  19   Thu Mar 4 16:57:46 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:57:33 2021Under ProcessShift summaryPrise de donnees tests redpitaya 3 Tests des redpitayas 3 voie 1 (Pi canon)
et voie 2 (Pr canon)
 RDP.03_voie1.pngRDP.03_voie2.png 
  20   Thu Mar 4 16:59:43 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021Under ProcessShift summaryPrise de donnees tests redpitaya 4 Tests des redpitaya 4 voie 1 (Photodiode)
et voie 2 (Q section)
 RDP.04_voie1.pngRDP.04_voie2.png 
  21   Thu Mar 4 17:07:32 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021Under ProcessShift summaryPrise de donnees Tests IHM RF Les tests se sont bien déroulés,
on observe bien les signaux correspondants
au redpitayas demandés.
  
  23   Wed Aug 17 09:48:31 2022 HM MOUnder ProcessInfoPrise de donnees redemarrage 17 aout 2022 9h30 redemarrage HM MO

- niveau 1 verifié (circuit
eau, air comprimé, etat modulateur
  
  24   Wed Aug 17 11:42:41 2022 MO HMUnder ProcessInfoPrise de donnees test RF modulateur longue durée (journée) but : test fonctionnement modulateur et
RF sur la journée

8h55 démarrage modulateur
 Screenshot_from_2022-08-18_15-56-17.png 
  26   Mon Sep 19 15:56:28 2022 IC, VK, VI, VC, JH, HG, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #1 Status slides presented by Iryna available
on indico at https://indico.ijclab.in2p3.fr/event/8749/

The beam parameters required for
  
  27   Mon Sep 19 16:29:06 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees Ring objectives This entry is to be updated as the work
progresses.

1) Re-establish beam transport
  
  29   Mon Sep 26 09:39:15 2022 VK, IC, AM, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting #2 Slides are at https://indico.ijclab.in2p3.fr/event/8750/

- There is a difference in BPM
numbering in Tango and MML => we should
  
  30   Mon Sep 26 10:21:20 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: Ring objectives (1),  (2), (4) and (5) from last week
have been done other items in progress.

New to do list:
  
  34   Wed Oct 5 09:51:12 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: RE: Ring objectives New to do list:

(0) Re-establish beam transport
to ring
  
  36   Mon Oct 10 10:37:43 2022 IC, VK, VI, VC, JH, HG, ND New SolutionShift summaryPrise de donnees RE: RE: RE: Ring objectives To do list:

(0) Re-establish beam transport
to ring
  
  45   Tue Jan 24 10:14:20 2023 NDNew SolutionInfoPrise de donnees Notes from ThomX Physics meeting Present: IC, VK, VM, VC, SC, MEK, KD, MJ,
HG, ND, MO (sous réserve d'oublis)

Visio: CB
  
  46   Thu Feb 9 12:16:41 2023 NDNew SolutionInfoPrise de donnees Verification variables pour l'anneau L'IHM de verification des variables
pour l'anneau a ete mis a jour.

Il est accessible dans plateforme
 ring_vars_2023_02_09_12_15.png 
  48   Fri Feb 24 10:34:58 2023 NDNew SolutionInfoPrise de donnees RE: Notes from ThomX Physics meeting Présent: VK, SC, KD, MJ, HG, ND

Présentation par Marie.
Cf indico https://indico.ijclab.in2p3.fr/event/9242/
  
  52   Fri Mar 31 10:37:18 2023 KDUnder ProcessOtherPrise de donnees mesures et shifts Linac Réunion 31/03

Prochaines mesures à faire
:
  
  55   Fri Jun 9 19:57:14 2023 KDNew SolutionInfoPrise de donnees Mise en place Ligne X Aujourd'hui (09/06/2023), la Table1
de la ligne X est mise en position faisceau.
Je l'ai approximativement alignée
 gain_pico.pngfenetre_pico.png 
  Draft   Mon Jun 12 09:51:00 2023 IC, VK, VM, LS, JH, MB, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting Comments:

* There are strong evidences that
part of the frequency problem comes from
  
  58   Thu Jun 22 07:41:18 2023 KDNew SolutionInfoPrise de donnees RE: Mise en place Ligne X hier et ce matin la ligne a été
re-réglé.

La table optique a été
  
  Draft   Tue Dec 1 14:35:01 2020 Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020      Laser :

Camera : mettre le temps d'exposition
à 0.2 secondes
  