  135   Mon Aug 22 18:39:13 2022 Manar AmerFixedreportlasers and opticsOptical roomAmplifier output Beam ProfileBeam divergence after amplifier 4.46 mrad

 

  
  136   Tue Aug 23 17:37:38 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputI placed a periscope to adjust the high
of the beam from the amplifier output from
~ 10 cm from the table to ~ 15 cm
 20220823_setup.jpg 
  137   Wed Aug 24 10:39:58 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputHere is a view of beam propagation in the
optical software : GaussianBeam

the red filled shape is the model
 Capture.PNGTelescope_AMPLI_CELIA_1.xml 
  138   Wed Aug 24 10:45:24 2022 Manar AmerFixedreportlasers and opticsOptical room2 Mirror Setup @ 216.6 MHzAdding information about the 2 mirror cavity
setup (plan - spherical)
that is currently installed.
 manip2miroirs.pptx2mirror_plan_shperical_beam_size.png 
  141   Fri Sep 2 17:50:21 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputremoving the reading which is not correct
(wrong use of software)

redone a reading similar using
 Beam_Profile_Fit_using_gaussian_Beam.jpgBeam_Profile_Fit_using_gaussian_Beam.xml 
  142   Fri Sep 2 18:10:10 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputNote the
correct beam divergence is approximately
~ 2.3 mrad
 Ampli_Celia_2.3mrad_divergence_New_Telescope.jpgBeam_waist_at_injection_image.jpg 
  143   Mon Sep 5 18:06:53 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputAm adjustment on the lenses position to
have a smaller waist.

+ 250 mm @ 88 cm from amplifier
 20220905_Telescope_lense_placement.jpg 
  145   Wed Sep 7 18:57:20 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputWe increased the power of the amplifier
up to 10 W to see if there is a change in
the beam shape at the injection point or
  
  146   Wed Sep 7 18:58:03 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity Today we managed to observe the fundamental
mode and stabilize the scan on it until we
improved the alignment enough.
 20220907_00mode.jpg20220907_00mode_diameter.jpgScreenshot_2022-09-07_0_174654.pngScreenshot_2022-09-07_2_182520.png 
  147   Thu Sep 8 11:16:40 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity Today, we played on the CEP but using the
I-tune input of the Menhir Laser (+/- 5V
maximal range).
  
  148   Thu Sep 8 13:39:03 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity We played on the CEP using the USB command
"id0=xxxxx" of the Menhir.

we put id0=48650 and we improved
 Screenshot_2022-09-08_0_133245.png 
  149   Thu Sep 8 14:58:51 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity We managed to lock the cavity by adding
the AOM , but the lock is still difficult
to stabilize.
 Screenshot_2022-09-08_2_144338.png 
  150   Thu Sep 8 18:28:51 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity We wanted to increase the power of the
amplifier to measure the transmission output
at M2,
  
  151   Fri Sep 9 11:50:17 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity We locked the cavity, and it is stable
using the Transmission,

the high frequency that we thought
  
  152   Fri Sep 9 12:45:19 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity image of the lock with Coupling of ~ 60%

 

 Screenshot_2022-09-09_0_120737.png 
  153   Fri Sep 9 12:49:44 2022 Manar AmerFixedreportlasers and opticsOptical roomLocking Amplifier with Cavity Alignment was improved to ~ 1.2 V on the
photodiode.

Only the second stage was on with
  
  154   Fri Sep 9 14:44:35 2022 Manar AmerFixedreportlasers and opticsOptical roomPower storage In CavityWe start of power output from amplifier
of 1W with only the first and second stage
on then we start with the third stage power
  
  155   Fri Sep 9 15:47:46 2022 Manar AmerFixedreportlasers and opticsOptical roomPower storage In CavityAt transmission power of 42 mW, coupling
60%, we see fundamental mode with a degeneracy

The D-shape motors were moved to
 Transmission_after_S2.jpg 
  158   Mon Sep 12 16:27:14 2022 Manar AmerFixedreportlasers and opticsOptical roomPower storage In CavityPower increased in the amplifier

reflective filters added at the
transmission point to be able to have signal
  
  159   Mon Sep 12 17:00:35 2022 Manar AmerFixedreportlasers and opticsOptical roomPower storage In Cavityat max stage we reached at 2.5
A on the diodes we have

8000 gain , coupling ~
 00mode_higer.jpg00mode_Removed_higer.jpg 