ID Date Author Statusdown Type Category Important Subject Icon Text Attachments
  1047   Mon Mar 31 09:46:56 2025 Entered by Super Team from 134.158.195.141 on Mon Mar 31 09:46:30 2025Not FixedProblemVide Problem with vacuum in the septum. TL-V3 and EL-V1 are closed. 09h45 Problem
with vacuum in the septum. TL-V3 and EL-V1
are closed.
  
  1160   Tue Dec 2 09:28:15 2025 Entered by Super Team from 134.158.205.28 on Tue Dec 2 09:27:54 2025Not FixedInfoLI | TL | LE | Ring | Diag | Linac Commissionning | Ring Commissioning Shift ThomX/Xrays : Soucis démarrage icon4.gif Last Recettes for 50 MeV:

recipe_recipe_LI_TL_RI_good_20251127_12_42_51.txt

recipe_recipe_LI_TL_RI_good_20251125_16_42_01.txt
 Screenshot-ICTLI.png 
  1161   Wed Dec 3 11:09:12 2025 Entered by Super Team from 134.158.195.141 on Wed Dec 3 11:08:54 2025Not FixedInfoRF Anneau | Linac Commissionning | Ring Commissioning Demarrage ThomX icon1.gif Soucis Septum : Maher
help 
  
  1250   Fri Jun 19 09:51:28 2026 IC, VMNot FixedUrgentLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Restart of the accelerator 09h35 Start-up modulator

09h52 Start the fridge

09h55 Start chillers
  
  166   Tue Nov 16 16:00:41 2021 Entered by Hayg Guler from 134.158.195.141 on Tue Nov 16 16:00:26 2021New SolutionInfoLaser | Linac Commissionning synchro laser et dephasage icon4.gif Le laser Photocathode peut etre controle
par Tango via LI/OP/OPT.02-LAS.01-XXXX

Le dephasage RF/Laser doit etre
  
  169   Thu Nov 18 11:39:51 2021 Entered by Super Team from 134.158.195.142 on Thu Nov 18 11:39:37 2021New SolutionInfoLaser | Linac Commissionning puissance laser La puissance laser aujourd'hui (18/11/2021)
est de :

  - Sortie laser : 200 uJ
  
  571   Fri Sep 30 08:30:38 2022 AM, VI, VK, IC, VC, NDNew SolutionShift summaryRing Commissioning Shift du 30/09/2022 AM :

Hier soir : extinction des PC clients1
et clients 2
 16x 
  Draft   Mon Oct 3 14:08:06 2022 VC/KD/SCNew SolutionLinacLinac Commissionning Faisceau linac 13h : MO : Mise en chauffe modulateur et
mise en route refroidissement

14h : Fermeture casemate, démarrage
  
  597   Wed Oct 19 17:00:28 2022 KDNew SolutionShift summaryLI | TL | LE | Diag | Linac Commissionning shift du 19 octobre 2022 démarrage faisceau 15h45

Programme :  essaye recette
de la veille
 LI_SST_NOK_2022-10-19_17-04-39.pngLI_SST_OK_2022-10-19_17-02-16.png 
  622   Thu Nov 3 09:18:49 2022 ND, IC, VK, VMNew SolutionShift summaryRing Shift ŕf 3/11/2022 9:10 Air pressure: 8 bars, water resistivity
6,33Mohm

9:15 Modulator warm-up
 9x 
  637   Thu Dec 1 01:14:36 2022 Entered by Nicolas Delerue from 80.119.21.73 on Thu Dec 1 01:14:20 2022New SolutionShift summaryRing | Diag Beam time / Thursday 1st December 

9:10 Il y a quelqu'un de DEKRA
qui deambule seul dans l'IGLEX sans dosimetre.
 11x 
  710   Fri Mar 10 09:34:09 2023 IC, VM, ND, VKNew SolutionShift summaryRing Prise de donnee 10/3/2023 9h20 Start modulator, cycle magnets

10h20 Intevention Vincent sur PA

10h40 Scan charge phase
 7x 
  716   Thu Mar 16 10:15:13 2023 ND, Enzo Crou, Noé Idesheim, Jean-Nicolas QuenotNew SolutionShift summaryRing Commissioning Prise de donnee 16/3/2023 9:15 Mise en chauffe

10:30 Ronde casemate

10:40 Start beam
 17x 
  Draft   Tue Apr 25 09:11:29 2023 ND,DN,SC,NE, EMNew SolutionShift summaryRing Quart collectif 25/4 9h10 (ND): Mise en chauffe modulateur et
laser

9h15 mise en chauffe Chiller (SC)
  
  743   Thu Apr 27 09:24:26 2023 ND, LSNew SolutionShift summaryRing | Diag Prise de donnee 26/4/2023 9:24 Mise en chauffe

9:30 Cyclage des aimants

11h44 Démarrage faisceau
 2023-04-27_14_41_46_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png2023-04-27_14_43_34_el_dg_sst_01-ccd_01_RAW.png 
  744   Fri Apr 28 09:20:00 2023 ND, LS, IC, VM, VKNew SolutionShift summaryRing Prise de donnee 27/4/2023 9:19: Mise en chauffe

10:24 Cycling magnets

10:50 Demarrage faisceau
 10x 
  745   Wed May 3 09:04:24 2023 KDNew SolutionShift summaryLI | TL | LE | Linac Commissionning shift du 03 mai 2023 9h : Mise en chauffe machine (frigo,
chiller, modulateur, PA, Laser)

13h30 : Démarrage Machine
 8x 
  764   Tue Jun 13 13:51:05 2023 SC, NDNew SolutionInfoLI Effet changement de phase RF Canon sur TL/BPM.02 Quelques changements de phase canon. On
voit que quand l'orbite derive vers des
valeurs negatives sur Tl/BPM.02/SpX le fait
 Screenshot_from_2023-06-13_13-50-23.png 
  765   Tue Jun 13 13:55:41 2023 SC, NDNew SolutionInfoLI RE: Effet changement de phase RF Canon sur TL/BPM.02 Le code lock_position_tl_bpm_02.py a ete
mis a jour pour prendre cet effet en compte.

 
  
  768   Tue Jun 13 15:27:35 2023 ND, RCNew SolutionInfoLaser Effet eclairage sur detecteurs RX Effet de l'eclairage dans la casemate
sur les detecteurs a RX (lumiere eteinte
a 15:26:40) => il faut fonctionner avec
 Screenshot_from_2023-06-13_15-27-06.png 