HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 11 of 61  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Status Type Category Important Subject Icon Text Attachments
  1031   Fri Mar 7 11:03:20 2025 Entered by Super Team from 134.158.195.141 on Fri Mar 7 11:03:05 2025Under ProcessShift summaryLI | Diag Test streak camera 7/03 9:10 Debut alignement

10:30 Mise en chauffe machine

10:45 Fin alignement
  
  1030   Thu Mar 6 10:38:31 2025 Entered by Marie Jacquet from 134.158.205.25 on Thu Mar 6 10:37:50 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Programme de la journee : preparation des valeurs a remplir  1 : Alignement Axe
Q1-Q3 avec SCRIPT - Conditions
 Compare_Align_ALL.pngTrend_Position_Yag_Sautes.pngJauges_2025-03-06_18-47-14.png2025-03-06-Q1Q3_Q4Q5.pdf 
  1028   Wed Mar 5 08:53:34 2025 VM, VC, RC, DNUnder ProcessShift summaryRing Commissioning   08h53 Start ThomX

11h10 The oscilloscope installed
in the bunker
 16x 
  1027   Tue Mar 4 18:42:57 2025 Entered by Super Team from 134.158.195.141 on Tue Mar 4 18:42:42 2025Under ProcessLinacLI | TL Conditionnement Canon 1- Conditionnement du Canon à 16
dB, on gagne un peu en vide. 

2- sautes du faisceau : vérification
 Jumps_YagLI.pngJumps_YagLI_NoSteerer.png 
  1026   Tue Mar 4 11:49:34 2025 KDReference SolutionInfoLaser | Opt realignement laser PhotoCathode Sortie laser 260 - 265uJ

Injection ligne de transport 240uJ

point initial : 
 2025-03-04_09_45_28_li_op_las_02_RAW.png2025-03-04_10_54_45_li_op_las_02_RAW.png 
  1025   Tue Mar 4 09:03:11 2025 KDUnder ProcessShift summaryLI | Laser | Opt | Linac Commissionning shift du 4 février 2025 7h40: mise en chauffe en remote laser PC

9h : mise en chauffe modulateur,
chiller/frigo
  
  1024   Fri Feb 28 00:32:21 2025 Entered by Marie Jacquet from 134.158.205.38 on Thu Feb 27 23:45:19 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning 27 fevrier (visite Alberto Paola Luca)  ** Nouvelle
prise d'images pour determiner les distortions
du det :
  
  1023   Thu Feb 27 07:37:25 2025 KD, VM, SK, NDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 27 février 2025 7h45: mise en chauffe en remote (Frigo/chiller,
laser, cyclage aimants)

Le Modulateur ne répond
 12x 
  1022   Wed Feb 26 22:52:03 2025 Entered by Marie Jacquet from 88.165.97.136 on Wed Feb 26 22:50:49 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning 26 fevrier (visite Alberto Paola Luca) - Detecteur Photonic Science  Suite du commissioning
det Photonic Science

**
  
  Draft   Wed Feb 26 07:30:15 2025 KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 26 février 2025 7h30: mise en chauffe en remote (Modulateur,
frigo/chiller, laser, cyclage aimants)

8h35 HV is 'On'
  
  1020   Tue Feb 25 22:59:57 2025 Entered by Marie Jacquet from 88.165.97.136 on Tue Feb 25 22:59:29 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning 24 -25 fevrier (visite Alberto Paola Luca) - Detecteur Photonic Science Commissioning det Photonic Science

** Depose
Dectris, mise en place Photonic, alignement
  
  1019   Tue Feb 25 08:09:54 2025 KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 25 février 2025 8h10: mise en chauffe machine en remote
(Frigo/chiller, modulateur, laser, cyclage
aimants)
 Charge_Drop.png 
  Draft   Mon Feb 24 08:00:09 2025 KD VC VMUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 24 février 2025 8h: mise en chauffe de la machine (Frigo/chiller,
laser, modulateur et cyclage aimants).

9H demarrage faisceau
  
  1017   Fri Feb 21 08:30:30 2025 shift crewUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 21 février 2025 8h30 : démarrage machine en remote
(modulateur, laser, chiller/frigo, cyclage)

Nouveau
 6x 
  1016   Thu Feb 20 08:25:11 2025 Entered by Super Team from 134.158.195.141 on Thu Feb 20 08:24:55 2025Under ProcessShift summaryRing Commissioning   08h25 Start ThomX; Start ThomX: Modulator,
Fridge, Laser

08h32 Chillers were started, cycling
 6x 
  1015   Wed Feb 19 17:32:30 2025 shift screw Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Rustine pour le probleme CEM kicker - ring storage - Xrays Cable ventilo kicker debranche ==> aucun
effet
Cable balise blinde ==>
 storage_et_Xrays_2025-02-19_19-01-58.pngdet2diodes_pb_voie4_2025-02-19_19-16-07.png 
  1014   Wed Feb 19 08:28:11 2025 Entered by Super Team from 134.158.195.141 on Wed Feb 19 08:27:57 2025Under ProcessShift summaryRing Commissioning   08h26 Start ThomX: Modulator, Fridge, Laser

08h32 Chillers were started, cycling
all magnets
  
  1013   Tue Feb 18 08:28:36 2025 VC, KD, VM, ND, RC, MJUnder ProcessShift summaryLI | Linac Commissionning shift  demarrage machine 8h30

intervention Kicker.. 8h45 

10H30 fin intervention Kicker Ok
 Screenshot_from_2025-02-18_17-52-13.pngScreenshot_from_2025-02-18_17-51-17.pngScreenshot_from_2025-02-18_17-49-55.pngScreenshot_from_2025-02-18_17-58-05.pngScreenshot_from_2025-02-18_17-59-46.png 
  Draft   Mon Feb 17 11:00:01 2025 VM, IC, VKUnder ProcessShift summary  70 MeV WP 10h30 Start beam

Since Friday evening the problem
to store the beam at 70 MeV. There is 1 turn
  
  Draft   Fri Feb 14 08:21:26 2025 Entered by Super Team from 134.158.195.141 on Fri Feb 14 08:21:09 2025Under ProcessShift summaryRing Commissioning   08h20 Start ThomX: modulator, laser, fridge,cycling
all magnets

08h25 chillers are started
  
ELOG V3.1.4-395e101