HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 34 of 63  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Entered by Super Team from 134.158.76.9 on Wed Nov 12 10:29:34 2025;  
Entry   Entered by Super Team from 134.158.205.4 on Fri Nov 7 18:45:38 2025;  Screenshot_from_2025-11-07_16-24-10.pngScreenshot_from_2025-11-07_16-24-35.pngScreenshot_from_2025-11-07_16-23-58.png
icon4.gif   Entered by Super Team from 134.158.205.28 on Tue Dec 2 09:27:54 2025; Shift ThomX/Xrays : Soucis démarrage  Screenshot-ICTLI.png
Entry   Entered by Super Team from 134.158.195.144 on Thu Sep 30 15:59:16 2021; Interlock vide et modulateur 
Entry   Entered by Super Team from 134.158.195.143 on Wed Sep 29 16:57:52 2021; Dark current First_DarkCurrent.tif
Entry   Entered by Super Team from 134.158.195.143 on Wed Mar 12 16:50:08 2025; Spectres X (positions fentes 2 et temps d'extraction) 
Entry   Entered by Super Team from 134.158.195.142 on Wed Sep 15 11:41:31 2021; démarrage RF canon _ mercredi 15 septembre 
Entry   Entered by Super Team from 134.158.195.142 on Wed Oct 27 14:07:29 2021; pas de pilotage possible via les IHM 
Entry   Entered by Super Team from 134.158.195.142 on Wed Oct 6 17:52:44 2021; convertion pixel/mm pour la caméra Li/DG/SST.01-CCD.01 
Entry   Entered by Super Team from 134.158.195.142 on Wed Oct 6 11:38:31 2021; shift du 6 octobre 2021 Screenshot_IHM_Alim.png
Entry   Entered by Super Team from 134.158.195.142 on Wed Nov 17 14:00:15 2021; Recherche du signal ICT après la section 2021-11-17_14_19_8_scan_charge_phase_TL1.jpg2021-11-17_14_20_22_scan_charge_phase_Li.jpg
Entry   Entered by Super Team from 134.158.195.142 on Wed Nov 17 11:28:36 2021; run du 17 novembre charge_pahse.jpgcharge_phase.csv2021-11-17_12_04_19_li_dg_sst_01-ccd_01_RAW.pnglaser_13h.png
Entry   Entered by Super Team from 134.158.195.142 on Wed Feb 16 18:13:48 2022; Mesures journée vacances (VC/HG) 6x
    Reply   Entered by Super Team from 134.158.195.142 on Wed Feb 16 18:13:48 2022; RE: Mesures journée vacances (VC/HG) charge_phase__at_16-02-2022__17-46-08.jpg
Entry   Entered by Super Team from 134.158.195.142 on Wed Dec 7 16:58:42 2022; Linac measurements @ différent modulator voltage settings  
Entry   Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025; Beam study  Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_Charge.pngCoil_Scan_BeamSize_Align_Ring_Ref_50MeV_YagTL1.pngSize_vs_SolenoScan_14-07-49.pngQ_vs_SolenoScan_14-07-50.pngFigure_2025-04-16_163405.png
icon12.gif   Entered by Super Team from 134.158.195.142 on Tue Sep 14 11:01:58 2021; démarrage RF canon _ mardi 14 septembre vide14092021_matin.xcfJauges_vol1et2_15.8dB.pngPompes_ioniques_vol1et2_15.8dB.png
icon1.gif   Entered by Super Team from 134.158.195.142 on Tue Oct 18 17:39:43 2022; Voyant rouge en salle Laser 
Entry   Entered by Super Team from 134.158.195.142 on Tue Oct 5 10:23:47 2021; Paramètres RFs  Screenshot_from_2021-10-05_10-27-42.png
Entry   Entered by Super Team from 134.158.195.142 on Tue Nov 23 10:43:41 2021; run 23 nov 2021 
ELOG V3.1.4-395e101