Status of commissioning, report also here plots are reports., Page 7 of 13
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
244 Entries
Goto page
Previous
1
,
2
,
3
...
6
, 7,
8
...
11
,
12
,
13
Next
All
ID
Date
Author
Status
Type
Category
Location
Title
Text
121
Thu Jul 28 13:52:23 2022
Aurélien Martens
Fixed
report
utilities
Optical room
chiller for CELIA amplifier
The chiller of CELIA amplifier has been
moved from the corridor to the changing room
in front of PLIC.
122
Mon Aug 8 11:11:28 2022
Aurélien Martens
Fixed
report
utilities
Optical room
chiller for CELIA amplifier
today, temperature of the chiller has been
set to 23°C.
measured temperature in the chiller
123
Mon Aug 8 17:58:32 2022
Ronic Chiche
Fixed
info
lasers and optics
Optical room
Pulse duration measurement before and after CVBG (as a strecher)
I recorded the pulse shape of the MENHIR
216MHz in its fiber injection setup.
the fiber is then connected to the
124
Wed Aug 10 12:51:16 2022
Ronic Chiche
Fixed
report
lasers and optics
Optical room
"ThomX" CELIA Amplifier commissionning
The "ThomX" CELIA amplifier is
installed on the optical table.
I added all the rubber pieces available
125
Thu Aug 11 12:11:48 2022
Ronic Chiche
Fixed
report
lasers and optics
Optical room
"ThomX" CELIA Amplifier commissionning
Beam size at the amplifier output:
to make this measurement, I switched
ON only 1st and 2nd stage.
126
Thu Aug 11 19:27:09 2022
Ronic Chiche
Fixed
info
lasers and optics | detectors and electronics
Optical room
Koheras CW laser lock on FP cavity
I locked the Koheras CW on the FP cavity
but the lock was pretty noisy and very difficult
to acquire.
127
Fri Aug 12 11:46:17 2022
Ronic Chiche
Fixed
info
lasers and optics
Optical room
OEwaves lock and Finesse measurement
this morning, I locked the FP cavity with
the OEwaves CW laser and the "Fred fiber
amplifier" used at 500mA of pump current.
128
Fri Aug 12 17:48:28 2022
Ronic Chiche
Fixed
report
lasers and optics
Optical room
"ThomX" CELIA Amplifier commissionning
this afternoon, with Fabian, we did some
measurements on the 3rd stage.
finally we
129
Fri Aug 19 16:02:33 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation + chiller
Closing series
130
Fri Aug 19 16:03:17 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
Alignment / Table setup
closing series
131
Fri Aug 19 16:03:40 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CVBG stretching / Fiber Injection
closing series
132
Fri Aug 19 16:31:11 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Amplifier output Beam Profile
In preparation to measure the output beam
profile from the amplifier at high power,
I have placed two wedge mirrors just before
133
Fri Aug 19 16:36:18 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
The previous Sbox telescope was dismantled
and the mechanical components cleaned.
its lenses are still in the mounts,
134
Mon Aug 22 18:38:03 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Beam divergence was measured using a method
called "Focal
135
Mon Aug 22 18:39:13 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Amplifier output Beam Profile
Beam divergence after amplifier 4.46 mrad
136
Tue Aug 23 17:37:38 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
I placed a periscope to adjust the high
of the beam from the amplifier output from
~ 10 cm from the table to ~ 15 cm
137
Wed Aug 24 10:39:58 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Telescope / amplifier output
Here is a view of beam propagation in the
optical software : GaussianBeam
the red filled shape is the model
138
Wed Aug 24 10:45:24 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
2 Mirror Setup @ 216.6 MHz
Adding information about the 2 mirror cavity
setup (plan - spherical)
that is currently installed.
139
Tue Aug 30 17:48:39 2022
Ronic Chiche
Fixed
info
lasers and optics
Optical room
2nd stage CELIA amplifier
today, we measured the 2nd stage CELIA
amplifier pump wavelength : 970-990 nm
140
Wed Aug 31 18:14:51 2022
Ronic Chiche
Fixed
info
lasers and optics
Optical room
2nd stage CELIA amplifier
today we did several test with the Dichroic
shortpass mirror (Thorlabs DMSP1000) and
with a 10nm optical filter around 1030nm