Wed Jun 17 08:36:20 2026 |
IC, VM | Under Process | Problem | Vide |
|
Restart of the accelerator | |
08h35 Start-up modulator (it was already on standby), laser, magnets, cycling.
As yesterday there is a problem with the MPS to start the machine. We are trying to investigate whether it is related to the vacuum or something else.
Problem with the solenoid COL.01 (Internal Interlock Hard).
Help is needed.
At this moment, apparently we are blocked by the closed vacuum valve of the FPC. To be checked with Nourredine (emails sent).
The vaccum level in the FPC is not yet good to open the valve. Eric will check it.
10h10 Switched to the Linac+TL+EL configuration. HV is on (the modulator was in the local mode). Interlocks even at HV 1200 V, the sect att. 3 dB. Linac 04 vac is high.
10h33 There are breakdowns at 26 dB the section att. and 25 dB of the RF gun att. These are not in vacuum breakdowns. Probably it is the klystron problem.
10h50 The modulator is in the standby mode.
Maher is coming to check the klystron and Jean-Noel is working on the solenoid power supplies.
11h40 Maher fixed problem with the klystron by increasing the filament power. At 84 kV, I = 48.7 A (microperveance 2.0). At 293 kV, I = 294 A (microperveance 1.85, should be 2.0).
12h03 The machine configuration without FP closes the photocathode laser shuter, so we can operate only in the Linac+TL+EL configuration.
12h36 Energy = 50 MeV, Laser Phase 25 dg., Sect. Phase 253 dg., Sect. Att. 2.26 dB, I_Gun -95.0704 pC, I_Linac -92.7397 pC, I_TL -3.7568 pC RF_Ampl. 0 kV, RF_Phase 35.5 dg.
Laser Att. 360, Linac steerers H: [0.31 -2.62], V: [-1.87 2.88]
12h43 Energy = 50 MeV, Laser Phase 26 dg., Sect. Phase 250 dg., Sect. Att. 2.35 dB, I_Gun -101.3924 pC, I_Linac -99.5194 pC, I_TL -101.3812 pC RF_Ampl. 0 kV, RF_Phase 35.5 dg.
13h17 Laser Att. 410 (max) Energy = 50 MeV, Laser Phase 26 dg., Sect. Phase 250 dg., Sect. Att. 2.35 dB, I_Gun -138.8712 pC, I_Linac -135.3968 pC, I_TL -137.4172 pC RF_Ampl. 0 kV, RF_Phase 35.5 dg.
At the moment maximum charge is 135 pC with irise Ø of 1.3 mm (possibly because the laser photocathode shutter is in the wrong position)
13h25 The modulator is in standby mode. Maher can remove the MPS short.
The problem with MPS is the OC/AVAL02 FP valve. It is in two states at the same time: Closed and Open.
It was the OC/AVAL01 FP valve
recipe_recipe_LI_TL_RI_all_20260422_18_34_34.txt loaded
14h54 Beam is in the ring w/o RF. Thank you all !!!!.
15h15 Laser Att. 360, Energy = 50 MeV, Laser Phase 26 dg., Sect. Phase 250 dg., Sect. Att. 2.42 dB, I_Gun -179.1795 pC, I_Linac -205.8011 pC, I_TL -186.6367 pC RF_Ampl. 99.1184 kV, RF_Phase -50 dg.
Laser Att. set to 320 for 100 pC
15h25 Energy = 50 MeV, Laser Phase 26 dg., Sect. Phase 250 dg., Sect. Att. 2.33 dB, I_Gun -96.7941 pC, I_Linac -124.7882 pC, I_TL -102.9734 pC RF_Ampl. 99.1184 kV, RF_Phase -50 dg.
15h28 recipe_recipe_LI_TL_RI_all_20260121_10_35_05.txt loaded. There is storage, but it is necessary to optimize it
15h33 ring_saving
15h35 recipe_recipe_LI_TL_RI_all_20260422_18_34_34.txt loaded
15h36 ring_saving
17h41 ThomX was stopped |
| Attachment 1: Screenshot_from_2026-06-17_15-54-18.png
|
 |
| Attachment 2: Screenshot_from_2026-06-17_15-50-21.png
|
 |
|
854
|
Tue Mar 5 15:10:32 2024 |
IC, VM, VK | Under Process | Shift summary | Ring Commissioning |
|
Restart and tuning of the injector | |
10h Intervention to repair the water leakage. It was repaired.
New problem with vacuum pomp is found in the ring. The two problems are due to the water leakage. Intervention is ongoing.
12h Warm up of the machine
14h30 Start up of the machine in the mode LI-TL-EL. Goal: tune the injector and perform the measurements.
Mistriggering. All interfaces to see the current freauency do not respond.
Intervention of synchronization team is needed to continue.
15h30 Stop the beam for vacuum intervention . |
| Attachment 1: Screenshot_from_2024-03-05_15-13-48.png
|
 |
|
Draft
|
Mon Mar 9 12:55:30 2026 |
Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026 | | | |
|
Restart after strange last shift | |
12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen put last motor positions (2266 && 4158) --> No spot on screen :(
13h05 : Gun activities incresed (Vac > 1e-7 && reflected power)
13h12 : Laser put OFF |
|
798
|
Fri Sep 29 10:19:52 2023 |
ND, Marie Labat | Under Process | Shift summary | Diag |
|
Reglage Cerenkov 29/9 | |
9:07 Mise en chauffe
Verifucation Alignement laser
Maher: changement de dosimetres
11:58 Demarrage faisceau
Recette LI+TLstraight 20230825_17_20_30
Signal observe a l'oeuil. Recherche a la camera. Difficile a voir dans le couloir.
16:52 Signal observe a l'oeuil puis a la camera. Signal YAG puis signal Cerenkov.
Image Cerenkov1: expo=145000 (2,9s) TL/PS/STR.01-H01=0A
TL/PS/STR.01-V01=+0A
Image Cerenkov2: Modulateur HV
Image Cerenkov3: TL/PS/STR.01-H01=+3A
Image Cerenkov4: Baisse du temps d'exposition a 90000 (1,8s)
Image Cerenkov5: TL/PS/STR.01-V01=+4.5A
Image Cerenkov6: Charge baissée de 100pC a 20pC
Image Cerenkov7: Charge remise a 100pC
17:30 Acces controlé: un iris etait partiellement fermé.
17:40 Fin. Passage de la machine a Kevin.
* Essaie de différents code pour la synchro (CPLD) fait par F. Wicek :
- avec ligne à retard interne (bascule) : trop de jitter au niveau du 50Hz (4ms sdev) mais peu visible sur les BPM
- solution sans synchro FP : (pas de jitter 50Hz : 120us sdev, mais pas de synchro FP)
- Essaie de faire un veto avec un comptage d'horloge 41MHz ==> pas réussi (le code ne réagis pas comme il faut = investiguer le VHDL)
* Essaie de la ligne à retard 33MHz (AO.01-AO.07) = pas d'influence sur le signal à première vue.
21h extinction de la machine
|
| Attachment 1: health_check_2023_09_29_11_58.png
|
 |
| Attachment 2: scan_Laser_vs_RF_phase_2023_09_29_12_02.png
|
 |
|
763
|
Mon Jun 12 14:52:39 2023 |
VK, IC. VM | | Shift summary | Ring Commissioning |
|
Reestablishing running conditions at 500.38 MHz | |
Goal of the shift: Reestablish the good storage at 500.38 and then try to optimize the storage and orbit.
Start up of the machine.
RF cavity start up by Mohamed. Water leakage. Jean-Noel will fix tomorrow mornig. Mohamed also says that aparently the sinal from ring syntetizer is a bit noisy, to be checked with Nicolas.
problem with trigger of the TL BPM. Nicola fixed the problem. The cable was broken.
Load of the machine setting from 19/05. The injection in the ring is very unstable from shot to shot due to the tuning of the cavity. Coming to 100 kV @500.38 MHz synchronized with the ring. RF cavity works stable.
Beam on TL BPM.02 drifts a lot and very fast. See screenshots.
With the previous setting, we did not get the previous orbit. After small reoptimization we received the resonable storage. Still we should work on the orbit correction.
The main idea fo this week is to prepare the beam for the search of the first X-rays.
|
| Attachment 1: scan_charge_phase_min_0.0_max_360.0_14_32_59.png
|
 |
| Attachment 2: Screenshot_from_2023-06-12_15-23-07.png
|
 |
| Attachment 3: Screenshot_from_2023-06-12_15-40-14.png
|
 |
| Attachment 4: Screenshot_from_2023-06-12_17-38-24.png
|
 |
| Attachment 5: Screenshot_from_2023-06-12_17-32-48.png
|
 |
|
76
|
Mon Sep 27 14:49:10 2021 |
Entered by Nicolas Delerue from 134.158.88.175 on Mon Sep 27 14:46:15 2021 | Under Process | Problem | Linac Commissionning |
|
Redémarrage suite coupure Électrique, entered from 134.158.88.175 | |
Bonjour,
Selon Astor, il y a encore des problèmes sur les clients 1, 5, 6 et 7...
Est-ce que quelqu'un pourrait regarder? Cela bloque le redémarrage des mesures de charge.
Merci d'avance,
Nicolas |
| Attachment 1: Capture_2021-09-27_14.43.51.png
|
 |
|
827
|
Thu Jan 11 14:47:37 2024 |
ND | Fixed | Info | Diag |
|
Redémarrage diags + synchro | |
Pour la synchro, les generateurs de retard ont ete redemarres.
Pour les diags: redemarrage de icePapControllerB6 et Wavecatchers.
Signal OK (sans faisceau) sur BPM, ICT et sur ecrans.
|
| Attachment 1: health_check_Diag_2024_01_11_14_54.png
|
 |
| Attachment 2: health_check_2024_01_11_14_55.png
|
 |
|
658
|
Mon Jan 2 15:21:11 2023 |
ND/PG/JNC/MO/SC/VC/NE | Under Process | Linac | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique |
|
Redémarrage ThomX | |
Bonne Année à tous !
Redémarrage de ThomX
- Mise en route du CC (PG, JNC)
- Mise en route du modulateur et des chillers (MO)
- Mise en route des Diagnostics (ND)
15h00 : Ampli laser redémarré
15h10 : Tests de démarrage de modulateur apres chauffe (MO)
Pression SF6 ok
15h53 : Modulateur à 1090 V
Laser en route, faisceau visible sur camera LI/DG/SST.01 et charge 130 pC, phi = 240 degres déterminé avec scan charge phse IHM avec laser non centré
Shutter fonctionnel, ouverture iris à 2 mm pour test du feedback laser
Alimentations fonctionnelles
A faire pour la suite : Visualisation du phototube de la photocathode sur la redpitaya à mettre en place, IHM charge EL/DG/FC.01 charge positive lors du passage de la LE en décembre à vérifier
16h38 : Arret faisceau
16h55 : Arret du trig modulateur, manque une autorisation, en cours d'investigation
|
|
Draft
|
Mon Sep 27 14:46:31 2021 |
Entered by Nicolas Delerue from 134.158.88.175 on Mon Sep 27 14:46:15 2021 | Under Process | Problem | Linac Commissionning |
|
Redémarrage suite coupure Électrique | |
Bonjour,
Selon Astor, il y a encore des problèmes sur les clients 1, 5, 6 et 7...
Est-ce que quelqu'un pourrait regarder? Cela bloque le redémarrage des mesures de charge.
Merci d'avance,
Nicolas |
|
719
|
Fri Mar 24 08:52:49 2023 |
SC/JNC/VC | Under Process | Problem | CC |
|
Redémarrage ThomX | |
8h53 Serveur DNS et DHCP non redémarré, ping ne fonctionne pas, en attente d'une solution
Re-démarrage automate et cpci (JNC)
14h13 ping sur automate ok
15H
er/sy/rac.17-elr.01-rdp.03 dans IHM healthckeck remarrage impossible .. dans astor
Remise en route synchro et camera (ND)
Re-démarrage de tout dans astor
Reste à regarder : er/sy/rac.14-elr.01-rdp.03 en server off qui refuse de se mettre on
Allumer le laser photocathode.
pompage vide pompe ionique prévu pour lundi, pas de faisceau lundi. |
| Attachment 1: ping_automate.png
|
 |
| Attachment 2: camera_lidgsst.01.png
|
 |
| Attachment 3: rf_gun_ihm.png
|
 |
| Attachment 4: srv4_astor.png
|
 |
| Attachment 5: redpitaya_ihm.png
|
 |
|
446
|
Mon May 2 14:02:58 2022 |
Entered by VC/SC from 134.158.195.141 on Mon May 2 14:02:42 2022 | Not Fixed | Linac | Linac Commissionning |
|
Redpitaya et modulateur |
|
Remise en chauffe du modulateur
Reboot des redpitayas pour avoir le signal HF sur l'IHM
En attente de la fin de chauffe du modulateur
16h50
apres 3 redemarrages du modulateur....
5 plantages des redpitaya avec redemarrage Hard obligatoire
et une jauge de pression qui interdit le passage du modulateur en mode trig!
Nous arretons la machine
la mesure du courant d'obscurité (soit disant aisée à réaliser... ) est reportée à une date ultérieure...
en conclusion ThomX n'a pas besoin d'avoir un laser fonctionnel pour dysfonctionner...
|
|
927
|
Fri Sep 27 17:03:34 2024 |
MJ HG | | Shift summary | Linac Commissionning |
|
Redemarrage machine apres probleme de synchro et/ou alim | |
Apres un OFF/ON des baies alim et des transfo + baie synchro OFF/ON la synchro semble etre de nouveau alive
16h15 Chauffe Klystron
ICT bpm et yag semblent ne pas se declencher au bon moment
Impossible de faire quoi que ce soit. On ne trouve pas le bon fichier delays diags etc ... Meme apres appel tel avec Vincent.
Bon we
|
| Attachment 1: ICT.png
|
 |
| Attachment 2: bpmLI.png
|
 |
|
149
|
Fri Nov 5 09:35:19 2021 |
Entered by Super Team from 134.158.195.141 on Fri Nov 5 09:35:02 2021 | Fixed | Info | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning |
|
Redemarrage 05/11 9h35 |
|
Après coupure électrique de cette nuit. Rédemarrage de tous les systèmes :
Général:
- toutes les baies sont allumées
- Tous les clients de la salle de contrôle redémarrés
- les rondes sont tombées
Synchro:
- Synchro redémarrée avec le compte opérateur
- dernière recette "20211028_1105_deplacement_trigger_linac_a_40_micro_s.xml" rechargée (est ce la bonne ?)
- l'oscilloscope trig. Il y a des loupés sur la voie 1 (voie jaune)
Vide:
- Compresseur réallumé
- pompes acquittées.
- Toutes les vannes sont fermées
- le vide Cavité FP en rouge sur le MPS.
CC:
- Beaucoup de serveur sont rouge (Client2, libéra et redpitaya) (Gogh aussi n'avait pas starter de redémarré, un reboot à résolu le problème)
- l'Archivage est HS, le server est blanc sous astor (mais starter est démarré), impossible de restart les DS d'Archivage. |
|
853
|
Mon Mar 4 08:58:01 2024 |
Entered by Super Team from 134.158.195.141 on Mon Mar 4 08:57:45 2024 | Under Process | Shift summary | Ring | Ring Commissioning |
|
Recomissioning of the SR, search for the revolution frequency | |
08h50 Start up of the machine
- Problem with the vaccum, the valves around the RF cavity are down. Eric came. He checked and the problem is with the cable. it should be changed. Intervention is ongoing.
- The water leakage is detected on teh Ring RF cavity. Intervention of Mohamed and Jean-Noel is needed. Jean-Noel is informed about the problem.
- Synchro problem. Jitter at FPCavity scope screen. Vincent is working on that. |
|
850
|
Fri Mar 1 10:30:38 2024 |
VK, VM, IC | Under Process | Shift summary | Ring | Ring Commissioning |
|
Recomissioning of the SR, search for the revolution frequency | |
8h50 Start of the machine
Laser amplifier was somehow OFF. Very strange situation and not clear why it happen. To be understood.
Call Viktor, who came and start the laser.
Start the beam. No beam. No e- from gun. Call Vincent.
Many instabilities in e-beam signals.
Retuning Linac, attenuator =2.114 for 50 MeV (why ??? calibration problem ?)
Work on orbit correction, starting from natural one. Slight optics tuning. Frequency 500.067 MHz. The hor. tune is 0.18
Small horizontal, small vertical steerers.
At some aatenuator or frequency values, the energy jitter appears and a lot of mistriggers.
Good storage obtained. Recipie saved : recipe_recipe_LI_TL_RI_good_20240301_15_50_35.txt
For TL orbit and Ring Orbit see screenshots.
16.10 Stop machine. Ronic, Daniele need access for FP Cavity.
|
| Attachment 1: Screenshot_from_2024-03-01_12-38-33.png
|
 |
| Attachment 2: Screenshot_from_2024-03-01_12-42-10.png
|
 |
| Attachment 3: Screenshot_from_2024-03-01_14-54-03.png
|
 |
| Attachment 4: Screenshot_from_2024-03-01_15-23-58.png
|
 |
| Attachment 5: Screenshot_from_2024-03-01_15-24-13.png
|
 |
| Attachment 6: Screenshot_from_2024-03-01_12-38-33.png
|
 |
| Attachment 7: closed_orbitGOOD_STORAGE_RF100kV_COR_01032024.png
|
 |
| Attachment 8: closed_orbitNATURAL_RF100kV_woCOR_01032024.png
|
 |
| Attachment 9: closed_orbitNATURAL_woRF_01032024.png
|
 |
| Attachment 10: dspersionHor_01032024.png
|
 |
| Attachment 11: TLSpXvsAtt_01032024.png
|
 |
| Attachment 12: TLSpXvsDP_01032024.png
|
 |
| Attachment 13: Screenshot_from_2024-03-01_13-19-44.png
|
 |
|
851
|
Fri Mar 1 10:39:04 2024 |
VK, VM, IC on Thu Feb 29 | Under Process | Shift summary | Ring | Ring Commissioning |
|
Recomissioning of the SR, search for the revolution frequency | |
Start of the machine 9h
Optimization of the beam transport to the Ring.
Work on the lattice of the Ring and search for the revolution frequency.
Attempt to perform teh BBA
At 16h beam is taken by Linac team (CB/JNC)
|
| Attachment 1: Screenshot_from_2024-02-29_12-15-58.png
|
 |
| Attachment 2: Screenshot_from_2024-02-29_14-27-36.png
|
 |
| Attachment 3: Screenshot_from_2024-02-29_11-27-21.png
|
 |
|
Draft
|
Thu Mar 7 08:58:28 2024 |
VK, VM, IC | Under Process | Shift summary | Ring Commissioning |
|
Recomissioning of the SR, search for the X-rays | |
8h50 Warming up the machine
Problem with the vaccum around the RF cavity (see screenshot attached). Intervention of vacuum team is needed.
Mohamed is installing the powermeter to monitor the incomingt RF power for the accelerating structure.
Laser camera should be checked before the beam start-up
Due to the vaccum cable connector we can not start the beam. |
| Attachment 1: Screenshot_from_2024-03-07_09-02-36.png
|
 |
|
1062
|
Wed Apr 30 08:51:08 2025 |
VC, DN, MJ, IC, VM | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
Recherche position image camera MRSV | |
Start chauffage 9H
There were some problems: the phase section motor was in the wrong position, although the readings were normal; The rear door of the septum power supply was not fully closed.
12h04 Beam is in the ring, RF cav. at 50 kV, phase is 22.5 dg., the receipt from 17/04/2025 12:31 for the ring. RF gun phase is 153.6 dg. Sect Att. is 2.74 dB, Sect. phase is 211 dg. Receipt saved to referenses folder with MSRV mark
** Recherche point image camera MRSV
Deplacement vertical camera par pas d'environ 5 mm - Mesures des fwhm X et Y camera
12h15 Modulator has been put into standby mode: access to the bunker.
12h45 HV is 'ON' RF gun phase was set to 143.6 dg. Sect phase was set to 208 dg. Charges: -41 pC, -41 pC, -45 pC, Ring TbTsum about 2e7
13h55 Modulator has been put into standby mode: access to the bunker.
14h13 HV is 'ON'
14h16 Modulator has been put into standby mode: access to the bunker.
14h29 HV is 'ON'
14h35 Modulator has been put into standby mode: access to the bunker.
14h49 HV is 'ON'
15h00 Modulator has been put into standby mode: access to the bunker.
15h15 HV is 'ON'
15h22 Modulator has been put into standby mode: access to the bunker.
15h38 HV is 'ON' RF Gun phase is 144.6 dg.
15h46 Modulator has been put into standby mode: access to the bunker.
16h06 HV is 'ON'
16h27 Modulator has been put into standby mode: access to the bunker.
16h46 HV is 'ON'
==> cf screenshot des trends fwhm X et Y MRSV
Points notes sur brouillon par Daniele, a fitter avec une parabole pour determiner les 2 minima X et Y (astigmatie)
Data des trends : MRSV_fwhm_X.dat et MRSV_fwhm_Y.dat dans data/shared
** Verification avec le laser des axes X et Y pour voir s'ils ne sont pas inverses
16h52 Modulator has been put into standby mode: access to the bunker.
Les axes X et Y MRSV sont bien les axes reels X et Y
Cf screenshots : total_beam, coupe_moitie_basse, coupe_moitie_haute
** Test de la procedure de calibration de la cam MRSV
17h28 HV is 'ON'
Position verticale faisceaux sur les 2 bpm autour du dipole :
1) nominal MRSV
2) +0.8
3) +1
4) retour nominal MRSV
==> La positon verticale sur MRSV varie bien comme on l'attend
C'est reproductible ==> Calibration a faire avec la camera en position image
17h42 Stop ThomX
|
| Attachment 1: 2025-04-30_16-23-33_MRSV_fwhm_trends.png
|
 |
| Attachment 2: 2025-04-30_17-14-26_total_beam.png
|
 |
| Attachment 3: 2025-04-30_17-15-03_coupe_moitie_basse.png
|
 |
| Attachment 4: 2025-04-30_17-15-54_coupe_moitie_haute.png
|
 |
|
168
|
Wed Nov 17 14:00:28 2021 |
Entered by Super Team from 134.158.195.142 on Wed Nov 17 14:00:15 2021 | Fixed | Fix | Diag | Linac Commissionning |
|
Recherche du signal ICT après la section | |
Alexandre Moutardier :
Signal ICT (ER/CA/RAC.05-ELR.01-WAC.02 channel CH3) pas visible après la section bien que le faisceau passe au vu des signaux sur le BPM et l'écran.
-> PB résolue : le WaveCatcher (WAC) était en mode trigger interne et non en mode Externe (code 3)
Signal bien visible, et une bonne partie du faisceau semble passer la section.
Mesure de charge (NON OFFICIEL !) a partir des données ICT brute :
| |
avant la section |
après la section |
| charge |
87 pC |
78 pC |
| deviation standard |
5 pC |
5 pC |
Soit 90% de charge passant la section. |
| Attachment 1: 2021-11-17_14_19_8_scan_charge_phase_TL1.jpg
|
 |
| Attachment 2: 2021-11-17_14_20_22_scan_charge_phase_Li.jpg
|
 |
|
330
|
Mon Feb 14 10:12:10 2022 |
Entered by Moutardier Alexandre from 134.158.195.142 on Mon Feb 14 10:11:53 2022 | Under Process | Fix | SY |
|
Recette synchro | |
Nouvelle recette synchro par défault enregistré : 20220201_reference.xml
A tester en faisceau dans la journée.
Ne pas en utiliser d'autre !
|