  28   Fri Feb 1 14:04:27 2019 Loïc AmoudryFixedinfolasers and opticsOtherMeeting with LMA people, AFM30/01/19 - The following powerpoint
shows the results discussed with LMA people.

What came out from the discussion
 POINT_SUR_LES_MIROIRS.pptx 
  29   Wed Nov 13 13:15:53 2019 Loïc AmoudryFixedreportlasers and opticsOtherAFM+ InfraRed spectroscopy (IR spectro) has been performedAFM+ InfraRed spectroscopy (IR spectro)
has been performed on 400kW S-BOX mirrors.

Seems that XPS made M3 and M4 dirty,
 191113_AFMetspecIR-miroirs_SBOX.pdf 
  30   Fri Dec 6 11:53:53 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomMirror's cleaningXPS has been proceeded on the 400kW SBOX
mirrors M3 and M4 (the initial cavity spherical
mirrors) in frebruary 2019. Deposited a lot
 resume_M3.PNGresume_M1_M2_M4.PNG 
  31   Fri Dec 6 11:54:58 2019 Loïc AmoudryFixedreportlasers and opticsOptical roomMirror's installedThe initial 400kW SBOX mirrors which have
been cleaned ont 28th of november have been
installed this morning on the SBOX.
  
  46   Thu Jan 9 16:54:05 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomMicroscope and cleaning of SBOX mirrorsThe mirrors went in the cavity the 28th
of november (We did several power up
to 30kW stored and only one to 40kW then
 resume_nettoyage_apres_sejour_dans_K-BOX_et_montee_en_puissance.PNG 
  49   Fri Jan 24 17:52:14 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomAFM analysis of M1AFM has been proceeded on M1 and M2.

The pdf shows the first images
taken with the PLIC room Leica microscope
 200115_AFM_miroirs.pdf 
  50   Fri Jan 24 17:56:11 2020 Loïc AmoudryFixedinfolasers and opticsOptical roomAFM analysis of M2We had enough time to proceed a quick scan
of M2 which has also a hole but not centered
on the mirror.
 M2.PNG 
  51   Fri Jan 24 17:58:45 2020 Loïc AmoudryFixedinfolasers and opticsOptical roomCFBG removed from ThomX CELIA amplifierThe CFBG has been removed successfully
and the amplifier is closed now.

The soldering machine had a calibration
  
  52   Wed Jan 29 19:00:02 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomGlow discharge cleaner on SBOX mirrorsThe glow discharge cleaner has been tested
on the SBOX mirrors.

I've put them 1 by 1. Each
 glow.PNG 
  53   Wed Jan 29 19:04:38 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomSBOX mirrors cleanedToday, SBOX mirrors have been cleaned with
spin coater on HR face and isoprop on back
face. They show similar spots as before.
  
  54   Wed Feb 5 14:47:16 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomSBOX mirrors cleanedYesterday, after installation and alignment
of mirrors and cavity, the Finesse has been
measured with cavity at air pressure, with
  
  55   Wed Feb 5 16:46:01 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomSBOX mirrors cleanedToday we put the cavity to vacuum (~ 0.1
mBar) and we measured again the Finesse with
Koheras and modulation technique.
  
  57   Thu Feb 6 16:58:57 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomPower up to 48kW crater effect againAs we said, after glow discharge and spin
coater we recovered a low power finesse ~23000
(aligning away from the M1 crater).
 3A_136mWtrans.png4A_126mWtrans.pngmode_strange.png 
  60   Wed Dec 16 12:36:37 2020 Loïc AmoudryFixedreportlasers and opticsOptical roomMirror's cleaning and microscope imagingOn 10th of december 2020 we cleaned the
SBOX mirrors and took microscope images
(the name of the images indicates what they
 14x 
  58   Wed Jun 19 18:54:00 2019 Huan WangFixedinfolasers and opticsOptical roomamplifierOnefive output power is 24mW now, and 2.41mW(after
EOM) injected into fiber,

a injection power monitor
 1st_stage_amplifier_monitoring_photodiode_signal.jpg 
  59   Mon Jun 24 16:15:08 2019 Huan WangFixedinfolasers and opticsOptical roomamplifierI just had a phone call with Jérome
and he told me 2 things :

* Be carefull ! the MightyLaser
  
  121   Thu Jul 28 13:52:23 2022 Aurélien MartensFixedreportutilitiesOptical roomchiller for CELIA amplifierThe chiller of CELIA amplifier has been
moved from the corridor to the changing room
in front of PLIC. 
  
  122   Mon Aug 8 11:11:28 2022 Aurélien MartensFixedreportutilitiesOptical roomchiller for CELIA amplifiertoday, temperature of the chiller has been
set to 23°C.

measured temperature in the chiller
  
  226   Fri Nov 29 12:06:05 2024 Alice RenauxFixedinfolasers and opticsOptical roomMenhir 160MHz laserThe Menhir 160MHz has been put back in
place on the CELIA amplifier setup. Its output
power is measured to be 150-160mW with an
 spectre_avant_cvbg.xlsxspectre_apres_cvbg.xlsxspectre_avant_cvbg.pngspectre_apres_cvbg.png 
  227   Fri Nov 29 16:50:04 2024 Alice RenauxUnder Processinfolasers and opticsOptical roomMenhir 216MHz laserThe Menhir 216MHz laser has been put back
in place on the cavity table. Its output
power is measured to be 160mW with an attenuator.
 spectre.xlsxspectre.png 