HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 35 of 63  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Entered by Super Team from 134.158.195.141 on Mon Mar 31 09:46:30 2025; Problem with vacuum in the septum. TL-V3 and EL-V1 are closed. 
icon4.gif   Entered by Super Team from 134.158.205.28 on Tue Dec 2 09:27:54 2025; Shift ThomX/Xrays : Soucis démarrage  Screenshot-ICTLI.png
icon1.gif   Entered by Super Team from 134.158.195.141 on Wed Dec 3 11:08:54 2025; Demarrage ThomX  
Entry   IC, VM; Restart of the accelerator 
icon4.gif   Entered by Hayg Guler from 134.158.195.141 on Tue Nov 16 16:00:26 2021; synchro laser et dephasage 
Entry   Entered by Super Team from 134.158.195.142 on Thu Nov 18 11:39:37 2021; puissance laser 
Entry   AM, VI, VK, IC, VC, ND; Shift du 30/09/2022 16x
Entry   VC/KD/SC; Faisceau linac 
Entry   KD; shift du 19 octobre 2022 LI_SST_NOK_2022-10-19_17-04-39.pngLI_SST_OK_2022-10-19_17-02-16.png
Entry   ND, IC, VK, VM; Shift ŕf 3/11/2022 9x
Entry   Entered by Nicolas Delerue from 80.119.21.73 on Thu Dec 1 01:14:20 2022; Beam time / Thursday 1st December 11x
Entry   IC, VM, ND, VK; Prise de donnee 10/3/2023 7x
Entry   ND, Enzo Crou, Noé Idesheim, Jean-Nicolas Quenot; Prise de donnee 16/3/2023 17x
Entry   ND,DN,SC,NE, EM; Quart collectif 25/4 
Entry   ND, LS; Prise de donnee 26/4/2023 2023-04-27_14_41_46_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png2023-04-27_14_43_34_el_dg_sst_01-ccd_01_RAW.png
Entry   ND, LS, IC, VM, VK; Prise de donnee 27/4/2023 10x
Entry   KD; shift du 03 mai 2023 8x
Entry   SC, ND; Effet changement de phase RF Canon sur TL/BPM.02 Screenshot_from_2023-06-13_13-50-23.png
    Reply   SC, ND; RE: Effet changement de phase RF Canon sur TL/BPM.02 
Entry   ND, RC; Effet eclairage sur detecteurs RX Screenshot_from_2023-06-13_15-27-06.png
ELOG V3.1.4-395e101