HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Notes concernant la preparation du Commissionning, Page 3 of 3  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:57:33 2021; tests redpitaya 3 RDP.03_voie1.pngRDP.03_voie2.png
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021; tests redpitaya 4 RDP.04_voie1.pngRDP.04_voie2.png
Entry   Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021; Tests IHM RF 
Entry   HM MO; redemarrage 17 aout 2022 
Entry   MO HM; test RF modulateur longue durée (journée) Screenshot_from_2022-08-18_15-56-17.png
Entry   IC, VK, VI, VC, JH, HG, ND; Summary of the ring commissioning meeting #1 
Entry   IC, VK, VI, VC, JH, HG, ND ; Ring objectives 
Entry   VK, IC, AM, ND; Summary of the ring commissioning meeting #2 
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: Ring objectives 
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: Ring objectives 
    Reply   IC, VK, VI, VC, JH, HG, ND ; RE: RE: RE: Ring objectives 
Entry   ND; Notes from ThomX Physics meeting 
Entry   ND; Verification variables pour l'anneau ring_vars_2023_02_09_12_15.png
    Reply   ND; RE: Notes from ThomX Physics meeting 
Entry   KD; mesures et shifts Linac 
Entry   KD; Mise en place Ligne X gain_pico.pngfenetre_pico.png
Entry   IC, VK, VM, LS, JH, MB, ND; Summary of the ring commissioning meeting 
    Reply   KD; RE: Mise en place Ligne X 
Entry   Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020;  
ELOG V3.1.4-395e101