  1   Tue Nov 19 11:16:39 2019 Entered by Hayg Guler from 134.158.195.145 on Tue Nov 19 11:16:25 2019Under ProcessShift summaryPrise de donnees   Salle de controle :


installer Xlib pour tout
le monde
mettre les environnements
  
  2   Tue Jul 7 14:25:15 2020 Entered by bruni from 134.158.195.142 on Tue Jul 7 14:24:55 2020Under ProcessShift summaryPrise de donnees test régulation températures canon/section Ouverture des chillers et du frigo sur
place.

Ouverture de l'IHM plateforme
 screenshotIHM_RF.png 
  Draft   Wed Jul 8 14:33:04 2020 Entered by bruni from 134.158.195.142 on Wed Jul 8 14:32:48 2020Under ProcessShift summaryPrise de donnees test moteur solénoide en charge Prise de mesure relative entre les deux
bobines : 18.7cm avec les alimentations éteintes
mais du refroidissement.
  
  4   Thu Jul 16 09:50:37 2020 Entered by Sophie Chance from 134.158.195.143 on Thu Jul 16 09:50:21 2020Under ProcessInfoetc demarrage à blanc debut du démarrage à blanc
9h45. Démarrage prévu par étape.
  
  12   Wed Dec 9 14:33:08 2020 HaygUnder ProcessInfoetc RE:  Pour info :


client 1 ne fonctionne
pas encore. Il n'a pas été
  
  14   Wed Mar 3 10:49:14 2021 HaygUnder ProcessInfoproblemes WC tests TANGO 
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean


 

Dans les variables MeanStd :


Charge 1 :

er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean 


Charge
  
  15   Wed Mar 3 11:30:46 2021 HaygUnder ProcessInfoproblemes RE: WC tests TANGO  




 Screenshot_from_2021-03-03_11-29-57.png 
  16   Thu Mar 4 16:36:12 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:35:53 2021Under ProcessShift summaryPrise de donnees Tests IHM RF  De nouveaux tests ont été
fait sur l'IHM RF amélioré
(M. Omeich, H. Guler, S. Chance, JN. Cayla)
 IHM_RF.png 
  17   Thu Mar 4 16:46:04 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:45:48 2021Under ProcessShift summaryPrise de donnees   Test du repitaya 1 voie 1 (Pi section)
et 2 (Pr section)

 
 RDP.01_voie1.pngRDP.01_voie2.png 
  18   Thu Mar 4 16:56:19 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:56:07 2021Under ProcessShift summaryPrise de donnees redpitaya 2 Tests du redpitaya 2 voie 1 (Boucle section)
voie 2 est libre
 RDP.02_voie1.png 
  19   Thu Mar 4 16:57:46 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:57:33 2021Under ProcessShift summaryPrise de donnees tests redpitaya 3 Tests des redpitayas 3 voie 1 (Pi canon)
et voie 2 (Pr canon)
 RDP.03_voie1.pngRDP.03_voie2.png 
  20   Thu Mar 4 16:59:43 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 16:59:30 2021Under ProcessShift summaryPrise de donnees tests redpitaya 4 Tests des redpitaya 4 voie 1 (Photodiode)
et voie 2 (Q section)
 RDP.04_voie1.pngRDP.04_voie2.png 
  21   Thu Mar 4 17:07:32 2021 Entered by Sophie Chance from 134.158.195.141 on Thu Mar 4 17:07:19 2021Under ProcessShift summaryPrise de donnees Tests IHM RF Les tests se sont bien déroulés,
on observe bien les signaux correspondants
au redpitayas demandés.
  
  23   Wed Aug 17 09:48:31 2022 HM MOUnder ProcessInfoPrise de donnees redemarrage 17 aout 2022 9h30 redemarrage HM MO

- niveau 1 verifié (circuit
eau, air comprimé, etat modulateur
  
  24   Wed Aug 17 11:42:41 2022 MO HMUnder ProcessInfoPrise de donnees test RF modulateur longue durée (journée) but : test fonctionnement modulateur et
RF sur la journée

8h55 démarrage modulateur
 Screenshot_from_2022-08-18_15-56-17.png 
  28   Fri Sep 23 09:44:14 2022 IC, VK, AM, VC, NDUnder ProcessInfodocs Beam requirements for the ring The following parameters are required for
ring operations:

- At least 50pC on TL/DG/ICT.01
  
  31   Tue Sep 27 17:45:54 2022 NDUnder ProcessInfodocs RE: Beam requirements for the ring An IHM to check some of these parameters
has been created (git/panneaux/StatusInfoIHM_ring_vars.py)
and added to Plateforme_IHM...
  
  35   Mon Oct 10 10:04:49 2022 VK, IC, VI, JH, NDUnder ProcessShift summaryresumes Summary of the ring commissioning meeting #4 - 300 turns achieved.

- Probably more but limited by
libera cut-off frequency.
  
  52   Fri Mar 31 10:37:18 2023 KDUnder ProcessOtherPrise de donnees mesures et shifts Linac Réunion 31/03

Prochaines mesures à faire
:
  
  32   Wed Sep 28 09:56:44 2022 ND, ICReference SolutionInfodocs Steerers and BPM map for the ring See attached files.  BPM_ring.pngBPM_ring.pptx 