ID Date Author Status Type Categorydown Important Subject Icon Text Attachments
  25   Fri Sep 2 08:51:46 2022 MO Shift summaryetc démarrage 8h35  mise sous tension: PSS, LB9000,
modulateur, chillers
  
  6   Thu Dec 3 10:58:11 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020FixedInfodocs demarrage a blanc 3 dec 2020 Bilan démarrage à blanc 3
dec 2020 : (H Monard, S Cavalier)

but : verification etat IHM pour
  
  7   Thu Dec 3 13:45:13 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020FixedInfodocs signal photodiode laser    photodiode-laser2.png 
  28   Fri Sep 23 09:44:14 2022 IC, VK, AM, VC, NDUnder ProcessInfodocs Beam requirements for the ring The following parameters are required for
ring operations:

- At least 50pC on TL/DG/ICT.01
  
  31   Tue Sep 27 17:45:54 2022 NDUnder ProcessInfodocs RE: Beam requirements for the ring An IHM to check some of these parameters
has been created (git/panneaux/StatusInfoIHM_ring_vars.py)
and added to Plateforme_IHM...
  
  32   Wed Sep 28 09:56:44 2022 ND, ICReference SolutionInfodocs Steerers and BPM map for the ring See attached files.  BPM_ring.pngBPM_ring.pptx 
  39   Mon Dec 5 10:05:11 2022 VK, IC, VM, JH, KD, NDNew SolutionInfoanalyse Summary of the ring commissioning meeting The ring orbit has been re-established
despite some difficulties after the shutdown.

The ring cavity has been started.
  
  41   Tue Dec 6 00:15:55 2022 NDNew SolutionInfoanalyse RE: Summary of the ring commissioning meeting Regarding the remote control of the RF
synthetizer: it can only be controlled via
GPIB and RS-232.
  
  49   Mon Mar 13 09:39:39 2023 IC, VM, SC, JH, VC, NDNew SolutionShift summaryanalyse Summary of the ring commissioning meeting Excitation (betatron oscillation) on the
beam observed by exciting it with the extraction
kicker => initial measures of the tune.
 data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png 
  53   Mon May 22 10:05:30 2023 IC, VK, LS, JH, NDNew SolutionShift summaryanalyse Summary of the ring commissioning meeting === Summary of last week:

- Frequency was reduced to 500.0202MHz
but the beam stayed only for 100s of turns
  
  54   Tue May 30 10:12:30 2023 VK, IC, JH, VM, LS, MB, NDNew SolutionInfoanalyse Summary of the ring commissioning meeting Main studies:

- Measure bucket width in phase
on Thursday at 500.02MHz => no storage
  
  1   Tue Nov 19 11:16:39 2019 Entered by Hayg Guler from 134.158.195.145 on Tue Nov 19 11:16:25 2019Under ProcessShift summaryPrise de donnees   Salle de controle :


installer Xlib pour tout
le monde
mettre les environnements
  
  2   Tue Jul 7 14:25:15 2020 Entered by bruni from 134.158.195.142 on Tue Jul 7 14:24:55 2020Under ProcessShift summaryPrise de donnees test régulation températures canon/section Ouverture des chillers et du frigo sur
place.

Ouverture de l'IHM plateforme
 screenshotIHM_RF.png 
  Draft   Wed Jul 8 14:33:04 2020 Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020Under ProcessShift summaryPrise de donnees test moteur solénoide en charge Prise de mesure relative entre les deux
bobines : 18.7cm avec les alimentations éteintes
mais du refroidissement.
  
  8   Thu Dec 3 13:50:27 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020FixedInfoPrise de donnees signal photodiode 03-12-20    plot.pdf 
  9   Thu Dec 3 15:17:04 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020FixedInfoPrise de donnees   Signaux RF - REdPitaya 03-12-20

Photodiode laser - RP.04 A

QS RP.04 B
  
  10   Thu Dec 3 15:26:22 2020 Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020FixedInfoPrise de donnees   signaux photodiode PrC Qs test avec generateur
impulsion ! 2 V , 3 µs (bleu ciel) 
et signal avec rampe, 1V (moire), photodiode
 photodiode-Prc_Qs.pdf 
  16   Thu Mar 4 16:36:12 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:35:53 2021Under ProcessShift summaryPrise de donnees Tests IHM RF  De nouveaux tests ont été
fait sur l'IHM RF amélioré
(M. Omeich, H. Guler, S. Chance, JN. Cayla)
 IHM_RF.png 
  17   Thu Mar 4 16:46:04 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:45:48 2021Under ProcessShift summaryPrise de donnees   Test du repitaya 1 voie 1 (Pi section)
et 2 (Pr section)

 
 RDP.01_voie1.pngRDP.01_voie2.png 
  18   Thu Mar 4 16:56:19 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:56:07 2021Under ProcessShift summaryPrise de donnees redpitaya 2 Tests du redpitaya 2 voie 1 (Boucle section)
voie 2 est libre
 RDP.02_voie1.png 