  2   Thu Sep 27 15:43:48 2018 Ronic ChicheFixedinfolasers and opticsOptical roomOnefive Origami 33MHz specs - Polarisationone rotate a lambda/2 before a PBS and
meausure the refected power:

Pmax=35.6 mW
 polar_onefive_33MHz_polarisation.jpg 
  3   Tue Oct 2 16:23:54 2018 Ronic ChicheFixedissuemechanics | cabling | softwareOptical roomtest des vérins ISP * les vérins de 20mm (axe Z) ont
été testés sur table
grace à une rallonge SUB-C - DB9,
  
  4   Tue Oct 2 18:00:36 2018 Ronic ChicheFixedissuemechanics | cabling | softwareOptical roomtest des vérins ISP  




 CABLAGE_VERINS.pdf 
  5   Wed Oct 3 11:28:46 2018 Ronic ChicheFixedreportmechanics | cablingOptical roomtest des vérins ISP 20mm et 6mmAprès avoir utilisé la chaine
: driver ISP - cable ISP DB9 - Feedthrough
enceinte DB9-DB9 - cable perlé DB9-SUB-C
  
  6   Fri Oct 5 10:17:30 2018 Ronic ChicheFixedreportmechanics | cablingOptical roomtest des vérins ISP 20mm et 6mm 




  
  7   Mon Oct 22 11:03:22 2018 Ronic ChicheFixedinfovacuumOptical roomDétection de fuiteMail de Bruno Mercier du 18/10/2018 :

Un petit CR
de la journée:
  
  8   Mon Oct 22 11:27:35 2018 Ronic ChicheFixedinfomechanicsOptical roomRemontage mécaniqueMail de Yann du 12/10/2018 :

Je vous fais le bilan des actions
effectuées :
  
  9   Mon Oct 22 11:29:41 2018 Ronic ChicheFixedinfomechanicsOptical roomRemontage des vérinsMail de Yann du 8/10/2018 :

Bonjour,
Tous les vérins sont maintenant
  
  10   Mon Nov 26 15:18:49 2018 Ronic ChicheFixedinfovacuumOptical roomEtuvage cavité THOMXMail de Bruno Mercier
du 19/11/2018 :


Une première cavité
  
  24   Fri Mar 29 18:33:15 2019 Ronic ChicheFixedissuemechanics | lasers and opticsOptical roomAlignment procedurewe did again the complete alignment procedure
starting with iris and optimizing injection
motors Ma and Mb, then installing mirror
  
  38   Thu May 23 10:10:56 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement by decay time technique5 Files attached:

- Note on the technique and results
for the present cavity on 2019, May 21th
 2019-05-21_-_Finesse_measurement_by_decay_time_technique.docxtek0005CH1.isftek0006CH1.isfplotdata.mmyerror.m 
  46   Thu Jul 4 10:17:46 2019 Ronic ChicheFixedinfodetectors and electronicsOptical roomNew design for PDH boxesA new design has been studied for the 5
PDH boxes to better match the low (33MHz)
repetition rate of the ThomX laser.
 2019-06-14_-_PDH_Maurice_modifié.pdf 
  50   Fri Aug 30 09:44:56 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement after mirror cleaning using the spin coaterLast Finesse measurement in air : ~ 17
000 the 20th of may (see logbook)

28th and 29th of august, we cleanned,
  
  51   Fri Aug 30 17:46:15 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement after mirror cleaning using the spin coatertoday I cleaned S3 with isopropanol and
then with pure water on spin coater.
Finesse is only 10 700.(coupling 50%
  
  52   Fri Aug 30 17:52:41 2019 Ronic ChicheFixedissuemechanics | detectors and electronicsOptical roomMotor issueToday, Axis 9 (Z-axis of P1) has blocked
the software which drives all the motors.
impossible to bypass the problem.
  
  53   Tue Sep 3 17:51:04 2019 Ronic ChicheFixedissuemechanics | lasers and optics | vacuumOptical roomVessel cleanlinesslooking in the vessel of the FP cavity
using a UV lamp shows a lot of dust... more
dust than outside the cavity !!!
 IMG_20190903_161910.jpg 
  54   Tue Sep 3 18:04:03 2019 Ronic ChicheFixedreportlasers and opticsOptical roomFinesse measurement after mirror cleaning using the spin coaterFollowing finesse measurements (start @10700): 
Clean P1 with SC (water) + isoprop
(wipe) finesse @15000
  
  59   Wed Sep 25 15:49:28 2019 Ronic ChicheFixedissuemechanics | detectors and electronicsOptical roomMotor issueToday again, same problem with axis 9 blocking
the controlling software during the mirror
alignment procedure.
  
  61   Fri Sep 27 16:17:36 2019 Ronic ChicheFixedinfolasers and opticsOptical roomFinesse measurementAfter mirrors were going back from LMA
for cleaning and thermal anealing, they have
been installed in FP cavity for Finesse measurement.
  
  63   Mon Sep 30 11:30:32 2019 Ronic ChicheFixedinfolasers and opticsOptical roomFinesse measurementTo complete these observations:

Finesse has been measured
on thursday, right after cleaning the cavity
  