HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of installation, including shipping and de-installation of test setups.  Not logged in ELOG logo
Entry   UPS installation and commissioning, posted by Ronic Chiche at ThomX igloo about cabling 
    Reply   UPS installation and commissioning, posted by Ronic Chiche at ThomX igloo about cabling 
       Reply   UPS installation and commissioning, posted by Ronic Chiche at ThomX igloo about cabling 
Message ID: 50     Entry time: Wed Dec 20 09:35:36 2023     Reply to this: 51
 Author: Ronic Chiche 
 Status: Fixed 
 Type: info 
 Category: cabling 
 Location: ThomX igloo 
 Title: UPS installation and commissioning 

Jean-Noel Cayla installed several days ago a Eaton 9PX 11kVA UPS inside the Igloo, outside of the ThomX bunker
and I asked him to place only 1 UPS plug on the wall close to the FP-cavity to supply only the NKT/OneFive oscillator and the Smaract laser cavity motors.

I checked that if I plug a device on this UPS plug, I'm able to follow the power, used by the device, on the UPS monitoring screen.

thus, this morning, I plan to switch off the laser oscillator and move its power cable from a standard plug to the UPS plug and test if we are able to find back the previous performances of the locking.

the present Smaract motor positions are : CH0 => +140µm / CH2 => -177.8µm
as unpowering the motor will put the read position at 0µm, I first go back to 0µm for both channel.
I will put them back at their original values after I plug the motors back to UPS.

 

 