28
|
Fri Feb 1 14:04:27 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Other | Meeting with LMA people, AFM | 30/01/19 - The following powerpoint
shows the results discussed with LMA people.
What came out from the discussion |
|
|
29
|
Wed Nov 13 13:15:53 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Other | AFM+ InfraRed spectroscopy (IR spectro) has been performed | AFM+ InfraRed spectroscopy (IR spectro)
has been performed on 400kW S-BOX mirrors.
Seems that XPS made M3 and M4 dirty, |
|
|
30
|
Fri Dec 6 11:53:53 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Mirror's cleaning | XPS has been proceeded on the 400kW SBOX
mirrors M3 and M4 (the initial cavity spherical
mirrors) in frebruary 2019. Deposited a lot |
 |
|
31
|
Fri Dec 6 11:54:58 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Mirror's installed | The initial 400kW SBOX mirrors which have
been cleaned ont 28th of november have been
installed this morning on the SBOX. |
|
|
46
|
Thu Jan 9 16:54:05 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Microscope and cleaning of SBOX mirrors | The mirrors went in the cavity the 28th
of november (We did several power up
to 30kW stored and only one to 40kW then |
|
|
49
|
Fri Jan 24 17:52:14 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | AFM analysis of M1 | AFM has been proceeded on M1 and M2.
The pdf shows the first images
taken with the PLIC room Leica microscope |
|
|
50
|
Fri Jan 24 17:56:11 2020 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | AFM analysis of M2 | We had enough time to proceed a quick scan
of M2 which has also a hole but not centered
on the mirror. |
|
|
51
|
Fri Jan 24 17:58:45 2020 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | CFBG removed from ThomX CELIA amplifier | The CFBG has been removed successfully
and the amplifier is closed now.
The soldering machine had a calibration |
|
|
52
|
Wed Jan 29 19:00:02 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Glow discharge cleaner on SBOX mirrors | The glow discharge cleaner has been tested
on the SBOX mirrors.
I've put them 1 by 1. Each |
|
|
53
|
Wed Jan 29 19:04:38 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | SBOX mirrors cleaned | Today, SBOX mirrors have been cleaned with
spin coater on HR face and isoprop on back
face. They show similar spots as before. |
|
|
54
|
Wed Feb 5 14:47:16 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | SBOX mirrors cleaned | Yesterday, after installation and alignment
of mirrors and cavity, the Finesse has been
measured with cavity at air pressure, with |
|
|
55
|
Wed Feb 5 16:46:01 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | SBOX mirrors cleaned | Today we put the cavity to vacuum (~ 0.1
mBar) and we measured again the Finesse with
Koheras and modulation technique. |
|
|
57
|
Thu Feb 6 16:58:57 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Power up to 48kW crater effect again | As we said, after glow discharge and spin
coater we recovered a low power finesse ~23000
(aligning away from the M1 crater). |
  |
|
60
|
Wed Dec 16 12:36:37 2020 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Mirror's cleaning and microscope imaging | On 10th of december 2020 we cleaned the
SBOX mirrors and took microscope images
(the name of the images indicates what they |
14x |
|
58
|
Wed Jun 19 18:54:00 2019 |
Huan Wang | Fixed | info | lasers and optics | Optical room | amplifier | Onefive output power is 24mW now, and 2.41mW(after
EOM) injected into fiber,
a injection power monitor |
|
|
59
|
Mon Jun 24 16:15:08 2019 |
Huan Wang | Fixed | info | lasers and optics | Optical room | amplifier | I just had a phone call with Jérome
and he told me 2 things :
* Be carefull ! the MightyLaser |
|
|
121
|
Thu Jul 28 13:52:23 2022 |
Aurélien Martens | Fixed | report | utilities | Optical room | chiller for CELIA amplifier | The chiller of CELIA amplifier has been
moved from the corridor to the changing room
in front of PLIC. |
|
|
122
|
Mon Aug 8 11:11:28 2022 |
Aurélien Martens | Fixed | report | utilities | Optical room | chiller for CELIA amplifier | today, temperature of the chiller has been
set to 23°C.
measured temperature in the chiller |
|
|
226
|
Fri Nov 29 12:06:05 2024 |
Alice Renaux | Fixed | info | lasers and optics | Optical room | Menhir 160MHz laser | The Menhir 160MHz has been put back in
place on the CELIA amplifier setup. Its output
power is measured to be 150-160mW with an |
   |
|
227
|
Fri Nov 29 16:50:04 2024 |
Alice Renaux | Under Process | info | lasers and optics | Optical room | Menhir 216MHz laser | The Menhir 216MHz laser has been put back
in place on the cavity table. Its output
power is measured to be 160mW with an attenuator. |
 |