  19   Thu Mar 4 16:57:46 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:57:33 2021Under ProcessShift summaryPrise de donnees tests redpitaya 3 

Tests des redpitayas 3 voie 1 (Pi canon) et voie 2 (Pr canon)

Attachment 1: RDP.03_voie1.png
RDP.03_voie1.png
Attachment 2: RDP.03_voie2.png
RDP.03_voie2.png
  20   Thu Mar 4 16:59:43 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021Under ProcessShift summaryPrise de donnees tests redpitaya 4 

Tests des redpitaya 4 voie 1 (Photodiode) et voie 2 (Q section)

Attachment 1: RDP.04_voie1.png
RDP.04_voie1.png
Attachment 2: RDP.04_voie2.png
RDP.04_voie2.png
  21   Thu Mar 4 17:07:32 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021Under ProcessShift summaryPrise de donnees Tests IHM RF 

Les tests se sont bien déroulés, on observe bien les signaux correspondants au redpitayas demandés.

Il faudra faire une modification sur l'IHM car tango bloque par moment et cela "freeze" l'IHM que l'on doit complètement redémarrer.

  23   Wed Aug 17 09:48:31 2022 HM MOUnder ProcessInfoPrise de donnees redemarrage 17 aout 2022 

9h30 redemarrage HM MO

- niveau 1 verifié (circuit eau, air comprimé, etat modulateur et SF6)

- ronde modulateur faite

- lancement IHM

      lancement IHM modulateur : pas de reaction

      accès à la casemate bloqué car sonde T3G est en défaut, redémarrage du système mesures radioprotection (LB 9000) ==> sonde T3G Ok

- ronde casemate faite

- démarrage modulateur en local

- utilisation de heath check pour redemarrer les servers

- demarrage modulateur HT = 1000 V et refroidissement a distance (sdc)

13h probleme de synchro : pas de synchro sur modulateur - a verifier

--> la notice synchro stipule de démarrer le laser photocathode en mode interne : mise sous tension du laser : ok

- la synchro externe modulateur fonctionne. HT = 1090 V , Frep = 10 Hz.

       visualisation de PiC et Prc dans le hall D1 et salle de controle sur oscillo : ok

--> pas trouvé comment visualiser les signaux RF avec interface Taurus

visualisation Pis et Prs

--> sauvegarde signaux RF sur clef usb

bilan : 3h de RF dans la canon et la section LIL, vide correct

test longue durée demain

17h15 arret

 

 

 

 

  24   Wed Aug 17 11:42:41 2022 MO HMUnder ProcessInfoPrise de donnees test RF modulateur longue durée (journée) 

but : test fonctionnement modulateur et RF sur la journée

8h55 démarrage modulateur et refroidissement

10h00 démarrage RF ( HV=1090V )

visualisation signaux RF avec taurus plot : Pic Prc Pis Prs et photodiode

 -->  taurus plot er/sy/rac.17-elr.01-rdp.03/waveform_cha er/sy/rac.17-elr.01-rdp.03/waveform_chb  er/sy/rac.17-elr.01-rdp.01/waveform_cha er/sy/rac.17-elr.01-rdp.01/waveform er/sy/rac.17-elr.01-rdp.04/waveform_cha er/sy/rac.17-elr.01-rdp.04/waveform_chb

13h00 RF en fonctionnement depuis 10h00 ( pas d'interlocks )

14h00 RF ok - pas d'interlock modulateur

15h00 RF ok - pas d'interlock modulateur

16h00 RF ok - pas d'interlock modulateur

17h00 RF ok - pas d'interlock modulateur

17h15 arret

bilan : aucun interlock modulateur de 10h a 17h, tres peu de claquages , vide bon (1e-9 mbar), regulation temperature canon et section ok.

 

 

Attachment 1: Screenshot_from_2022-08-18_15-56-17.png
Screenshot_from_2022-08-18_15-56-17.png
  26   Mon Sep 19 15:56:28 2022 IC, VK, VI, VC, JH, HG, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #1 

Status slides presented by Iryna available on indico at https://indico.ijclab.in2p3.fr/event/8749/

The beam parameters required for a good injection in the ring were discussed.

The following required parameters were identified:

- At least 80pC on TL/DG/ICT.01

- At least 20pC on TL/DG/ICT.02

- Energy in the TL must be checked and must be 50 MeV.

- Beam position must be checked on TL/DG/SST.01, TL/DG/SST.02 and TL/DG/SST.03 and be within the acceptance (see tickbox acceptance on IHM_SST).

- Beam size must be measured on TL/DG/SST.03 and be < 2mm FWHM

- Beam recipes for the LI and for the TL must be saved.

- Health check must be checked (no red entry).

- Beam centered on the last quadrupole of the transfer line.

ACTION: Nicolas will create an interface that displays as many as possible of the required parameters.

Suggestion by Viktor: check phase noise at the gun entrance: there might a phase noise issue.

=> Vincent (VC) is going to do that with Viktor (VI) during RF studies on 26th September

Planning for the coming week:

- Wednesday: Slava (+Iryna after the CoDEC)

- Thursday: Nicolas + all

- Friday: AG Pole. Alexandre and Vincent plus Slava

Current objectives:

1) Re-establish beam transport to ring

2) Scan in time the septum

3) Scan in voltage the septum

4) Adjust timing of kicker by looking at induced noise on ICTs

5) Scan in time the kicker

6) Scan in voltage the kicker

7) Transport further in the ring by playing with correctors

Note: When possible Alexandre will test his feedback code.

 

  27   Mon Sep 19 16:29:06 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees Ring objectives 

This entry is to be updated as the work progresses.

1) Re-establish beam transport to ring

2) Scan in time the septum

see script git/panneaux/Synchro/scan_septum.py

3) Scan in voltage the septum

4) Adjust timing of kicker by looking at induced noise on ICTs

5) Scan in time the kicker

git/panneaux/Synchro/scan_kicker.py

6) Scan in voltage the kicker

7) Transport further in the ring by playing with correctors

Note: When possible Alexandre will test his feedback code.

  29   Mon Sep 26 09:39:15 2022 VK, IC, AM, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #2 

Slides are at https://indico.ijclab.in2p3.fr/event/8750/

- There is a difference in BPM numbering in Tango and MML => we should stick to Tango names.

- Beam was very unstable during the past week

- Difficulties to have full current on RI-C1/BPM.01. Signal drops already significanty before RI-C2/BPM.06

- Fluctuations may have been observed on the RF Gun power => to be confirmed

- Fluctuations have been observed on the kicker => may be due to energy jitter

To do:

- Monitor incident power on RF Gun

- Re-establish transport

- Try to inject with optimised TL transport

- Compare single pass and TbT BPM signals

- Check energy jitter in TL/BPM.02 and TL/SST.02

- Scan correctors to increase current on RI-C1/BPM.01 and RI-C2/BPM.06

- Start align beam in quadrupoles

  30   Mon Sep 26 10:21:20 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: Ring objectives 

(1),  (2), (4) and (5) from last week have been done other items in progress.

New to do list:

(0) Re-establish beam transport to ring

(1) Monitor incident power on RF Gun

(2) Check energy jitter in TL/BPM.02 and TL/SST.02

(3) Use TL optimised transport when available

(4) Compare single pass and TbT BPM signals

(5) Test Alexandre's feedback code.

(6) Scan correctors to increase current on RI-C1/BPM.01 and RI-C2/BPM.06

(7) Start align beam in quadrupoles
 

Quote:

This entry is to be updated as the work progresses.

1) Re-establish beam transport to ring

2) Scan in time the septum

see script git/panneaux/Synchro/scan_septum.py

3) Scan in voltage the septum

4) Adjust timing of kicker by looking at induced noise on ICTs

5) Scan in time the kicker

git/panneaux/Synchro/scan_kicker.py

6) Scan in voltage the kicker

7) Transport further in the ring by playing with correctors

Note: When possible Alexandre will test his feedback code.

 

  34   Wed Oct 5 09:51:12 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: RE: Ring objectives 

New to do list:

(0) Re-establish beam transport to ring

(0bis) Check energy jitter in TL/BPM.02 and TL/SST.02

(1) Try to merge TL optimised transport with ring injection transport => record beam size on TL/SST3 and position on TL/BPM.03 and TL/BPM.04 for current ring transport

(2) Reduce betatron oscillations

(3) Measure and correct orbits

(4) Measure Tune

(5) BBA

(6) Improve charge transport at injection

(7) Start MRSV

 

 

Quote:

(1),  (2), (4) and (5) from last week have been done other items in progress.

New to do list:

(0) Re-establish beam transport to ring

(1) Monitor incident power on RF Gun

(2) Check energy jitter in TL/BPM.02 and TL/SST.02

(3) Use TL optimised transport when available

(4) Compare single pass and TbT BPM signals

(5) Test Alexandre's feedback code.

(6) Scan correctors to increase current on RI-C1/BPM.01 and RI-C2/BPM.06

(7) Start align beam in quadrupoles
 

Quote:

This entry is to be updated as the work progresses.

1) Re-establish beam transport to ring

2) Scan in time the septum

see script git/panneaux/Synchro/scan_septum.py

3) Scan in voltage the septum

4) Adjust timing of kicker by looking at induced noise on ICTs

5) Scan in time the kicker

git/panneaux/Synchro/scan_kicker.py

6) Scan in voltage the kicker

7) Transport further in the ring by playing with correctors

Note: When possible Alexandre will test his feedback code.

 

 

  36   Mon Oct 10 10:37:43 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: RE: RE: Ring objectives 

To do list:

(0) Re-establish beam transport to ring

(0bis) Check energy jitter in TL/BPM.02 and TL/SST.02

(0ter) Measure emittance on TL/SST.03

(1) Try to merge TL optimised transport with ring injection transport => record beam size on TL/SST3 and position on TL/BPM.03 and TL/BPM.04 for current ring transport

définir avec précision les caractéristiques du faisceau en fin de TL pour pouvoir passer au commissioning de l'anneau (et fournir les diagnostics nécessaires pour contrôler ces "bons" réglages de la TL, et savoir qui en est en charge de quoi)

(2) Improve charge transport at injection

(3) Measure and correct orbits

programmer des mesures sur l'anneau permettant d'établir des connexions entre le modèle d'Iryna et l'état actuel de l'anneau (il y a évidemment la mesure des nombres d'ondes

(4) Start MRSV

(5) Measure Tune

 

 

Quote:

New to do list:

(0) Re-establish beam transport to ring

(0bis) Check energy jitter in TL/BPM.02 and TL/SST.02

(1) Try to merge TL optimised transport with ring injection transport => record beam size on TL/SST3 and position on TL/BPM.03 and TL/BPM.04 for current ring transport

(2) Reduce betatron oscillations

(3) Measure and correct orbits

(4) Measure Tune

(5) BBA

(6) Improve charge transport at injection

(7) Start MRSV

 

 

Quote:

(1),  (2), (4) and (5) from last week have been done other items in progress.

New to do list:

(0) Re-establish beam transport to ring

(1) Monitor incident power on RF Gun

(2) Check energy jitter in TL/BPM.02 and TL/SST.02

(3) Use TL optimised transport when available

(4) Compare single pass and TbT BPM signals

(5) Test Alexandre's feedback code.

(6) Scan correctors to increase current on RI-C1/BPM.01 and RI-C2/BPM.06

(7) Start align beam in quadrupoles
 

Quote:

This entry is to be updated as the work progresses.

1) Re-establish beam transport to ring

2) Scan in time the septum

see script git/panneaux/Synchro/scan_septum.py

3) Scan in voltage the septum

4) Adjust timing of kicker by looking at induced noise on ICTs

5) Scan in time the kicker

git/panneaux/Synchro/scan_kicker.py

6) Scan in voltage the kicker

7) Transport further in the ring by playing with correctors

Note: When possible Alexandre will test his feedback code.

 

 

 

  45   Tue Jan 24 10:14:20 2023 NDNew SolutionInfoPrise de donnees Notes from ThomX Physics meeting 

Present: IC, VK, VM, VC, SC, MEK, KD, MJ, HG, ND, MO (sous réserve d'oublis)

Visio: CB

L'ordre du jour et les transparents présentés en réunion sont sur: https://indico.ijclab.in2p3.fr/event/9205/

Actions à faire:

- Vincent a montré que le laser met ~1h avant de se stabiliser en phase par rapport au signal de synchronisation 3GHz. Il faut donc démarrer le laser (START_AMPLI) dès la mise en chauffe du modulateur.

- Mise en place d'un système de retroaction en salle laser (Vincent)

- Campagne de mesure détaillée du klystron prévu pour la semaine commeçant le 30 janvier.

- Pour trouver la phase d'énergie maximale, il faut calculer le déphasage Canon-Laser PC par rapport à la chute de charge lors du balayage en phase. Christelle va circuler la valeur recommandée.

- Accorder la section RF linac à l'energie maximale (Mohammed?)

- Refaire des mesures de courant d'obscurité (Vincent + Viktor M. + Nicolas)

- Circuler les sorties Astra en fin de linac à 100pC pour permettre des simulations de la propagation du faisceau dans la TL (Christelle)

- Il faut toujours faire fonctionner la ligne de transfert avec le même courant dans les aimants. Slava va circuler la valeur à utiliser.

- La maille LI+TL actuelle a été calculée pour 1nC. Il faut terminer définir la maille LI+TL à 100pC et vérifier sa validité (Christelle + Sophie)

- Circuler la maille LI+TL et des images donnant les taille de faisceau attendues sur chaque écran SST.

- Améliorer la stabilité (charge, énergie, position) de la ligne de transfert, surtout dans sa partie dispersive.

- Il faut calibrer les écrans SST (Nicolas)

 

 

  46   Thu Feb 9 12:16:41 2023 NDNew SolutionInfoPrise de donnees Verification variables pour l'anneau 

L'IHM de verification des variables pour l'anneau a ete mis a jour.

Il est accessible dans plateforme IHM section "Outils", éeme collone, "eme ligne: "Check vars for RING".

Utilisation de l 'IHM (voir copie d'ecran ci-joint):

-Chaque ligne donne une valeur et (lorsque c'est pertinent) sa std ainsi que le besoinde l'anneau sur cette variable.

- Si la variable est dans la plage acceptable, la diode devient verte.

Pour inclure l'image dans le e-log cliauer sur "Take screenshot". L'image est sauvee dans  /data/shared/Commissioning_tools/Mesure/today/

 

 

 

Attachment 1: ring_vars_2023_02_09_12_15.png
ring_vars_2023_02_09_12_15.png
  48   Fri Feb 24 10:34:58 2023 NDNew SolutionInfoPrise de donnees RE: Notes from ThomX Physics meeting 

Présent: VK, SC, KD, MJ, HG, ND

Présentation par Marie. Cf indico https://indico.ijclab.in2p3.fr/event/9242/

Demo par Slava.

Prochaine réunion le 24 mars.

 

 

Quote:

Present: IC, VK, VM, VC, SC, MEK, KD, MJ, MO (sous réserve d'oublis)

Visio: CB

L'ordre du jour et les transparents présentés en réunion sont sur: https://indico.ijclab.in2p3.fr/event/9205/

Actions à faire:

- Vincent a montré que le laser met ~1h avant de se stabiliser en phase par rapport au signal de synchronisation 3GHz. Il faut donc démarrer le laser (START_AMPLI) dès la mise en chauffe du modulateur.

- Mise en place d'un système de retroaction en salle laser (Vincent)

- Campagne de mesure détaillée du klystron prévu pour la semaine commeçant le 30 janvier.

- Pour trouver la phase d'énergie maximale, il faut calculer le déphasage Canon-Laser PC par rapport à la chute de charge lors du balayage en phase. Christelle va circuler la valeur recommandée.

- Accorder la section RF linac à l'energie maximale (Mohammed?)

- Refaire des mesures de courant d'obscurité (Vincent + Viktor M. + Nicolas)

- Circuler les sorties Astra en fin de linac à 100pC pour permettre des simulations de la propagation du faisceau dans la TL (Christelle)

- Il faut toujours faire fonctionner la ligne de transfert avec le même courant dans les aimants. Slava va circuler la valeur à utiliser.

- La maille LI+TL actuelle a été calculée pour 1nC. Il faut terminer définir la maille LI+TL à 100pC et vérifier sa validité (Christelle + Sophie)

- Circuler la maille LI+TL et des images donnant les taille de faisceau attendues sur chaque écran SST.

- Améliorer la stabilité (charge, énergie, position) de la ligne de transfert, surtout dans sa partie dispersive.

- Il faut calibrer les écrans SST (Nicolas)

 

 

 

  52   Fri Mar 31 10:37:18 2023 KDUnder ProcessOtherPrise de donnees mesures et shifts Linac 

Réunion 31/03

Prochaines mesures à faire :

Canon :

- Scan charge/Phase

- Scan énergie/Phase

 

Linac :

- investiguer le champ B des quads VS théorie (comparaison mesures mag et MML)

- remesurer quelques points (taille faisceau) de la TL et comparer avec la propagation.

 

 

 

 

  55   Fri Jun 9 19:57:14 2023 KDNew SolutionInfoPrise de donnees Mise en place Ligne X 

Aujourd'hui (09/06/2023), la Table1 de la ligne X est mise en position faisceau. Je l'ai approximativement alignée dans le faisceau. 

Le cablage du pico1 (XLI/OP/TMD.01) est le suivant :

- ch1: diode écran fluo (XLI/OP/TMD.01/I1)

- ch2: non connecté ==> bouchon (XLI/OP/TMD.01/I2)

- ch3: 1e diode détecteur à diode (XLI/OP/TMD.01/I3)

- ch4: 2e diode détecteur à diode (XLI/OP/TMD.01/I4)

La valeur des attributs ci-dessus est en pA,

le temps d'intégration est 50ms (ITM en 100us ==> 500 = 50ms),

le gain est réglé à 1 (50pC) et 0 (2nC) pour les ch1/2 et ch3/4 respectivement (cf P.J.).

La fenetre jive du pico est en P.J.

attention au polling des attribut qui est sur 1s.

Attention les pico ne sont pas trigger pour le moment !

Tout est pret pour chercher les X.

 

Attachment 1: gain_pico.png
gain_pico.png
Attachment 2: fenetre_pico.png
fenetre_pico.png
  Draft   Mon Jun 12 09:51:00 2023 IC, VK, VM, LS, JH, MB, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting 

Comments:

* There are strong evidences that part of the frequency problem comes from mechanical issue

* Fring field of the dipoles seems to be longer than anticipated. This could lead to shortening of the orbit.

Decisions:

* Have a meeting with mechanics to understand what are the issues and what are the possibilities to address the ring length issue.

* CFP is welcome to operate *remotely* during ring operations. A script will be made to monitor the X-ray flux during operations.

* Wednesday, Thursday and Friday : CFP can access until 11h.

* Investigate the operation of the BLM.

* Tuesday afternoon Nicolas and Sophie will investigate the feedback issue (phase or attenuator to stabilize TL/BPM.02/SpX).

Plan for this week: prepare the beam to test the X-ray production.

 

 

  58   Thu Jun 22 07:41:18 2023 KDNew SolutionInfoPrise de donnees RE: Mise en place Ligne X 

hier et ce matin la ligne a été re-réglé.

La table optique a été déplacé d'environ 1cm vers le canon pour s'aligner un peu mieu à la sortie CFP.

L'écran fluo a été inséré dans le faisceau lundi. Seul la voie 1 du pico sera donc utile pour la détection.

Le pico a été reréglé avec les paramètres suivants :

le temps d'intégration est 500ms (ITM en 100us ==> 5000 = 500ms),

le gain est réglé à 4 (200pC) et 0 (2nC) pour les ch1/2 et ch3/4 respectivement.

le polling est de 100ms

le mode Half est retiré ce qui peu engendrer du bruit d'une mesure sur 2 (1 acquistion par ADC) mais augmente le nombre d'acquisition par seconde.

 

Quote:

Aujourd'hui (09/06/2023), la Table1 de la ligne X est mise en position faisceau. Je l'ai approximativement alignée dans le faisceau. 

Le cablage du pico1 (XLI/OP/TMD.01) est le suivant :

- ch1: diode écran fluo (XLI/OP/TMD.01/I1)

- ch2: non connecté ==> bouchon (XLI/OP/TMD.01/I2)

- ch3: 1e diode détecteur à diode (XLI/OP/TMD.01/I3)

- ch4: 2e diode détecteur à diode (XLI/OP/TMD.01/I4)

La valeur des attributs ci-dessus est en pA,

le temps d'intégration est 50ms (ITM en 100us ==> 500 = 50ms),

le gain est réglé à 1 (50pC) et 0 (2nC) pour les ch1/2 et ch3/4 respectivement (cf P.J.).

La fenetre jive du pico est en P.J.

attention au polling des attribut qui est sur 1s.

Attention les pico ne sont pas trigger pour le moment !

Tout est pret pour chercher les X.

 

 

  Draft   Tue Dec 1 14:35:01 2020 Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020      

Laser :

Camera : mettre le temps d'exposition à 0.2 secondes