41
|
Thu Feb 10 15:08:41 2022 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | ThomX igloo | shutter base plate, L-shape arm and housing frame | This afternoon with Yann:
- we changed the shutter base plate
position to center the beam axis with the |
|
|
39
|
Wed Jan 19 18:32:47 2022 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | new power supplies connexions | this afternoon with Viktor, we redid all
the power supplies connexions.
4x cables are now connected to |
|
|
8
|
Wed Nov 27 09:48:44 2019 |
Ronic Chiche | Fixed | info | cabling | Optical room | new circuit breaker for the UPS | A new circuit breaker has been installed
today before the UPS to fix the shutdown
issues we observed some months ago when too |
|
|
24
|
Tue Oct 19 10:43:42 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Vacuum pressure to open valves | The pressure for the mirror vacuum chambers
needs to be ~ few 10^-9 mbar for the valves
to be open to the electron ring (the rest |
|
|
26
|
Tue Oct 19 12:46:40 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Vacuum pressure to open valves | Reminding: the opening of the valves is
the responsibility of the vacuum group only.
|
|
|
18
|
Fri Oct 15 14:21:03 2021 |
Manar Amer | Fixed | report | vacuum | cabling | software | ThomX igloo | Vacuum in the mirror chambers |
The electron ring has been vacuum
inside it, but the valves connecting it to
the two mirror chambers are closed. Before |
   |
|
19
|
Fri Oct 15 14:34:34 2021 |
Manar Amer | Fixed | report | vacuum | cabling | software | ThomX igloo | Vacuum in the mirror chambers | the ionic pumps have been also connected
this morning but not powered on, yet.
the vacuum group is waiting for a |
|
|
50
|
Wed Dec 20 09:35:36 2023 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | UPS installation and commissioning | Jean-Noel Cayla installed several days
ago a Eaton 9PX 11kVA UPS inside the Igloo,
outside of the ThomX bunker |
|
|
51
|
Wed Dec 20 10:17:19 2023 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | UPS installation and commissioning | finally I installed the OneFive laser,
the Smaract motors of the laser and the Arduino
Peltier controller of the laser on the UPS |
|
|
52
|
Wed Dec 20 12:59:00 2023 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | UPS installation and commissioning | I was able to lock back the FP-cavity.
at one moment, during the alignment
optmization process of the infection mirrors |
|
|
12
|
Mon May 17 11:53:35 2021 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | ThomX housing roof opening | Today, Yannick Petrilli removed 5 concrete
bars (5-9) from the ThomX housing roof in
order to let the optical table be installed |
 |
|
3
|
Fri Nov 15 14:51:54 2019 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | Optical room | Smaract Controllers setting | Scheme of cabling of the SmarAct motors
controllers for acting on Frep and CEP. |
|
|
45
|
Thu Aug 25 16:43:01 2022 |
Ronic Chiche | Fixed | info | detectors and electronics | software | ThomX igloo | Scope and Desktop computer removing | this afternoon, because of the test on
the electron beam drive in the ring in the
next days, |
|
|
47
|
Wed Feb 8 11:02:38 2023 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | Safety patrol instructions | If one needs to work with 3rd stage on
the laser amplifier, one needs to make the
safety patrol inspection before closing the |
|
|
48
|
Wed Feb 8 13:48:33 2023 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | Safety patrol instructions | after finishing the controlled intervention,
you just have to exit the bunker with the
2 keys and place them back in their location |
|
|
31
|
Fri Oct 22 17:36:05 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Pressure On mirror Chambers Plot | A plot showing the descend of the vacuum
in the mirror chambers (data to plot it obtained
yesterday evening) |
|
|
32
|
Tue Oct 26 09:20:01 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Pressure On mirror Chambers Plot | During the weekend 23-24th of October,
the lab and ThomX suffered a power breakdown.
All the pumping systems had to restart. |
|
|
33
|
Wed Oct 27 09:34:04 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Pressure On mirror Chambers Plot | Pressure is 1.4e-9 and 2.6e-9 mbar this
morning.
|
|
|
30
|
Thu Oct 21 18:31:11 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Pressure On mirror Chambers Leckage Test | Leakage test done in the afternoon.
The method :
an atomic mass spectrometer |
 |
|
25
|
Tue Oct 19 11:06:03 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Pressure On mirror Chambers |
At
10h45 in the morning, the pressure on the |
|