  319   Fri Jan 26 11:05:27 2024 Ronic ChicheFixedinfomechanics | lasers and optics | cablingThomX igloocontroller M1 & M4 (plan mirrors) with IcePap controllersat the begining of each session, it will
be mandatory to avoid any backlash for the
motors :
  
  320   Fri Jan 26 13:04:56 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX igloo33MHz (FP-cavity vs RF) phase stability today, I locked the laser on the
FP-cavity and the FP-cavity on the RF reference
with 47kW inside the FP-cavity.
  
  321   Thu Feb 1 17:23:23 2024 Ronic ChicheFixedinfodetectors and electronicsThomX igloolockingduring the last days we changed the FP-cavity
- RF reference locking system to force the
right bucket:
 Capture.JPGCapture.JPG 
  322   Fri Feb 2 11:53:40 2024 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooLaser cavity temperature/pressure sensitivitythis morning, I did a 500MHz beating frequency
(Laser vs RF) drift test with the Smaract
motors configured with "Sensor Mode"
 Capture.JPG 
  323   Wed Feb 7 18:33:42 2024 Ronic ChicheFixedinfodetectors and electronicsOptical roomlock oscillateur 33MHz - synthé 500MHzThis morning with Daniele, we changed the
laser/RF locking scheme :

1) we use the laser 33MHz internal
  
  327   Fri Mar 1 18:38:17 2024 Ronic ChicheFixedinfosoftwareThomX igloocorrect parameters for locking the FP-cavityToday, we restarted the FP-cavity locking,
after 3 weeks without using it.
those 3 weeks have been used to set
 good_parameters.png 
  328   Mon Mar 4 09:32:06 2024 Ronic ChicheFixedinfosoftwareThomX igloocorrect parameters for locking the FP-cavitythis morning I solved the problem of the
33MHz frequency beating which should be ~12kHz
between the generator (at the new frequency
  
  329   Mon Mar 4 12:39:56 2024 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooLaser and FP cavities frequency adjustmentat the beginning of the procedure, the
frequency gap between the new Ring 33MHz
frequency (33.3378MHz) and the laser/FP cavities
  
  330   Mon Mar 4 18:32:21 2024 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooLaser and FP cavities frequency adjustmentThis afternoon, I did the 2nd half of the
travel: dF @ 33MHz = 0Hz
=> the Smaract motor position is
  
  331   Tue Mar 5 11:20:43 2024 Ronic ChicheFixedinfosoftwareThomX igloocorrect parameters for locking the FP-cavitythis morning, I finished the FP-cavity
alignment with the new ring RF frequency.
I get back 50kW @ 33% amplifier ratio.
 Correct_lock_parameters.png 
  332   Tue Mar 19 13:01:22 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationThis morning with Daniele, we operated
the FP-cavity to be sure there is no issue
due to the Linac section changing operation
  
  333   Tue Mar 26 10:20:54 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationThis morning, I locked again the FP-cavity
at more than 50kW with 33% of laser amplifier
ratio.
  
  334   Tue Apr 2 08:51:21 2024 Ronic ChicheFixedinfolasers and opticsThomX iglooNew multiplication factor for the Fabry-Perot intra-cavity powerlast week, we measured the transmission
of a plan mirror from the same batch than
the ThomX mirrors and we got ~ 1.75ppm instead
  
  335   Tue Apr 2 09:19:31 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationfrom now on, the transmission factor for
calculating the FP intra cavity power is
1/1.75ppm ~ 570 000 (changed in the Powermeter
  
  336   Tue Apr 9 09:38:18 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationthis morning, I had to restart the chiller.
Temp Amp 1 is at 27.5°C after having
started the amplifier at 33% ratio.
  
  337   Thu Apr 11 09:58:10 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationthis morning, the computer was restarted
and I had to launch all the applications.
no problem except the powermeter for
 Capture.JPG 
  338   Thu Apr 25 09:09:49 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operation

this morning, the chiller was in
error and I had to restart it.
  
  339   Tue May 14 09:20:27 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationYesterday, the ThomX water circuit should
have been repared,
and yesterday aftenoon, Daniele restarted
  
  340   Tue May 14 10:37:41 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationthe air temperature is between 21°C
and 22°C.

I tried to lock the cavity but
 Capture.JPG 
  341   Tue May 28 15:05:46 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooFP-cavity lock survey during the Linac section changing operationtoday, I tried to restart the amplifier
at 0% (without 3rd stage) but it didn't
start... still the same error message.
  