HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of installation, including shipping and de-installation of test setups.  Not logged in ELOG logo
Entry   Pressure On mirror Chambers Plot, posted by Manar Amer at ThomX igloo about vacuum PressureOverTime.png
    Reply   Pressure On mirror Chambers Plot, posted by Manar Amer at ThomX igloo about vacuum 
       Reply   Pressure On mirror Chambers Plot, posted by Manar Amer at ThomX igloo about vacuum 
Message ID: 33     Entry time: Wed Oct 27 09:34:04 2021     In reply to: 32
 Author: Manar Amer 
 Status: Fixed 
 Type: info 
 Category: vacuum 
 Location: ThomX igloo 
 Title: Pressure On mirror Chambers Plot 

Pressure is 1.4e-9 and 2.6e-9 mbar this morning.

Manar Amer wrote:

During the weekend 23-24th of October, the lab and ThomX suffered a power breakdown.
All the pumping systems had to restart.

as a consequence, the pressure on Monday 25th morning was 4.3e-9 and 4.6e-9 mbar in the left and right vessels.

this morning, the Tuesday 26th, the pressure is 1.4e-9 and 3e-9 mbar.
now, these pressures are compatible with the opening of the valves!

Manar Amer wrote:

A plot showing the descend of the vacuum in the mirror chambers (data to plot it obtained yesterday evening)

The regions where there is a drastic decrease is when the ionic pump was turned on.

Today in the morning the pressure was

  • on the left                    :  1.3*10^-9 mbar
  • on the right (sortie X)  :  4.9*10^-9 mbar

in the evening the pressure was

  • on the left                    :  1.4*10^-9 mbar
  • on the right (sortie X)  :  4.7*10^-9 mbar

 

 