ID Date Author Status Type Category Importantdown Subject Icon Text Attachments
  161   Fri Nov 12 19:13:39 2021 Entered by Christelle Bruni from 82.64.20.144 on Fri Nov 12 19:13:14 2021FixedShift summaryLinac Commissionning bilan du 12 novembre Modulateur/RF

-Intervention
scandinova ce vendredi 12 (demander rapport
 bilan_12112021.pptx 
  162   Mon Nov 15 09:20:24 2021 Entered by Maher OMEICH from 134.158.91.212 on Mon Nov 15 09:20:04 2021Not FixedProblemLinac Commissionning IHM  Bonjour,

la consigne dans l'IHM RF ne
fonctionne pas
  
  163   Mon Nov 15 09:41:50 2021 Entered by Maher OMEICH from 134.158.91.212 on Mon Nov 15 09:20:04 2021Not FixedProblemLinac Commissionning RE: IHM  Ça doit être bon maintenant

  
  164   Mon Nov 15 10:22:52 2021 Entered by Maher OMEICH from 134.158.91.212 on Mon Nov 15 10:22:36 2021Not FixedProblemLinac Commissionning   re-Bonjour

une remarque: quand vous appuiez
par erreur sur les boutons rouges qui se
  
  165   Tue Nov 16 11:44:06 2021 Entered by Hayg Guler from 134.158.195.141 on Tue Nov 16 11:43:53 2021Under ProcessInfoLinac Commissionning Shift Alignement tete de machine  Laser : 


Nouveaux
hublots pour le Laser photocathode 
Environ
50 µJ sur la photocathode
Stabilité
 charge_pahse.jpg 
  167   Wed Nov 17 11:28:50 2021 Entered by Super Team from 134.158.195.142 on Wed Nov 17 11:28:36 2021Under ProcessInfoLinac Commissionning run du 17 novembre pour rappel le programme de la journée
:

•Vérification de la
 charge_pahse.jpgcharge_phase.csv2021-11-17_12_04_19_li_dg_sst_01-ccd_01_RAW.pnglaser_13h.png 
  168   Wed Nov 17 14:00:28 2021 Entered by Super Team from 134.158.195.142 on Wed Nov 17 14:00:15 2021FixedFixDiag | Linac Commissionning Recherche du signal ICT après la section Alexandre Moutardier :

Signal ICT (ER/CA/RAC.05-ELR.01-WAC.02
channel CH3) pas visible après
 2021-11-17_14_19_8_scan_charge_phase_TL1.jpg2021-11-17_14_20_22_scan_charge_phase_Li.jpg 
  171   Thu Nov 18 18:39:18 2021 Entered by Hayg Guler from 134.158.195.141 on Thu Nov 18 18:39:04 2021Under ProcessShift summaryLinac Commissionning Energies avant section pour différents gradients  Methode : 

on utilise le steerer LI/PS/STR01-V01
et les mesures sont faites sur le Yag de
  
  173   Mon Nov 22 11:21:00 2021 Entered by Super Team from 134.158.195.142 on Mon Nov 22 11:20:47 2021Under ProcessShift summaryLinac Commissionning run du 22 novembre Planning de la journée:

- Mesure d'énergie (Hayg,
Christelle, Muath)
  
  174   Tue Nov 23 10:44:04 2021 Entered by Super Team from 134.158.195.142 on Tue Nov 23 10:43:41 2021Under ProcessShift summaryLinac Commissionning run 23 nov 2021 Intervention modulateur par Maher

Remise en eau dans la boucle générale
par Jean-Noel
  
  175   Tue Nov 23 10:56:50 2021 Entered by Iryna Chaikovska from 134.158.195.143 on Tue Nov 23 10:56:34 2021FixedOtherAimants | Linac Commissionning Cyclage dipole  For 22/11/2021

There is the remaining field from
the dipoles in the TL. In order to go straight
 cylage_dipole.pngScreenshot_from_2021-11-23_12-16-04.pngScreenshot_2021-11-23_at_14.40.52.png 
  177   Tue Nov 23 13:12:37 2021 Entered by Iryna Chaikovska from 134.158.89.93 on Tue Nov 23 13:12:22 2021Under ProcessOtherAimants | Linac Commissionning Cyclage quadrupoles 23/11/2021

We would like to cycle the quadrupoles
in the linac. The procedure of the cycling
 Screenshot_2021-11-23_at_13.14.26.pngScreenshot_from_2021-11-23_14-09-27.pngScreenshot_from_2021-11-23_14-10-15.pngcylage_quad.pngcylage_quad2A.png 
  178   Wed Nov 24 11:21:41 2021 Entered by Super Team from 134.158.195.141 on Wed Nov 24 11:21:24 2021Under ProcessLinacLaser | Linac Commissionning shift du 24 Novembre 2021 Laser :


Viktor a remis
le hublot pour gagner en stabilité
laser
Energie laser : 54 µJ
laser
 charge_phase__at_24-11-2021__15-11-41.jpgScreenshot_from_2021-11-24_15-23-50.pngScreenshot_from_2021-11-24_15-51-42.png 
  179   Wed Nov 24 16:52:29 2021 Entered by Super Team from 134.158.195.141 on Wed Nov 24 16:52:10 2021Under ProcessLinacLinac Commissionning Mesure d'energie Calibration Ecran TL-SST01

 
  
  180   Thu Nov 25 09:24:52 2021 Entered by Super Team from 134.158.195.142 on Thu Nov 25 09:24:38 2021Under ProcessLinacLinac Commissionning Démarrage Démarrage modulateur

Viktor aligne le laser, acces en
zone controlée pour ne pas casser
  
  181   Thu Nov 25 10:07:23 2021 Entered by Super Team from 134.158.195.142 on Thu Nov 25 10:07:10 2021FixedLinacLinac Commissionning Laser Réglages laser terminés,
117 uJ en sortie , 50 uJ sur la photocathode.

Le hublot est resté
  
  182   Thu Nov 25 10:52:26 2021 Entered by Super Team from 134.158.195.142 on Thu Nov 25 10:52:12 2021Under ProcessLinacLinac Commissionning Transport Optimisation charge et transport. Charge
100 pC ok.

Optimisation phase canon faite
  
  183   Thu Nov 25 11:10:49 2021 Entered by Super Team from 134.158.195.142 on Thu Nov 25 11:09:21 2021FixedLinacLinac Commissionning Mesure energie  Mesure avec charge 100pC  scan_energiedeg_GUN_0.dB_LIL_1.5dB_LIL_phase_100deg_ROI__at_25-11-2021__11-07-51.jpg 
  184   Thu Nov 25 11:19:26 2021 Entered by Super Team from 134.158.195.142 on Thu Nov 25 11:19:08 2021FixedLinacLinac Commissionning Mesure energie  Energie avec 2 dB section, 100 pC transport
ok
 scan_energiedeg_GUN_0.dB_LIL_2.0dB_LIL_phase_100deg_ROI__at_25-11-2021__11-14-44.jpg 
  185   Thu Nov 25 15:01:54 2021 Entered by Super Team from 134.158.195.142 on Thu Nov 25 15:01:41 2021Under ProcessLinacLinac Commissionning Contrôle Radioprotection Les controles radioprotection ont commencé
vers 14h50

Paramètres faisceau : 100
  