HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports., Page 20 of 24  Not logged in ELOG logo
ID Date Author Status Type Categorydown Location Title Text Attachments
  193   Mon Mar 13 14:02:59 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooCW laser installation and cleaningThis morning with Ronic , in preparation
for the mirror installation, we removed additional
mechanics and cables from the table. 
  
  198   Fri Mar 17 18:54:19 2023 Manar AmerFixedreportlasers and opticsOptical roomNew Mirrors from LMA _ ImagesToday we tested a mirror from one patch

image is for the front face of
the mirror
 20230317_Images_of_New_Mirrors-compressed.pptxMirror_Tested.jpgWhatsApp_Image_2023-03-17_at_6.39.44_PM.jpgimage006.jpg 
  200   Mon Mar 20 17:23:09 2023 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayAs the general local network for the FP-cavity
devices is 192.168.xxx.xxx, I changed the
IP adress of the smaract laser motors (Frep
 MCS_Network_Interface_Configuration_Guide-1.pdf20230320_154643[1].jpg 
  213   Thu Jun 1 10:31:45 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockthe last tries to lock the 33MHz + amplifier
to the 30k Finesse FP-cavity were unsuccessful.

during a laser Frep scan using
 120705_Displacement_of_cylindrical_piezo_ceramics.xls 
  214   Thu Jun 1 18:15:04 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockfinding the right modulation/demodulation
PDH phase is very difficult on the main resonance
because the we get non stationnary signals
  
  217   Tue Jun 6 15:52:59 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier locktoday with Daniele, we locked easily (but
with a noisy lock) on the secundary resonance
and we tried to lock on the main resonance
 M250_Video_Amplifier.pdfM250_manual.pdf 
  219   Thu Jun 8 11:12:20 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockAfter removing the 2 generators from the
optical table, the lock is much more stable
and now, it is possible to lock on the main
  
  222   Tue Jun 20 18:45:10 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockthis morning, I tested the laser+amplifier
@ 30% lock on the FP cavity with and without
Smaract motors.
 PDH_error_signal_with_Smaract_motors_ON-OFF.jpgLock_at_amp_@30%.jpg10kW_in_remote.jpg 
  223   Tue Jun 20 19:08:17 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockI checked with the Matlab code below the
CEP detuning effect (2nm sech² spectrum...
not exactly the same as in ThomX)
 ThomX_FP_intracavity_signal.m 
  224   Thu Jun 22 20:20:03 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockwe checked yesterday morning the real input
power @ 30% for the amp => it is 16W in
agreement with the previously measured values
  
  225   Wed Jun 28 19:01:03 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooFirst X rays and FP-cavity mode and electron beam waists size @ IPon friday 23/06 afternoon, after scanning
the hexapod z-axis, we observed a cut of
the power stored in the FP-cavity (with constant
 Raw_data.jpganalyse_profil_vert_X-1.pptx 
  226   Wed Jun 28 19:07:42 2023 Ronic ChicheFixedissuelasers and opticsThomX iglooIncoming laser beam power issuetoday, we observed on the photodiode used
in reflexion of the cavity, that its voltage
level stops increasing after 50% of power
 Amp_power_vs_ratio.png 
  227   Wed Jul 26 14:49:41 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockToday, we locked the cavity with input
power @ 30% for the amp => we got 40kW
with only 30% of coupling (and a bad lock
  
  235   Tue Sep 5 18:08:39 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooEquipments shutdownon the August 30rd and 31th, a global power
shutdown was forseen for ThomX.

to prevent damage on equipments,
  
  236   Tue Sep 5 18:21:12 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooFP-cavity FSR shifttoday, to match the ring frequency at 500.25MHz
(15th laser harmonic), we did a frequency
shift on the laser using the Smaract motors
 20230905_173506.jpg 
  238   Wed Sep 6 20:09:56 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooSmaract controller remplacementpreviously, we were using a spare Smaract
MCS controller to drive the Onefive linear
stages (without -LV -low vibration-
  
  239   Thu Sep 7 18:51:43 2023 Ronic ChicheFixedissuelasers and opticsThomX iglooOnefive laser modelock and Smaract CEP controllertoday, during an attempt in improving the
CEP with the Smaract controller CH2, we lost
the laser modelock.
  
  244   Fri Sep 8 19:45:56 2023 Ronic ChicheFixedinfolasers and opticsThomX igloo33MHz oscillator + Alphanov amplifier lockredoing the PDH error signal scheme with
discrete components is more flexible and
it is easier to check the signal/noise ratio.
  
  262   Fri Sep 15 19:13:44 2023 Ronic ChicheFixedinfolasers and opticsThomX igloodrift calculation for the SMA100Athe goal is to estimate what could be the
frequency drift at 500MHz for the SMA100A:
see phase noise datasheet in attachement
 Capture1.PNGCapture2.PNG 
  270   Fri Sep 22 11:30:28 2023 Daniele NutarelliFixedreportlasers and opticsOptical roomLaser FP operationThis morning FP Laser was operating well
locked at 30 KWatts in stable vay.

There are some fluctuations due
 IMG_20230922_105006_resized_20230922_111612040.jpg 
ELOG V3.1.4-395e101