attenuateur à 400 comme la semaine dernière aussi
Nouvelles valeurs M5 Xposition = 0.190 Yposition = 0.330
Energie laser = 50 uJ (VS)
La camera LI/DG/SST.01 ne s'affiche pas sur l'IHM, redemarrage des serveurs, camera ok
16H10 HM-VC
le modulateur a sauté 3 fois de suite (passage en mode trig)
modulateur en stand by => Jean Noel et Alain vont dans la fosse faire les shadoks
|
|
455
|
Tue May 10 14:03:55 2022 |
Entered by Super Team from 134.158.195.141 on Tue May 10 14:03:41 2022 | Under Process | Linac | Linac Commissionning |
|
Faisceau sur le premier ecran LI/DG/SST.01 | |
Image faisceau à phi = phiqmax - 40 = 100 degres, bobine de focalisation = 210 A sur LI/DG/SST.01

|
|
409
|
Tue Mar 22 11:28:11 2022 |
Entered by Super Team from 134.158.195.141 on Tue Mar 22 11:27:07 2022 | Not Fixed | Linac | Laser | RF D1 |
|
Signal Redpitaya | |
Signal Photodiode :
Pour comprendre les échelles ainsi que le manque de dynamique, Viktor a retiré l'ampli pour voir directement le signal de photodiode sur les Redpitaya.
Redpitaya er/sy/rac.17-elr.01-rdp.04 ChannelB : soucis au niveau de la voie.

|
|
1027
|
Tue Mar 4 18:42:57 2025 |
Entered by Super Team from 134.158.195.141 on Tue Mar 4 18:42:42 2025 | Under Process | Linac | LI | TL |
|
Conditionnement Canon | |
1- Conditionnement du Canon à 16 dB, on gagne un peu en vide.
2- sautes du faisceau : vérification du signal avant la section.
Signal visible sur les positions, voir les 2 images, avec ou sans steerer.
hypothèse :
- si pas de saute sur le BPM-LI : le soucis est après le BPM, ou bien au niveau du BPM
- sauf si le BPM n'est pas assez sensible, ou bien pas assez de recul pour un signal perturbé en amont.
l'amplitude du signal semble aussi varier avec la taille faisceau. Pas de mesure systématique.
18h45 : On ferme |
|
377
|
Tue Mar 1 10:34:30 2022 |
Entered by Super Team from 134.158.195.141 on Tue Mar 1 10:34:10 2022 | Not Fixed | Urgent | CC |
|
panneau IHM ne se lance pas [resolu] | |
resolu
Voici l'erreur,
[18:20:30] operateur.thomx@client1:/tmp_mnt/data/operateur.thomx > IHM
MainThread INFO 2022-03-01 10:30:19,883 TaurusRootLogger: Using "PyQt4" for Qt
MainThread INFO 2022-03-01 10:30:19,950 taurus.qt.qtgui.icon.icon: Setting Tango icon theme (from /usr/local/lib/python2.7/dist-packages/taurus/qt/qtgui/icon/)
('------------ ', '/data/shared/Interfaces/panneaux/')
('HOME_IHM = ', '/data/shared/Interfaces/panneaux/')
('------------ ', '/data/shared/Interfaces/panneaux/')
Traceback (most recent call last):
File "/data/shared/Interfaces/panneaux//PlateformeIHMThomX/PlateformeIHM.py", line 45, in <module>
from IHM_charge import ChargeDevices
File "/data/shared/Interfaces/panneaux//Diags/BPM/IHM_charge.py", line 14
SyntaxError: Non-ASCII character '\xc3' in file /data/shared/Interfaces/panneaux//Diags/BPM/IHM_charge.py on line 14, but no encoding declared; see http://python.org/dev/peps/pep-0263/ for details
|
|
376
|
Tue Mar 1 09:08:55 2022 |
Entered by Super Team from 134.158.195.141 on Tue Mar 1 09:08:40 2022 | | Shift summary | Linac Commissionning |
|
| |
démarrage chillers, modulateur ( en local )
pas de IHM modulateur meme pb que hier soir |
|
479
|
Tue Jun 14 09:56:16 2022 |
Entered by Super Team from 134.158.195.141 on Tue Jun 14 09:56:01 2022 | Under Process | Shift summary | Linac Commissionning |
|
Shift du jour | |
10H demarrage chauffage Klystron et refroidissement.
10H30 fermeture casemate
11H00 trigg du modulateur
Réalignement soleno avec script de la veille
E max phase Q max -45 degrés (96 degrés) LIBPM : x = 0.85mm; y= 0.65 soleno @180A
sans solenoides à phase Qmax : x= 1.1mm; y =0.85mm
|
|
505
|
Tue Jul 12 12:27:38 2022 |
Entered by Super Team from 134.158.195.141 on Tue Jul 12 12:27:24 2022 | | Shift summary | RF Anneau |
|
| |
12h00 Remplacement du PS par Scandinova et mise en route modulateur pour test mise en route frigo et chillers |