1043
|
Fri Mar 21 07:43:44 2025 |
KD, VM, IC, RC, VC, SC, MJ | Under Process | Shift summary | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 21 mars 2025 | | 7h40: mise en chauffe de la machine en remote (modulateur, frigo/chiller, laser, cyclage aimants)
*** Programme de fin de semaine ***
matin : finalisation de la prise de donnée de la session imageries X
après-midi : libre pour continuer les actions sur la machine (passage 61.5MeV ?)
08h58 HV is 'On'
RF Cav at 100 kV, phase is -39 dg.09h30 Beam is in the ring. RF gun phase is 240 dg. Sect phase is 206 dg. Att. sect. is 2.51 dB, TL/BPM2 x=2 mm, charges: -110 pC, -109 pC, -120 pC,
Linac steerers: H [0.75 -2.81], V [-2.46 2.89]
09h38 Vertical scan by FPC table
10h45 RF cav. at 200 kV, phase is -39 dg.
13h17 RF cav. at 200 kV, phase is -42 dg. RF gun phase is 235 dg. Sect phase is 209 dg. Att. sect. is 2.55 dB, TL/BPM2 x=3 mm, charges: -110 pC, -110 pC, -121 pC,
14h00 Problems (micro blackout). Modulator turned off, dipoles turned off, RF resonator turned off, 500 MHz signal missing. Trying to restart.
15h03 HV is 'ON'
16h46 Stop ThomX |
|
1042
|
Thu Mar 20 18:41:55 2025 |
Entered by Marie Jacquet from 134.158.205.16 on Thu Mar 20 18:41:39 2025 | | Shift summary | LI | Ring | Linac Commissionning | Ring Commissioning |
|
19 et 20 mars - Mesures X-rays - Bravin & co | | 19 mars 2025
Photonic juste derriere hexa échantillon
- Lag time
- PMMA
- 2D : Resolution detecteur - To-MTF – Hexa échantillon
- 2D : TOR-MAM off-axis (énergie 42 keV - cf spectre) – Hexa échantillon
- Tomo : Micro-CT-bar-pattern – Hexa échantillon
- Tomo : Micro-CT-contraste-scale – Hexa échantillon
20 mars 2025
Contraste de phase : Photonic au fond de la X-Hutch
- 2D : Fil pêche - Hexa mono
- 2D : Fleur - Hexa mono
- Tomo : micro-CT-bar-pattern – Hexa échantillon
- Tomo : Fleur – Hexa échantillon
- Vers 14h30 : 2D : File de pêche – Hexa mono – single shot
- 2D : Araignée – Hexa mono
- Tomo : plusieurs piments dans une boite – Hexa échantillon
- 2D : TOR_MAM – Hexa mono - Images du bas du phantom, tous les 10 mm Tx.
- 2D : Fil de pêche – Hexa mono – Plusieurs single shots
|
|
1041
|
Thu Mar 20 07:39:28 2025 |
KD | Under Process | Shift summary | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 20 mars 2025 | | 7h40: mise en chauffe de la machine (modulateur, laser, frigo/chiller, cyclage aimants)
*** Programme imagerie X ****
- radiographie en contraste de phase
- Tomographie en contraste de phase
8h40 HV is 'On'
10h13 Beam in the ring. RF Gun phase is 233 dg., Sect. phase is 209 dg. Att. sect. is 2.54 dB, TL/BPM2 x=1.5 mm. RF Cav at 200 kV , phase -38.5 dg.
The FPC phase was adjusted to maximize I3 current (between 25000 and 30000).
10h46 Charges: -145 pC, -145 pC, -160 pC. Have a growing trend.
10h50 The RF gun phase was set to 226 dg. to restore storage and x-ray. The injection is very unstable.
11h43 RF gun phase 219 dg. Sect. phase 209 dg. RF cav. phase -43.5 dg. I3 curr. from 40000 to 50000
12h27 RF gun phase 218 dg. Sect. phase 207 dg. Att. 2.48 dB, TL/BPM2 X=1.5 mm to 2 mm, RF cav. phase -43.5 dg., 200 kV, I3 curr. around 40000 pA
16h45 RF gun phase 215 dg. Sect. phase 209 dg. Att. 2.51 dB, TL/BPM2 X= 2 mm, RF cav. phase -46.5 dg., 200 kV, I3 curr. around 40000 pA
17h28 RF gun phase 214 dg. Sect. phase 211 dg. Att. 2.56 dB, TL/BPM2 X= 2 mm, RF cav. phase -46.5 dg., 200 kV, I3 curr. around 40000 pA
18h57 Stop ThomX |
|
1040
|
Wed Mar 19 07:52:46 2025 |
KD, IC, RC, HG, DN | Under Process | Shift summary | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 19 mars 2025 | | 7h50: mise en chauffe de la machine en remote (modulateur, frigo/chiller, laser, cyclage aimants)
*** Programme de la 2e semaine de prise de données imagerie X ***
REPEAT
. Lag time measure with different exposure time, last time we did 200ms, go lower.
. Noise Power Spectrum, acquire 20 images with 2 thickness, for example 0 and 3 cm plexi.
. MTF one acquisition
.Tomography
NEW
. Wire
. Wedge Phantom
10h44 Beam is in the ring. RF Gun phase 10 dg., Sect. phase 207 dg., Sect. Att. 2.59 dB, Charges: -137pC, -135 pC, -147 pC
Linac steerers: H [0.55 -2.82], V [-2.62 2.86], TL/BPM2 X=4 mm -> 3 mm
11h09 RF Gun phase 11 dg., Sect. phase 208 dg., Sect. Att. 2.53 dB,
12h15 RF Gun phase 2 dg., Sect. phase 207 dg., Sect. Att. 2.61 dB, TL/BPM2 X=3 mm, RFCav. 150 kV Phase -19.5 dg.
13h49 Linac was readjusted: Gun phase -2 dg., Sect. phase 212 dg., Sect. Att. 2.53 dB, TL/BPM2 X=4.3 mm, RFCav. 150 kV Phase -19.5 dg.
14h07 Linac was readjusted: Gun phase -4 dg., Sect. phase 216 dg., Sect. Att. 2.53 dB, TL/BPM2 X=4.3 mm, RFCav. 150 kV Phase -19.5 dg. I3 current around 40000 pA
17h04 Linac was readjusted: Gun phase -6 dg., Sect. phase 217 dg., Sect. Att. 2.55 dB, TL/BPM2 X=3.7 mm,
18h51: stop thomx
|
|
Draft
|
Tue Mar 18 07:56:38 2025 |
KD, IC, RC, DN, VM | Under Process | Shift summary | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 18 mars 2025 - Mesure tailles transverses H et V de la source | | 7h55: mise en chauffe en remote (modulateur, laser, frigo/chiller, cyclage)
*** programme ***
- préparation de la machine pour la seconde session d'imagerie (du 19 au 21 mars)
- mesure et optimisation de la longueur de paquet dans le linac
-----------------------------------------------------------------------------
09h20 HV is 'ON'
09h30 RF gun phase is 10 dg., Sect Phase is 209 dg. Sect Att. is 2.57 dB, Charges: -107 pC
09h45 the modulator was set to the standby mode. Access to the bunker
Mesures X-rays in X-Hutch
** Verification Photonic Science avec le cable "Soleil" : ok
** Mesures tailles transverses source (H et V):
Fermeture partielle des fentes 1
Det Photonic sur bras detecteur (a 280 mm du zero hexapode)
Prise d'images des bords de la fentes (a differents voltages cavite RF, de 50 a 280 kV)
19h10 Stop ThomX |
|
1038
|
Fri Mar 14 08:31:19 2025 |
VM Entered by Super Team from 134.158.195.142 on Fri Mar 14 08:31:03 2025 | Under Process | Shift summary | LI | Diag |
|
Streak camera measurements | | 08h28 Start Thomx: Modulator, Laser, Frig
08h33 Chillers were started, cycling al magnets
9h00 MPS affichage: Arret d'urgence... Appel Nourredine, probleme resolu.
9h30 Laser aligned on streak camera
Fix technical issues.
11:00 First measurements with streak camera
13:00 Viktor repotimizes the linac.
New measurements.
Measured length 9.2ps, including ~1ps due to spot size.
Shot to shot jitter ~2.9ps (over 100 shots).
16h10 Vacuum interlocks V1
New measurments, the phase has drifted. Bunch is longer.
17h00 Stop ThomX |
|
1037
|
Thu Mar 13 11:57:19 2025 |
Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:57:03 2025 | Fixed | Info | Laser |
|
Etat laser | | Voici les distibutions UV laser sur lacathode avant et apres l'alignement |
|
1036
|
Thu Mar 13 11:25:29 2025 |
Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:25:13 2025 | Fixed | Linac | Laser |
|
Etat laser | | Bonjour, le parcours optique a ete realigne.
L'enegie UV sur la cathode = 48uJ , Iris = 1.3mm, Att = 410 |
|
Draft
|
Thu Mar 13 08:29:34 2025 |
VM, VC, RC, IC | Under Process | Shift summary | Ring Commissioning |
|
| | 08h27 Start ThomX: Modulator, Laser, Frig
08h34 Chillers were started, cycling al magnets
12H ready to start beam ( 13H30)
alignement laser done (alignement to do)
13h20 HV is 'ON'
13h31 RF Gun phase is 95 dg. the laser iris is 1.3 mm, the laser att. 340, RF Gun charge is -120 pC (the laser spot position was Hor. 4.282 mm, Vert. 3.327 mm ), screenshots of Li/SST1
13h35 laser spot alighment started at RF gun phase of 145 dg.
13h36 New position of the laser spot is: Hor. 4.282 mm, Vert. 3.327 mm
13h44 the modulator was put into standby mode, access to the bunker
14h13 HV is 'ON'
Two plots beam on LI STT 0.1
new receipe all 2025 03 13 14 46 52
Charge 120pC
RF power 150KV
17h12 RF gun phase 92 dg., Sect. phase 211 dg. I TL DP =159.3 A, TL/BPM X=4 mm, RF cav. 150 kV, phase -15 dg. Sum of TBTSum =1.8e11, Charges: -142 pC,-140 pC, -152 pC, I3 25000 pA
17h31 Adjusting ring lattice to rise X rays. I3 max was 45000 pA
18h29 Stop thomX
|
|
1034
|
Wed Mar 12 16:50:29 2025 |
Entered by Super Team from 134.158.195.143 on Wed Mar 12 16:50:08 2025 | | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Spectres X (positions fentes 2 et temps d'extraction) | | IP-Fente2 : 8835 mm
IP-capteur_CdTe: 10460
Calib ouverture Fentes2 : +0.1 en H / -1 en V
Fentes2 ouvertes a 0.5x0.5 mm ( ==> 0.6 H -0.5 V)
SPECTRES pour positions Fente2 (mm) : H Fente2 (H hexa ech) / V Fente2 (V hexa ech)
** V fentes2 = 27.5 mm
H fentes2
7.5 mm (-9.6)
5.5
3.5
1.5
Viktor reajuste electrons
-1.5
-6.5
7.5bis
9.5(-12.0)
11.5(-14.4)
13.5(-16.8)
15.5(-19.2)
18.5
21.5
25.5(-31.2)
30.5(-37.2)
35.0
45.0
Kevin reajuste laser and electrons
11.5bis
Fentes1 fermees a 5x5 mm (fentes2 11.5/27.5)
Fentes1 reouvertes
** V fentes2 = 29.5 mm (hexa 142.4) vers ~15h
H fentes2
11.5
13.5
15.5
9.5
7.5
2.5(-3.6)
20.5(-25.2)
** V fentes2 = 31.5 mm (hexa 144.8) vers ~15h30
H fentes2
20.5
15.5
13.5
11.5
9.5
7.5
2.5
** V fentes2 = 36.5 mm (hexa 150.8) vers ~15h50
H fentes2
2.5
9.5
11.5
13.5
20.5
** V fentes2 = 45.0 mm (hexa 161.0) vers ~16h10
H fentes2
20.5
11.5
2.5
-20(23.4)
** V fentes2 = 25.5 mm (hexa 161.0) vers ~16h25
H fentes2
2.5
11.5
20.5
** V fentes2 = 20.5 mm (hexa 131.6)
H fentes2
20.5
11.5
2.5
========================================
Spectres a differents temps d'extraction
Extraction electrons a 5 ms, 10, 15, 20, 1, 50, et 100=recette Kev
=======================================
fin de shift 19h
|
|
1033
|
Wed Mar 12 07:52:55 2025 |
KD, VM, MJ, DN, RC, IC | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 12 mars 2025 | | 7h50 : mise en chauffe machine (modulateur, frigo/chillers, laser, cyclage aimants)
**** Programme de la journée ****
- Mesure spectre angulaire (déplacement spectromètre dans le faisceau de rayons-X)
- Mesure spectre sur l'axe à différentes longueur de stockage
12h38 Beam is in the ring. X ray spectrum measurements. Parameters:
RF gun phase is 103 dg., Sect phase is 219 dg., Att. is 2.499 dB, TL/BPM2 X=+3 mm, Charges; -106 pC, -103 pC,-114 pC, the ring RF 150 kV, Phase -13 dg.
12h45 Vacuum interlock V1
13h12 RF gun phase is 97 dg., Sect phase is 212 dg., Att. is 2.449 dB, TL/BPM2 X=+3 mm, Charges; -104 pC, -105 pC,-115 pC, the ring RF 150 kV, Phase -13 dg. TBTSum=1.4e11 |
|
1032
|
Tue Mar 11 14:31:06 2025 |
VM | Under Process | Shift summary | Linac Commissionning |
|
| | 14h31 Start ThomX/ Modulator, Frig, Laser
14h37 Cycling all magnets, Chillers started
15h34 HV is 'On'
There are problems with the servers. Therefore, some tools are not working: Trends, Camera Laser and so on.
Servers restarted, we also used script from Kevin to restart properly DSs.
Beam Charge : 70 pC !!! RF gun phase is set to 109 dg.
17h30 Linac steerers H [0.67 -2.77], V [-2.95 3.19], RF Gun phase 214 dg. Att. 2.47 dB.
Measure dispersion in the TL
18h45 QP4 - QP7 set to 0
Screenshots of TL orbit for different Att.
18h53 HV is 'OFF', Stop thomX
|
|
1031
|
Fri Mar 7 11:03:20 2025 |
Entered by Super Team from 134.158.195.141 on Fri Mar 7 11:03:05 2025 | Under Process | Shift summary | LI | Diag |
|
Test streak camera 7/03 | | 9:10 Debut alignement
10:30 Mise en chauffe machine
10:45 Fin alignement
11:30 Demarrage
Puisance reflechie tres forte... On redescend en tension.
Pas de laser sur la camera. Le voyant "Danger laser" n'est pas allum'e en salle laser.
12:45 Toujours pas de laser, machine mise en standby.
Probleme gate_int?
13h50 Laser is back!
On parvient a transporter jusqu'a la camera streak mais on ne voit pas le signal sur la camera...
Realignement...
Toujours rien...
16h50 Arret faisceau
|
|
1030
|
Thu Mar 6 10:38:31 2025 |
Entered by Marie Jacquet from 134.158.205.25 on Thu Mar 6 10:37:50 2025 | | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Programme de la journee : preparation des valeurs a remplir | | 1 : Alignement Axe Q1-Q3 avec SCRIPT - Conditions : 5Hz et Q2 = 0
Str1_H =0.49
Str1_V =-3.10
Str2_H =-2.85
Str2_V =3.29
Feedback linac mis sur ON
Mesure avec Q1 Q3 ON
bpmTL1_X =-0.56 / -0.50 / -0.54
bpmTL1_Y =0.02 / 0.04 / 0.01
YagTL1_X =338 / 348 / 347
YagTL1_Y =268 / 269 / 264
2 : Determiner StrTL1_V pour passer au centre de Q4
StrTL1_V=0
Repasser en Linac
bpmTL1_X = pas remesure
bpmTL1_Y = ¨
YagTL1_X = ¨
YagTL1_Y = ¨
3 : Determiner StrTL2_V pour passer au centre de Q5
StrTL2_V = -8.10
4 : Determiner StrTL2_V pour passer au centre de Q6 - Condition : eteindre Q5
StrTL2_V = -7.90
5 : Determiner StrTL2_V pour passer au centre de Q7 - Condition : eteindre Q5 et Q6
Pas possible d'eteindre Q5 et Q6 a la fois. On se met a Q5 =0 et Q6=-4
150 microns de variations avec +/-3 ampere sur Q7
==> centre Q7 ok avec la valeur str de Q6
Courbe ROSE sur la pj
--------------------------------------------------------------------------------------------------------
6 : Refaire de 2. a 5. avec un autre axe LI en modifiant StrLI1_V et/ou StrLI2_V (la position faisceau doit etre bien differente sur YagTL1, autant qu faire se peut)
Str1_H =
Str1_V = -2.60
Str2_H =
Str2_V = 3.29
6/2 : Determiner StrTL1_V pour passer au centre de Q4
StrTL1_V= -5.6
Repasser en Linac
bpmTL1_X = -0.38 / -0.40
bpmTL1_Y = 1.98 / 2.07
YagTL1_X = 402 / 402
YagTL1_Y = 275 / 274
6/3 : Determiner StrTL2_V pour passer au centre de Q5
StrTL2_V = + 8.7
Courbe BLEUE CLAIRE sur la pj
--------------------------------------------------------------------------------------------------------
On recommence encore avec un autre axe
7 : Refaire de 2. a 5. avec un autre axe LI en modifiant StrLI1_V et/ou StrLI2_V (la position faisceau doit etre bien differente sur YagTL1, autant qu faire se peut)
Str1_H =
Str1_V = -3.2
Str2_H =
Str2_V = 3.29
6/2 : Determiner StrTL1_V pour passer au centre de Q4
StrTL1_V= +2.3
Repasser en Linac
bpmTL1_X = -0.34 / -0.33
bpmTL1_Y = -1.19 / -1.18
YagTL1_X = 403 / 403
YagTL1_Y = 256 / 256
6/3 : Determiner StrTL2_V pour passer au centre de Q5
StrTL2_V = ¨-15 ... 17¨ estime car en bout de course
Courbes ROUGE sur la pj (2 courbes pour 2 steerers StrTL2_V differents , mais ca ne change presaue rien)
==> On ne comprend rien (bug code reconstruction peut-etre?)
==================================================
18h Etude kicks faiscau sur LI (Yag et BPM)
Steerers OFF
Soleno 200
Kicks visibles sur Yag (cf screenshot)
Correles avec jauge 2 et jauge 3
Kicks declenches par la jauge 3 (puis la jauge 2 se declenche juste apres) - Vu en direct - Data sauvees
19h fin de shift
===================================================
Post shift : autre reconstruction des axes Quads, avec un code "Marie" - Cf pj
|
|
1028
|
Wed Mar 5 08:53:34 2025 |
VM, VC, RC, DN | Under Process | Shift summary | Ring Commissioning |
|
| | 08h53 Start ThomX
11h10 The oscilloscope installed in the bunker
11h11 HV is 'On'
11h45 The beam is in the ring
12h10 The modulator set to the Standby mode. Access to the bunker
12h24 HV is 'On'
12h30 RF Gun Phase is 15 dg., Sect. phase is 204 dg., Att. is 2.503 dB, TL/BPM2 X= 4 mm, Charges: -108 pC, -108 pC, -120 pC
12h35 Feedback on linac injection was started
13h00 Measurement of the stability of the temporal position of electron and photon bunches at the IP. RF Cav. at 200 kV, Phase 35 dg.
13h07 The linac was adjusted: RF Gun phase 10 dg., Sect phase 199 dg. Charges: -100 pC,-99 pC, -110 pC, Inj. qual. 0.965, Storage qual. 0.802
14h26 The linac was adjusted: RF Gun phase 11 dg., Sect phase 203 dg. Charges: -99 pC,-99 pC, -109 pC, Inj. qual. 0.984, Storage qual. 0.747, X ray flux I3=25000 pA
Phase between electron beam and FP photon have been done (attachements will come later) (Electron beam is a pickup (150ps fall time) at the IP and Photon beam is a photo diode (300ps rise time) at the FP cavity output).
time jitter is measured as the time difference between the two ulses at a fixed treshhold of 10mV)
measurements show a 33ps FWHM jitter (15ps) as long as the FPC is locked on the 500MHz . the jitter mainly come from FPC (see post FPC : https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/416)
15h35 The linac was adjusted: RF Gun phase 19 dg., Sect phase 212 dg. Charges: -105 pC,-104 pC, -115 pC, Inj. qual. 0.988, Storage qual. 0.786,
17h45 Stop ThomX
|
|
1027
|
Tue Mar 4 18:42:57 2025 |
Entered by Super Team from 134.158.195.141 on Tue Mar 4 18:42:42 2025 | Under Process | Linac | LI | TL |
|
Conditionnement Canon | | 1- Conditionnement du Canon à 16 dB, on gagne un peu en vide.
2- sautes du faisceau : vérification du signal avant la section.
Signal visible sur les positions, voir les 2 images, avec ou sans steerer.
hypothèse :
- si pas de saute sur le BPM-LI : le soucis est après le BPM, ou bien au niveau du BPM
- sauf si le BPM n'est pas assez sensible, ou bien pas assez de recul pour un signal perturbé en amont.
l'amplitude du signal semble aussi varier avec la taille faisceau. Pas de mesure systématique.
18h45 : On ferme |
|
1026
|
Tue Mar 4 11:49:34 2025 |
KD | Reference Solution | Info | Laser | Opt |
|
realignement laser PhotoCathode | | Sortie laser 260 - 265uJ
Injection ligne de transport 240uJ
point initial :
Sortie ligne de transport 140uJ
Sortie iris 1.3mm 42uJ
Sortie iris full 124uJ
Injection canon (420 pas), 1.3mm 40uJ
Injection canon (420 pas), full 110uJ
Nettoyage optique :
Injection canon (420 pas), 1.3mm 40uJ
Injection canon (420 pas), full 107uJ
Déplacement M5 + réalignement :
Sortie ligne de transport 140uJ
Sortie iris 1.3mm 50uJ
Sortie iris full 130uJ
Injection canon (420 pas), 1.3mm 40uJ
Injection canon (420 pas), full 110uJ
Image faisceau avant et après intervention. |
|
1025
|
Tue Mar 4 09:03:11 2025 |
KD | Under Process | Shift summary | LI | Laser | Opt | Linac Commissionning |
|
shift du 4 février 2025 | | 7h40: mise en chauffe en remote laser PC
9h : mise en chauffe modulateur, chiller/frigo
9h10 : accès casemate pour réalignement laser PC |
|
1024
|
Fri Feb 28 00:32:21 2025 |
Entered by Marie Jacquet from 134.158.205.38 on Thu Feb 27 23:45:19 2025 | | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
27 fevrier (visite Alberto Paola Luca) | | ** Nouvelle prise d'images pour determiner les distortions du det :
Ouverture fentes de 300 x 300 microns. Fentes fixes. Balayage du Photonic installe sur l' hexapode echantillon
Manip tres longue ... (pb de script, pb avec le DS Hexapode qui bloque tout le temps, pas d'X-ray, etc, etc).
Fin de manip vers 16h15 ....
** 16h15 : installation du Photonic tout au fond de la X-Hutch sur le support "Denis D." pour manip contraste de phase
** Deux Manips Contraste de phase :
1) Echantillon : 2 fils de peche tires horiz et verti sur une diapo (fil de peche : seulement 1% d'absoption) - Positionne sur l'hexa monochromateur -
Distance echantillon-detecteur ~ 4.5 m
Prise d'images ==> il semble qu'on voit les fils - Data a traiter
Remarque : on a oublie d'aligner le centre de la croix sur la partie basse du Photonic (la seule partie qui ne "saute" pas) ==> Manip a refaire
2) Fantome TO_MAM - Positionne sur l'hexa echantillon
Distance echantillon-detecteur ~ 3.7 m
Meme remarque : det non positionne partie basse ==> Manip a refaire
Prise d'image ==> On ne voit rien - Data a traiter
|
|
1023
|
Thu Feb 27 07:37:25 2025 |
KD, VM, SK, ND | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 27 février 2025 | | 7h45: mise en chauffe en remote (Frigo/chiller, laser, cyclage aimants)
Le Modulateur ne répond pas et ne veut pas passer en STANDBY ==> need to go on site
Problème d'intelock sur le refroidissement d'eau ==> redémarrage du PC modulateur ==> problème résolu ==> mise en chauffe à 8h30
9;35 Modulateur en trig
Receipt from 20250226_15_02_26
9:57 Beam in ring, Xray
RF Gun phase is 25 dg., Sect. phase is 206 dg., Att. 2.56 dB, TL/BPM2 SPx=2 mm. Charges from BPMs: -85 pC, -83 pC, -91 pC Linac steerers as in the receipt.
RF Cav. Volt. 200 kV, 35 dg.
11h45 Sum of the TBTSum =1.15e11, FPC power is 88 W, I3 current around 20000 pA, the kicker voltage was set to 9368 V (about 11h10) to rise X ray flux
12.30 RF Gun phase was set to 22 dg. to rise flux to 20000 pA, TL/BPM2 SPx=3 mm
15h42 The gun phase was set to 10 dg. sect phase 203 dg. with TL/SST2. TL/BPM2 SPx=2 mm
17:42 Stop ThomX |
|