| ID |
Date |
Author |
Status |
Type |
Category |
Location |
Title |
Text |
 |
|
11
|
Fri Feb 26 17:04:57 2021 |
Ronic Chiche | Fixed | report | mechanics | ThomX igloo | Moving the optical table to the Igloo | This morning the Bovis company moved the
optical table from the optical room to the
Igloo without any problem. |
9x |
|
12
|
Mon May 17 11:53:35 2021 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | ThomX housing roof opening | Today, Yannick Petrilli removed 5 concrete
bars (5-9) from the ThomX housing roof in
order to let the optical table be installed |
 |
|
13
|
Thu Jun 10 16:55:37 2021 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Connecting the optical table to the ThomX ring | On the 19th of May, the optical table has
been moved inside the ThomX concrete housing
and connected to the Symetrie hexapod and |
  |
|
14
|
Thu Jun 10 17:06:42 2021 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Airflow installation | On the 27th of May, the Airflow has been
dismounted from the optical room to be mounted
around the optical cavity by the AirC2 company. |
|
|
15
|
Thu Jun 10 17:45:09 2021 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Airflow installation | The AC plug and the power cord of the airflow
were quite hot because they have been dimensioned
for 16A current and the total current is |
|
|
16
|
Thu Oct 14 15:08:56 2021 |
Ronic Chiche | Fixed | info | detectors and electronics | utilities | ThomX igloo | Cleaning, Motors Controllers mini-rack, hexapod controller, chiller and vacuum | This morning with Manar, we started to
clean the floor around the cavity, the outside
part of the panels of the housing, and the |
|
|
17
|
Thu Oct 14 18:12:39 2021 |
Ronic Chiche | Fixed | info | detectors and electronics | utilities | ThomX igloo | Cleaning, Motors Controllers mini-rack, hexapod controller, chiller and vacuum | This afternoon, we continued to clean the
housing with Manar and Daniele.
we did a dust measurement after cleaning |
|
|
18
|
Fri Oct 15 14:21:03 2021 |
Manar Amer | Fixed | report | vacuum | cabling | software | ThomX igloo | Vacuum in the mirror chambers |
The electron ring has been vacuum
inside it, but the valves connecting it to
the two mirror chambers are closed. Before |
   |
|
19
|
Fri Oct 15 14:34:34 2021 |
Manar Amer | Fixed | report | vacuum | cabling | software | ThomX igloo | Vacuum in the mirror chambers | the ionic pumps have been also connected
this morning but not powered on, yet.
the vacuum group is waiting for a |
|
|
20
|
Fri Oct 15 17:57:54 2021 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | ThomX igloo | Installation update | This afternoon with Manar, we finished
connecting FP-cavity mirrors motors and alignment
mirrors motors to their 3 ISP controllers. |
|
|
21
|
Mon Oct 18 09:46:14 2021 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | ThomX igloo | Installation update | after the WE, the right vessel vacuum level
is 1.7e-7 mbar (primary + turbo pumps)
and the left vessel vacuum level |
|
|
22
|
Mon Oct 18 15:01:07 2021 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | ThomX igloo | Installation update | Now, both vessels are pumped by an ionic
pump (both Turbo pumping entrances have been
closed). |
|
|
23
|
Mon Oct 18 15:15:26 2021 |
Manar Amer | Fixed | report | cabling | software | ThomX igloo | Motors Controler and Software |
When connecting
the Ethernet cable from the hub to the computer,
it must be connected to the correct one (shown |
  |
|
24
|
Tue Oct 19 10:43:42 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Vacuum pressure to open valves | The pressure for the mirror vacuum chambers
needs to be ~ few 10^-9 mbar for the valves
to be open to the electron ring (the rest |
|
|
25
|
Tue Oct 19 11:06:03 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Pressure On mirror Chambers |
At
10h45 in the morning, the pressure on the |
|
|
26
|
Tue Oct 19 12:46:40 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Vacuum pressure to open valves | Reminding: the opening of the valves is
the responsibility of the vacuum group only.
|
|
|
27
|
Tue Oct 19 16:38:31 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Pressure On mirror Chambers | At 15h30 in
the afternoon, the pressure on the mirror
chambers is: |
|
|
28
|
Wed Oct 20 10:51:29 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Pressure On mirror Chambers | At 10h in
the morning, the pressure on the mirror chambers
is: |
|
|
29
|
Thu Oct 21 09:45:03 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Pressure On mirror Chambers | At 9h30 in
the morning, the pressure on the mirror chambers
is: |
|
|
30
|
Thu Oct 21 18:31:11 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Pressure On mirror Chambers Leckage Test | Leakage test done in the afternoon.
The method :
an atomic mass spectrometer |
 |