  165   Thu Oct 20 15:01:02 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentI used the 33MHz spectrum measurement :
https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/153
fitted by P=P0*sech²((f-f0)/df)
 D24-02.xls33MHz_power_spectrum_after_double_patch_strecher_CVBG.png 
  164   Wed Oct 19 15:01:32 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentThis morning with Ronic, using a pickup
mirror, we measured the power in different
locations along the path of the stretcher
  
  163   Wed Oct 19 14:57:43 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentThis morning with Manar, we measured the
power at different points:
- direct measurement at the output
  
  162   Tue Oct 18 17:51:12 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentIn preparation for tomorrow morning, I
did a test with a 45° mount to have a
power pickup inside the injection box.
  
  161   Mon Oct 17 13:58:08 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentThis morning with Viktor, we started the
alignment of the CVBG and fiber.

we did a better alignment of the
 Adjustment_SMS.pdf 
  160   Thu Oct 13 12:26:07 2022 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmentToday, after laser was modelocked, we checked
the power inside the fiber coming from the
Alphanov Strecher box.
  
  159   Thu Oct 13 12:19:11 2022 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayToday, we succeded to make the laser modelock.
the ouptut power is above 35mW (the
powermeter was saturated)
 IMG_20221013_095839.jpg 
  158   Thu Oct 13 12:12:49 2022 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayYesterday, we put back the 33MHz oscillator
into the casemate with the new Smaract controller.
after switching ON the laser controller,
  
  157   Fri Oct 7 17:47:39 2022 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayToday, we used an "ELI-NP" Smaract
controller made with these 2 references :
MCS-3CC-ETH-TAB (SN 2271) => main
  
  156   Wed Oct 5 15:51:26 2022 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayYesterday with Aurélien, we try
to make the laser modelock using the Smaract
translation stages embedded inside the laser
 Stick-Slip_Positioners_Mechanical_and_Electrical_Interface_Data_Sheet.pdf 
  155   Mon Oct 3 18:54:58 2022 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayThis morning, with Aurélien and
Daniele, we did the swap between the 33MHz
and 133MHz oscillators.
  
  154   Tue Aug 30 18:31:49 2022 Loïc AmoudryFixedreportlasers and opticsOptical roomAmplifier output power We checked the Dichroic mirror we have
: it is a DMSP1000 shortpass dichroic mirror
as specified in this post.
  
  153   Tue Jul 12 15:55:20 2022 Ronic ChicheFixedinfolasers and opticsOptical room33MHz laser SN2439 back to OrsayOn the 8th of July, the SN2439 33MHz laser
was returned from NKT to our lab, being repaired.

it stayed all the weekend to warm
 Capture.PNG 
  152   Wed Jun 15 15:18:57 2022 Ronic ChicheFixedinfolasers and opticsThomX igloomirrors removingThis morning with Viktor, we opened the
2 vessels and removed the 4 FP-cavity mirrors.

all the mirrors have been put in
  
  151   Tue Jun 14 10:43:07 2022 Ronic ChicheFixedinfovacuumThomX iglooVessels vacuum at ambiant pressureLast Friday and this morning, with Bruno,
we close the ring/cavity valves and put some
dry air in the two vessels through a filter
  
  150   Tue Apr 26 11:15:23 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier compressor's CVBG thermal imageslast Friday with Manar, we took some thermal
images of the Alpnavov compressor box.

I post a small document to summarize
 Thermal_images.pdf 
  149   Tue Apr 26 11:12:58 2022 Ronic ChicheFixedissuelasers and opticsThomX iglooAlphanov amplifier compressor's CVBG thermal imageslast Friday with Manar, we took some thermal
images of the Alpnavov compressor box.

I post a small document to summarize
 Thermal_images.pdf 
  148   Tue Apr 19 12:15:43 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileFor better comparison ,

the measurements done previously
with 2 CVBGs was done at ~ 30 cm and the
 8x 
  147   Fri Apr 15 19:00:20 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam ProfileVictor, Ronic, Manar

Today  was dedicated to the
study of the CVBG, and it's effect on
 20x 
  146   Fri Apr 8 19:25:16 2022 Manar AmerFixedreportlasers and opticsThomX iglooAlphanov amplifier Beam Pulse DurationPulse Duration FWHM = 12.9 ps




  