| ID |
Date |
Author |
Status |
Type |
Category |
Important |
Subject |
Icon |
Text |
 |
|
Draft
|
Tue Apr 21 07:36:54 2026 |
KD, VM | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 21 avril 2026 | | 7h30 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage) ==> dipôles
non cyclé (en défaut) ==> |
|
|
Draft
|
Wed Apr 22 10:26:28 2026 |
IC,VM | | | |
|
| | Dalkia solved the problem with vooling
circuit in the morning
10h15 mise en chauffe (frigo/chillers, |
|
|
Draft
|
Thu Apr 23 09:06:22 2026 |
IC, VM | | | |
|
| | 9h00 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage) |
|
|
Draft
|
Fri Apr 24 08:05:11 2026 |
Entered by Super Team from 127.0.0.1 on Fri Apr 24 08:05:02 2026 | | | |
|
, entered from 127.0.0.1 | | 8h00 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage) |
|
|
1239
|
Mon May 11 09:33:17 2026 |
Vincent | Under Process | Linac | LI | TL |
|
Manip Gplast | | 9h30 test radioprotection OK (mesure en
dessous du bruit de fond)
13h30 fenetre installée |
|
|
1240
|
Tue May 12 08:42:45 2026 |
Entered by Super Team from 127.0.0.1 on Tue May 12 08:42:31 2026 | Under Process | Other | LI |
|
manip Gplast | | Demarrage machine 8h40
pB reflechi canon... temp consigne
27.7C |
|
|
1241
|
Wed May 13 08:35:16 2026 |
Entered by Super Team from 127.0.0.1 on Wed May 13 08:35:01 2026 | Under Process | Other | LI |
|
manip Gplast | | demarrage machine 8h30
faisceau ok vers 10H
14h mesure 50 MeV |
|
|
Draft
|
Wed Jun 3 08:41:41 2026 |
IC, HG, JNC | | Shift summary | |
|
Restart of the accelerator | | 02/06/2026
~15h30 Starting all system
16h Start up of the modulator, |
|
|
Draft
|
Wed Jun 3 08:54:55 2026 |
IC, VM | Under Process | Urgent | LI | RF Anneau |
|
Restart of the accelerator | | 08h45 Start-up modulator, laser, magnets
09h38 Shutter Laser Linac is yellow.
Tuning off the gun operation key does not |
 |
|
Draft
|
Tue Jun 9 10:13:24 2026 |
Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026 | | | |
|
| | 10h02 Start-up modulator, laser, fridge,
chillers
The SF6 pressure is low. Magnet |
|
|
1245
|
Fri Jun 12 13:08:13 2026 |
Kevin D. | Reference Solution | Info | Laser | Opt | Linac Commissionning |
|
Laser PC status | | mise à jours du post : https://elog.lal.in2p3.fr/THOMX/Commissionning/1188
** Laser PC ***
- Sortie Laser: 120 uJ |
|