  1149   Wed Nov 12 10:29:49 2025 Entered by Super Team from 134.158.76.9 on Wed Nov 12 10:29:34 2025Under ProcessShift summaryLI | TL | Ring   15h09 Cycling all magnets

15h12 HV is ON

15h15 The modulator was set to
  
  1147   Fri Nov 7 18:45:54 2025 Entered by Super Team from 134.158.205.4 on Fri Nov 7 18:45:38 2025Under ProcessShift summaryLinac Commissionning   08h34  Warm-up ThomX: Modulator, Laser,
Fridge

08h40 Chillers were started,
 Screenshot_from_2025-11-07_16-24-10.pngScreenshot_from_2025-11-07_16-24-35.pngScreenshot_from_2025-11-07_16-23-58.png 
  1160   Tue Dec 2 09:28:15 2025 Entered by Super Team from 134.158.205.28 on Tue Dec 2 09:27:54 2025Not FixedInfoLI | TL | LE | Ring | Diag | Linac Commissionning | Ring Commissioning Shift ThomX/Xrays : Soucis démarrage icon4.gif Last Recettes for 50 MeV:

recipe_recipe_LI_TL_RI_good_20251127_12_42_51.txt

recipe_recipe_LI_TL_RI_good_20251125_16_42_01.txt
 Screenshot-ICTLI.png 
  78   Thu Sep 30 15:59:32 2021 Entered by Super Team from 134.158.195.144 on Thu Sep 30 15:59:16 2021FixedShift summaryLinac Commissionning Interlock vide et modulateur Interlock vide sur pompe très fréquent,
modification en local pour améliorer
la situation
  
  77   Wed Sep 29 17:03:32 2021 Entered by Super Team from 134.158.195.143 on Wed Sep 29 16:57:52 2021Under ProcessLinacLinac Commissionning Dark current Pemiere image du courant d'obscurité. 

L'image
est prise sur la station SST01 du Linac.
 First_DarkCurrent.tif 
  1034   Wed Mar 12 16:50:29 2025 Entered by Super Team from 134.158.195.143 on Wed Mar 12 16:50:08 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Spectres X (positions fentes 2 et temps d'extraction) IP-Fente2 : 8835 mm
IP-capteur_CdTe: 10460

Calib ouverture Fentes2 : +0.1
  
  66   Wed Sep 15 11:41:45 2021 Entered by Super Team from 134.158.195.142 on Wed Sep 15 11:41:31 2021FixedLinacLinac Commissionning démarrage RF canon _ mercredi 15 septembre Le comportement des claquages à
l'arrière du canon est confirmé
ce jour
  
  123   Wed Oct 27 14:07:46 2021 Entered by Super Team from 134.158.195.142 on Wed Oct 27 14:07:29 2021Not FixedProblemCC pas de pilotage possible via les IHM Les IHM ne passent plus les commandes
(modulateur, RF, ...)

Impossible de démarrer le
  
  93   Wed Oct 6 17:53:03 2021 Entered by Super Team from 134.158.195.142 on Wed Oct 6 17:52:44 2021FixedInfoLinac Commissionning convertion pixel/mm pour la caméra Li/DG/SST.01-CCD.01 Convertion pixel/mm pour Li/DG/SST.01-CCD.01:

Horizontale : 1pixel = 37µm
Verticale : 1pixel = 56µm
  
  92   Wed Oct 6 11:38:44 2021 Entered by Super Team from 134.158.195.142 on Wed Oct 6 11:38:31 2021Under ProcessLinacLinac Commissionning shift du 6 octobre 2021 Redémarrage,

problème du redémarrage
des DS des alims via l'IHM, ou atk (obligé
 Screenshot_IHM_Alim.png 
  168   Wed Nov 17 14:00:28 2021 Entered by Super Team from 134.158.195.142 on Wed Nov 17 14:00:15 2021FixedFixDiag | Linac Commissionning Recherche du signal ICT après la section Alexandre Moutardier :

Signal ICT (ER/CA/RAC.05-ELR.01-WAC.02
channel CH3) pas visible après
 2021-11-17_14_19_8_scan_charge_phase_TL1.jpg2021-11-17_14_20_22_scan_charge_phase_Li.jpg 
  167   Wed Nov 17 11:28:50 2021 Entered by Super Team from 134.158.195.142 on Wed Nov 17 11:28:36 2021Under ProcessInfoLinac Commissionning run du 17 novembre pour rappel le programme de la journée
:

•Vérification de la
 charge_pahse.jpgcharge_phase.csv2021-11-17_12_04_19_li_dg_sst_01-ccd_01_RAW.pnglaser_13h.png 
  345   Wed Feb 16 18:14:03 2022 Entered by Super Team from 134.158.195.142 on Wed Feb 16 18:13:48 2022Under ProcessLinacLinac Commissionning Mesures journée vacances (VC/HG)  

Mesures portant sur la compréhension
de sensibilité de la taille du faisceau
 6x 
  346   Wed Feb 16 18:50:15 2022 Entered by Super Team from 134.158.195.142 on Wed Feb 16 18:13:48 2022Under ProcessLinacLinac Commissionning RE: Mesures journée vacances (VC/HG) Plot charge phase : 

 charge_phase__at_16-02-2022__17-46-08.jpg 
  645   Wed Dec 7 16:58:54 2022 Entered by Super Team from 134.158.195.142 on Wed Dec 7 16:58:42 2022 Shift summaryLinac Commissionning Linac measurements @ différent modulator voltage settings   

Modulateur : 1070 V

On se met à la phase de
  
  1057   Wed Apr 16 13:48:05 2025 Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025Under ProcessShift summaryLI Beam study  Mesures du jour : prendre des images pour
refaire le calcul d'émittance
en tenant compte des corrélations
 Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_Charge.pngCoil_Scan_BeamSize_Align_Ring_Ref_50MeV_YagTL1.pngSize_vs_SolenoScan_14-07-49.pngQ_vs_SolenoScan_14-07-50.pngFigure_2025-04-16_163405.png 
  65   Tue Sep 14 11:02:13 2021 Entered by Super Team from 134.158.195.142 on Tue Sep 14 11:01:58 2021Under ProcessLinacLinac Commissionning démarrage RF canon _ mardi 14 septembre icon12.gif Démarrage modulateur

Passage de 10 Hz à 1 Hz
--> problème interface réglée
 vide14092021_matin.xcfJauges_vol1et2_15.8dB.pngPompes_ioniques_vol1et2_15.8dB.png 
  595   Tue Oct 18 17:39:58 2022 Entered by Super Team from 134.158.195.142 on Tue Oct 18 17:39:43 2022Not FixedProblemLaser Voyant rouge en salle Laser icon1.gif Voyant apparu vers 17h 

SPR est passé voir : peut-etre
en lien avec la clim
  
  90   Tue Oct 5 10:24:12 2021 Entered by Super Team from 134.158.195.142 on Tue Oct 5 10:23:47 2021Under ProcessLinacLinac Commissionning Paramètres RFs  Signal à 150 mV -> Gradient de
80 MV/m

 
 Screenshot_from_2021-10-05_10-27-42.png 
  174   Tue Nov 23 10:44:04 2021 Entered by Super Team from 134.158.195.142 on Tue Nov 23 10:43:41 2021Under ProcessShift summaryLinac Commissionning run 23 nov 2021 Intervention modulateur par Maher

Remise en eau dans la boucle générale
par Jean-Noel
  