  107   Fri Jul 8 17:09:26 2022 Manar AmerFixedreportlasers and opticsOptical roomImages of ThomX mirrors Under the microscope,

the spherical mirrors show the
deposit of metal dots on the reflecting surface
 ThomX_Spherical_Front_coating.jpgThomX_Spherical_2_Front_coating.jpgThomX_Spherical_back.jpg 
  108   Fri Jul 8 17:10:44 2022 Manar AmerFixedreportlasers and opticsOptical roomImages of ThomX mirrors Mirror images in the previous log showing
the metal deposit of the coating of the spherical
mirrors
  
  109   Fri Jul 8 17:48:48 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical room2 Mirror Setup @ 216.6 MHzThe cavity was realigned using irises instead
of pinholes, gave a better alignment.

The inside of the box, the spherical
 00mode.jpg00mode_diameter.jpgScreenshot_2022-07-08_0_164115.pngSlide1.JPGSlide2.JPG 
  110   Fri Jul 8 19:37:24 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical room2 Mirror Setup @ 216.6 MHzUpdate for Finesse measurement, The cavity
was put under vacuum ~ 1.1*10^-1 mbar

and the alignment and coupling
 Screenshot_2022-07-08_2_182405.png 
  111   Tue Jul 12 10:07:05 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomFSR change & Finesse Measurements The FSR of the 2 mirror (plan-spherical)
Cavity was adjusted from 210 MHz to reach
216.643 MHz
 00mode.jpg00mode_diameter.jpg00mode_diameter_fit.jpg 
  112   Tue Jul 12 10:19:30 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomFSR change & Finesse Measurements Yesterday evening the cavity was Vacuum
pumped up to pressure of 5.5*10^-2 and locked 

changed FSR to be 216.662 MHz and
 Screenshot_2022-07-11_1_204143.pngScreenshot_2022-07-11_0_203646.png 
  113   Tue Jul 12 14:41:55 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomFSR change & Finesse Measurements a Finesse of 30k with the present mirrors
:

T1=120 ppm ;A1=(2.6+1) ppm;
  
  114   Tue Jul 12 18:53:55 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomInstallation of D-shaped mirror / AlignmentTo prepare for the amplifier. I installed
the D-shapped mirrors after cleaning (using
aceton and ethanol) between the cavity 2
  
  115   Tue Jul 12 19:07:50 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCELIA amplifier installationThe amplifier was installed on the optical
table next to SBox table.

The CVBG that will be used for
  
  116   Fri Jul 22 17:07:32 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCELIA amplifier installation + chillerAmplifier placed next to the pulsed laser
on the table under the airflow

The output is in free space with
 WhatsApp_Image_2022-07-22_at_4.26.24_PM.jpgWhatsApp_Image_2022-07-22_at_4.26.24_PM.jpgWhatsApp_Image_2022-07-22_at_5.02.24_PM.jpg 
  117   Fri Jul 22 17:10:06 2022 Manar AmerFixedreportlasers and optics | detectors and electronicsOptical roomInstallation of D-shaped mirror / AlignmentThe D-shaped mirrors are installed properly
and not cutting the path of the beam.

The cavity has been aligned again
  
  118   Fri Jul 22 18:00:21 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomAlignment / Table setup The current setup of the optical table
attached.

The cavity is aligned and the lock
 20220722_table_setup.jpg20220722_tablesetup.jpg 
  119   Fri Jul 22 18:19:13 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCVBG stretching / Fiber Injection Before injecting into the amplifier, the
pulse needs to be stretched using a CVBG,
type attached.
 7x 
  120   Fri Jul 22 18:25:31 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCELIA amplifier installation + chillerThe software to control the CELIA amplifier
is on the laptop that was placed in ThomX
bunker.
  
  129   Fri Aug 19 16:02:33 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCELIA amplifier installation + chillerClosing series




  
  130   Fri Aug 19 16:03:17 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomAlignment / Table setup closing series




  
  131   Fri Aug 19 16:03:40 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCVBG stretching / Fiber Injection closing series




  
  132   Fri Aug 19 16:31:11 2022 Manar AmerFixedreportlasers and opticsOptical roomAmplifier output Beam ProfileIn preparation to measure the output beam
profile from the amplifier at high power,
I have placed two wedge mirrors just before
 20220819_Setup.jpg 
  133   Fri Aug 19 16:36:18 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputThe previous Sbox telescope was dismantled
and the mechanical components cleaned.

its lenses are still in the mounts,
  
  134   Mon Aug 22 18:38:03 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope / amplifier outputBeam divergence was measured using a method
called  "Focal
 Focal_length_divergence_method.pdfBeam_Profile_at_high_power_.jpgSBOX_CELIA_AMPLIFIER_Divergence_measurement.pdf 