63
Mon Sep 30 11:30:32 2019
Ronic Chiche
Fixed
info
lasers and optics
Optical room
Finesse measurement
To complete these observations:
Finesse has been measured
on thursday, right after cleaning the cavity
64
Thu Oct 3 13:49:58 2019
Loïc Amoudry
Fixed
info
mechanics
Optical room
Pneumatic valves
Frederic and Manu from vacuum group came
this morning to fix again the pneumatic valves
which had a leak again.
68
Wed Oct 9 10:08:24 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Improvement holder amplifier fiber
We've added a clamp in the 3rd stage
to prevent the pump fiber from moving and
tilting (it was tilting to the left).
69
Wed Oct 9 10:10:01 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Free Spectral Range (FSR)
FSR is 33.347 MHz @1e-8 mbar
70
Wed Oct 9 10:16:24 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Fiber injection and onefive output power
Fiber injection is finished with the new
ThomX stretching CVBG in double pass (+50%
injection power compared to K-BOX CVBG in
71
Wed Oct 9 11:41:11 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Onefive spectrum and CVBG spectrum
The Onefive spectrum has shifted a little
bit to lower lambda. It's still enough
for the experiment (3mW injection of ampli
75
Fri Oct 11 18:49:00 2019
Ronic Chiche
Fixed
info
detectors and electronics
Optical room
New locking scheme
Before, the locking scheme was to produce
an error signal with the PDH box, send its
output to the electronic amplifier box and
80
Thu Nov 21 11:37:13 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Onefive Origami 33MHz specs
Beam Size Onefive added
85
Wed Nov 27 13:53:57 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Onefive output power
The pump voltage has been increased few
days ago when looking for a modlock of the
laser.
86
Thu Nov 28 10:40:29 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
CVBG reference and Eric Cormier calculation
The Stretcher is the "D 24-02-II",
it must be used in double path before the
amplifier injection.
87
Tue Feb 4 14:39:56 2020
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Onefive output power
Onefive output power measured today. 3.52
mW with OD1 filter ==> ~35mW.
95
Wed Feb 26 10:38:37 2020
Ronic Chiche
Fixed
info
lasers and optics
Optical room
Optical spectrum analyzer resolution
The Koheras @0.5mW is directly connected
with fibers FC/APC -> FC/PC to the Avantes
optical spectrum analyzer.
96
Wed Feb 26 11:05:09 2020
Ronic Chiche
Fixed
info
lasers and optics
Optical room
Optical spectrum analyzer resolution
Same measurement with Koheras @100mW and
using fiber coupling lenses between Koheras
and Avantes OSA.
97
Wed Feb 26 16:48:02 2020
Ronic Chiche
Fixed
info
lasers and optics
Optical room
Optical spectrum before and after CVBG
Measurement of the optical spectrum with
Avantes OSA before (1st picture) and after
CVBG (2nd picture) with 2nd stage on the
101
Tue Jul 7 12:49:38 2020
Ronic Chiche
Fixed
info
lasers and optics
Optical room
Finesse measurement after the Edge installation
After the Edge installation inside the
cavity, the Finesse has been measured several
times by modulation technique with an average
102
Tue Oct 27 13:13:50 2020
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Coating reflectivity
Coatings reflectivity curves and datas
for HR Saphir, HR Suprasil and HR ULE.
6x
106
Thu Nov 4 13:05:49 2021
Ronic Chiche
Fixed
info
lasers and optics
ThomX igloo
FP cavity alignment
as the iris used to locate the FP-cavity
axis have been removed before moving the
table inside the Igloo, we have to find again
107
Thu Nov 4 18:57:16 2021
Ronic Chiche
Fixed
info
lasers and optics
ThomX igloo
FP cavity alignment
This afternoon, we continued the alignment
of the red laser.
we did it using the 2 final injection
112
Mon Jan 17 10:04:14 2022
Ronic Chiche
Fixed
info
mechanics
ThomX igloo
Documentation about mechanics on Atrium
https://atrium.in2p3.fr/0dded51a-1cb0-43e6-ae0d-626cd5db7078
a lot of schematics regarding the
128
Fri Mar 11 12:46:58 2022
Ronic Chiche
Fixed
info
lasers and optics
ThomX igloo
FP cavity mode axis change and Finesse measurement
this morning with Manar, we did a cavity
mode axis change.
we checked the cavity mode centroid