Entry   VK, IC. VM, LS; Work on the new optics 
9h30 Start of the modulator and laser

Start of the beam. Problem with charge, the max charge at the end of the TL 60 pC. We can not increase it by the attenuator. To be understood.



Corrector ri-c2/ps/str.03-h.01 does not work => problem to control and tune the orbit. JNC will look
Entry   IC, VM; Work on orbit at 70 MeV for X rays xorbit70MeV_Xrays_20032026.pngyorbit70MeV_Xrays_20032026.pngScreenshot_from_2026-03-20_15-49-43.pngY_orbit61.5MeV4Xrays.pngX_orbit61.5MeV4Xrays.png
7h20: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

08h55 HV is ON

10h07 70 MeV. Beam is in the ring with RF 100 kV, phase -37.5 dg. The recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt loaded, linac steerers
Entry   Entered by Nicolas Delerue from 80.119.21.73 on Mon Jan 10 22:14:00 2022; WAC reset 
Les wavecatchers ont été réinitialisés pour qu'ils se déclenchent correctement.
icon1.gif   Entered by Super Team from 134.158.195.142 on Tue Oct 18 17:39:43 2022; Voyant rouge en salle Laser 
Voyant apparu vers 17h 

SPR est passé voir : peut-etre en lien avec la clim

ce serait la centrale de traitement d'air dont le premier filtre est encrassé. Voyant rouge sur la CTA. 
icon1.gif   Entered by Hayg Guler from 134.158.195.141 on Mon Oct 4 19:19:08 2021; Vide pendant la prise de données  Screenshot_from_2021-10-04_19-21-32.png
 
Entry   Entered by Moutardier from 134.158.76.123 on Tue Dec 1 09:56:35 2020; Verrification pour le démarrage a blanc 
Verification de l'état de la Synchro : OK, tout les signaux sont en trigger externe.

Verification de l'état des diagnostiques :
- Libera 3 : n'est pas encore cofiguré (pas génant pour le démarrage a blanc)
Entry   ND; Verifications IHM_cyclage 
9:00 Accès pour FPC

Recherche des problemes de plantage de l'IHM cyclage.

Plantages difficiles a reproduire (pas de plantage quand j'essaie).
Entry   Entered by Nicolas Delerue from 134.158.89.243 on Thu Jul 1 10:03:48 2021; Veni vedi exit 
Sommes venus pour la reunion SST (ecrans) .

Personne en salle de controle.

Sommes repartis... Appelez nous dans notre bureau quand vous etes prets.
Entry   Entered by sophie chance from 134.158.195.142 on Tue Oct 12 16:01:27 2021; Valeurs transport linac pour tests radioprotection 
Attenuation canon : 2 dB car des claquages sont apparus lors de l'augmentation de l'intensité dans les solénoïdes, mesure
à l'oscillo Pic = 140 mV environ --> 77 MV/m

Phase canon = 40 degres energie max pour le transport
Entry   Entered by Marie Jacquet from 134.158.89.45 on Tue Oct 11 11:09:03 2022; Valeurs des BPM LI et TL_1 surestimees ? 2022-10-11-BPM-YAG-STR.pdf
Ci-jointes des donnees BPM et YAG LI et TL_1, prise le 20/06 puis le 06/10, en fonction de valeurs des steerers 1 (pour LI) et 3 (pour TL)

--> Les valeurs mesurees au BPM ont l'air surestimees d'environ 30%.
Entry   Entered by Super Team from 127.0.0.1 on Tue Jun 23 09:43:18 2026; Vaccum in the FPC 
09h00 Start-up modulator, laser, fridge, chillers

After discussion with Daniele

Goal/Priority: Check for leakage in the FPC
Entry   VK, IC. AL; Understanding of the shift in RF frequency 18x
8:40 Start warming up, problem with PSS. It was restarted.

Problems to start and tune the RF cavity. A clear working procedure and reliable tuning should b defined to optimize the Ring comissioning progress.

Feedback for teh RF has the suspicious behavior. At motor position close to the nominal, the feedback ofsets the motor in the negative direction
Entry   MJ HG KD VC; URGENT SST off  SST_HS_023-03-06_12-14-40.png2023-03-06_14-44-27.png2023-03-06_14-49-54.png
Camera SST inutilisable en debut de shift. IL FAUT ABSOLUMENT ARRETER de faire des trucs sur les cameras entre 2 shifts ! je n'ai
pas les competences pour remettre les sst en marche. Les boutons n'y font rien;

Nicolas peux-tu agir pour qu'on puisse commencer le shift. Merci
Entry   HG/CB/KD; Twiss = F(Solé) 
Phase de Q max : 195, on decale de -50 degrés

IRIS :0.7 mm, att  400, charge 100 pC --> laser sauvé, sigma x,y rms 0.21 mm

coil2 betax0 betay0 alphax0 alphay 0
Entry   Entered by mohamed el khaldi from 134.158.76.146 on Fri Sep 17 09:12:06 2021; Tuning des HOM's de la cavité RF anneau en stand by aprés les coupures d'électricité  
le tuning automatique des HOM's de la cavité RF anneau fonctionnait bien avant les coupures d'éléctricité.

à mon retour des vacances je voulais reprendre les tests mais en vain

deux hypothéses se présentent:
Entry   Entered by Moutardier Alexandre from 134.158.195.144 on Fri Nov 19 09:24:11 2021; Trou dangereux !!! trou_escalier_anneau.jpg
Ce matin en verifiant les orientations des jauges dans l'anneau pour faire des simulations correcte j'ai du entrer dans l'anneau.

En resortant je suis pris les pieds dans le trou sous l'escalier (cf photo) et j'ai failli tomber !!!

Ce trou est extrement dangereur car dans le passage a un endroit ou l'on voit dificilement nos pied. Il faudrait le reboucher
Entry   MJ; Trends - conditionnement section 23 juillet 
Je viens de sauvegarder les trends conditionnement d'aujourd hui dans data/shared du jour
Entry   Entered by Super Team from 134.158.195.142 on Mon Oct 11 13:45:53 2021; Travaux 
Travaux en cours à l'extérieur, le goudron sur le chemin a été enlevé, une pelleteuse bloque le passage vers ThomX,
le passage est possible mais difficile
Entry   Entered by HG/JNC/SC from 134.158.195.142 on Thu Mar 17 15:27:21 2022; Transport faisceau 2022-03-17_15_26_47_tl_dg_sst_01-ccd_01_RAW.png2022-03-17_15_30_48_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_20_18.png
Modulateur en marche

Transport faisceau jusqu'à TL/DG/SST.01 

Charge = 55 pC, Energie laser non mesurée aujourd'hui
Entry   Entered by Super Team from 134.158.195.142 on Thu Nov 25 10:52:12 2021; Transport 
Optimisation charge et transport. Charge 100 pC ok.

Optimisation phase canon faite

Optimisation phase section en cours