Entry   Entered by Super Team from 127.0.0.1 on Wed May 13 08:35:01 2026; manip Gplast 
demarrage machine 8h30

faisceau ok vers 10H

14h mesure 50 MeV
Entry   IC, VM; Restart of the accelerator GunCharge_vs_LaserAtt.pngGunDarkCurrent_vs_Att.png
08h45 Start-up modulator, laser, magnets

09h38 Shutter Laser Linac is yellow. Tuning off the gun operation key does not change it to the red. Need help.

09h55 HV is on
Entry   IC, VM; Restart of the accelerator Screenshot_from_2026-06-17_15-54-18.pngScreenshot_from_2026-06-17_15-50-21.png
08h35 Start-up modulator (it was already on standby), laser, magnets, cycling.

As yesterday there is a problem with the MPS to start the machine. We are trying to investigate whether it is related to the vacuum or something
else.
icon1.gif   Hayg; DS pour les températures des chillers 
Listes des Ds pour les températures des chillers


GUN : ER/HF/RAC.17-API.AI1/AI2
Section : ER/HF/RAC.17-API.AI1/AI1


Emplacements :


Sortie Chiller : 
Entry   Entered by Kevin Dupraz from 134.158.195.153 on Thu Jul 15 12:39:32 2021; Alignement PhotoCathode Image__2021-07-15__12-34-45_PCVirtuelle.bmp
L'alignement de la PhotoCatode est fini. Il est a noter :

- La position de la camera a ete ajuste pour mieux coller a la distance entre PhotoCathode et miroir de prelevement (pour la cathode virtuelle).
Cette distance est d'environ 215.5 cm.
    Reply   Entered by Kevin Dupraz from 134.158.195.153 on Thu Jul 15 12:39:32 2021; RE: Alignement PhotoCathode Image__2021-07-15__12-34-45_PCVirtuelle.bmp
Le tube de liaison a ete remis, le faisceau etait legerement decale. Il a ete realigner sur la PhotoCathode (1mm a gauche de la sortie de la PhotoCathode
trouee).

La nouvelle image et en P.J.
icon3.gif   Entered by Hayg Guler from 134.158.195.141 on Tue Oct 5 10:05:07 2021; Comment éteindre le laser 
Pour couper le Laser :


il faut arrêter seulement l'Ampli, et laisser l'oscillateur (pas besoin de l'arrêter).
Redémarrer
l'oscillateur peut le mettre dans un mode instable.


 
Entry   Entered by Super Team from 134.158.195.141 on Tue Nov 23 12:11:01 2021; energie laser 
La puissance laser aujourd'hui (23/11/2021) est de :

  - Sortie laser : 200 uJ
  - Sortie ligne de transport : 60 uJ
Entry   Entered by Super Team from 134.158.195.141 on Wed Jan 5 17:34:46 2022; Iris Motorisé 
[KD et HG]

-  Mise en place de l'iris motorisé à peu près à l'endroit ou se trouvait l'autre iris (+/- 1 cm).

- Le Ds doit être installé par le CC
Entry   Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 17:11:44 2022; Paramètres Faisceau 
Alignement laser

On retrouve la phase pour la charge max phi = 313 degres (consigne chiller canon = 31.25 degres)

On enlève 40 degres à la phase de charge max pour arriver à la phase d'énergie maximum phi = 273 degres
Entry   VK, AL, IC; Beam is stored 6x
Shift started at 18h

With the current injector settings, it was difficult to inject.  We loaded the settings from last Friday 30/09 (19-22-04).

 
Entry   Entered by Super Team from 134.158.195.142 on Thu Apr 20 10:36:01 2023; référence axe mag Canon 
Voici la référence tete de machine pour l'axe mag canon :

Laser Iris position  [H;V] : [4.90/2.42mm]

Solénoides position : Z : 3.3mm, -4.9mrad
Entry   LS, MB, VC, ND; Programme prise de donnees 8/06 health_check_2023_06_08_09_30.pnghealth_check_RF_2023_06_08_09_30.pnghealth_check_Vide_2023_06_08_09_30.pnghealth_check_Alimentation_2023_06_08_09_31.png
9:23 Mise en chauffe

Nombreux pb vide dans health check

Acces casemate pour verification polarite RI-C2/DG/BPM.02 pas de probleme trouve.
Entry   KD; run du 27 septembre 2023 
12h38 : Mise en chauffe de la machine (modulateur, chiller, laser)

==> mise en place de la version du 27/09 dans le CPLD pour la synchro. Trig régulier mais jitter entre les deux 500MHz de 35 ps (RMS)
et 160 ps (P-P).
Entry   Entered by Super Team from 134.158.195.141 on Thu Oct 5 08:38:51 2023; run du 5 octobre 2023 
8h30 : mise en chauffe de la machine

 

*** Comment aires ***
Entry   KD; run du 6 octobre 2023 
17h: Pris en main de la machine (anneau à 500.34MHz). Qualité du stockage très aléatoire (bruit de synchro). 

* Cavité locké avec une CEP très dégradée à 9kW en moyenne.

- Position table optique initial (X de juillet) : TZ = -1.652mm
Entry   KD; shift du 10 octobre 2023 
9h: mise en chauffe de la machine

- La clé PA est resté enclenchée, les lumières allumées. Qui a pris la machine hier ?

11h15 Démarrage de l'archivage. 
Entry   KD; shift du 11 octobre 2023 
9h: mise en chauffe de la machine

* injection dans l'anneau avec la recette 500.25MHz

* lock de la cavité et rayons-X retrouvé (en désynchronisé)
Entry   KD, MJ, HG, DN, IC, & al.; shift du 18 octobre 2023 Screenshot_2023-10-18_17-15-49.pngscrprint.png
10h : mise en chauffe de la machine (chillers, modulateur, laser, alims).

*** Programme ***

- Stockage des e- et puissance laser
Entry   KD; shift du 09 novembre 2023 
8h30 : démarrage machine (laser, klystron, chiller, frigo, aimant)

* Beaucoup de problème de rédémarrage. Les delays au niveau des wavecatcher ne sont toujours pas bons (pas
de signal de charge visible).