  Status of commissioning, report also here plots are reports., Page 12 of 24  Not logged in ELOG logo
ID Date Author Status Typedown Category Location Title Text Attachments
  460   Tue Oct 28 17:31:47 2025 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX iglooHigh frequency noisewe did some tests with Marie to make some
vibrations on the door.
below, I exhibit some pictures of
 Accelerometer_on_door_wo_noise.pngAccelerometer_on_door_with_few_noise.pngAccelerometer_on_door_with_few_noise2.png 
  463   Mon Dec 8 11:17:17 2025 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX iglooHigh frequency noiseThis morning, I installed a high-voltage
probe (1:1000) on the AC-line to see if one
could detect a correlation between lock losses
 AC-line.png 
  1   Tue Sep 25 19:17:43 2018 Loïc AmoudryFixedinfolasers and opticsOptical roomOnefive Origami 33MHz specsPower during ~20h, power after turn on,
spectrum image and excel datas, polarisation
and pulse length.
 6x 
  2   Thu Sep 27 15:43:48 2018 Ronic ChicheFixedinfolasers and opticsOptical roomOnefive Origami 33MHz specs - Polarisationone rotate a lambda/2 before a PBS and
meausure the refected power:

Pmax=35.6 mW
 polar_onefive_33MHz_polarisation.jpg 
  7   Mon Oct 22 11:03:22 2018 Ronic ChicheFixedinfovacuumOptical roomDétection de fuiteMail de Bruno Mercier du 18/10/2018 :

Un petit CR
de la journée:
  
  8   Mon Oct 22 11:27:35 2018 Ronic ChicheFixedinfomechanicsOptical roomRemontage mécaniqueMail de Yann du 12/10/2018 :

Je vous fais le bilan des actions
effectuées :
  
  9   Mon Oct 22 11:29:41 2018 Ronic ChicheFixedinfomechanicsOptical roomRemontage des vérinsMail de Yann du 8/10/2018 :

Bonjour,
Tous les vérins sont maintenant
  
  10   Mon Nov 26 15:18:49 2018 Ronic ChicheFixedinfovacuumOptical roomEtuvage cavité THOMXMail de Bruno Mercier
du 19/11/2018 :


Une première cavité
  
  11   Fri Dec 21 13:55:09 2018 Loïc AmoudryFixedinfovacuumOptical roomEnd of vacuum test and cavity ready for cleaningVacuum tests finished on 19 december
2018.

Spent last two days to discuss
 IMG_20181221_1110152.jpgIMG_20181221_1119082.jpgIMG_20181221_1113122.jpgIMG_20181221_1124492.jpg 
  17   Tue Feb 19 15:50:08 2019 Loïc AmoudryFixedinfomechanicsOptical roomMotors connexionsMotors are connected. The true mirror's
name are P1 for injection mirrors, S2, S3
and P4. (S=spherical, P=planar).
 Validation_moteurs.jpg 
  27   Tue Apr 2 18:05:46 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomBeam size at closest spherical mirrors positionS3 and S2 @ +1 640 000 and P1 and P4 @
-825 000

Diameter in x: 4.7mm
  
  34   Thu Apr 18 16:07:23 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomInjection of 33MHz Onefive through fiberOutput power of the Onefive, and power
after injection and different components
have been measured.
 power_ouput_Onefive.PNGpower_after_injection_and_point9dB_blue_fiber.PNGpower_after_halfwaveplate_and_injection_and_point9dB_blue_fiber.PNGpower_after_halfwaveplate_and_injection_and_point9dB_blue_fiber_and_EOM_NIR-MPX-LN-0dot1.PNGpower_after_halfwaveplate_and_injection_and_point9dB_blue_fiber_and_EOM_NIR-MPX-LN-02.PNG 
  42   Wed Jun 12 17:49:20 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomPolarizationPolariztion measured with Input vertically/horizontally polarized
(~100% DOLP)

- Transmission (P4) locked on cavity
 Polar_horiz_trans_P4.PNGPolar_vert_trans_P4.PNGPolar_vert_input.PNG 
  43   Tue Jun 18 20:44:34 2019 Huan WangFixedinfolasers and opticsOptical roomtelescope for Koherastelescope of Koheras is removed, information
record here:

- distance between collimator edge
 2019.06.18_telescope_of_Koheras.jpg 
  46   Thu Jul 4 10:17:46 2019 Ronic ChicheFixedinfodetectors and electronicsOptical roomNew design for PDH boxesA new design has been studied for the 5
PDH boxes to better match the low (33MHz)
repetition rate of the ThomX laser.
 2019-06-14_-_PDH_Maurice_modifié.pdf 
  49   Mon Jul 29 17:15:35 2019 Loïc AmoudryFixedinfomechanics | lasers and opticsOptical roomSpin coater air supply removed and front panel changedSpin coater firstly needed vacuum and air
supply. The air supply being useless for
our experiments, it has been disabled.
 1.jpg2.jpg3.jpgfront_panel.png 
  55   Tue Sep 3 18:06:29 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomMirrors sent to LMAMirrors have been sent today to LMA for
cleaning and maybe annealing (recuit). 3
ULE of ThomX and the fused silicate for injection
  
  57   Fri Sep 6 14:59:00 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomLMA cleaning techniqueChristophe MICHEL told us more precise
informations about spin coater cleaning.

They always clean with pur water
  
  61   Fri Sep 27 16:17:36 2019 Ronic ChicheFixedinfolasers and opticsOptical roomFinesse measurementAfter mirrors were going back from LMA
for cleaning and thermal anealing, they have
been installed in FP cavity for Finesse measurement.
  
  62   Mon Sep 30 11:20:48 2019 Loïc AmoudryFixedinfolasers and opticsOptical roomDiffusion ULE spherical mirror (S3) vs Fused Silicate injection planar mirror (P1)Observation made with IR Beam Viewer: 

The observation of P1 and S3 simultaneously
while locking shows much higher diffusion
 diffusion.jpg 