101
Wed Jul 6 18:34:12 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
Cavity Lock
Closing the series for the setup
The cavity was only locked @ 133.33
MHz but the Finesse was not measured
102
Wed Jul 6 18:35:38 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Fundamental Mode TEM00
Closing series of 00 mode for FSR @ 133.33
MHz
103
Wed Jul 6 18:37:02 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Divergence of the CW beam after collimator
Closing the series of the telescope for
the beam @ 133.33 MHz
104
Wed Jul 6 18:39:25 2022
Manar Amer
Fixed
report
lasers and optics | vacuum
Optical room
SBox Finesse at 216.6625 MHz
Max Finesse obtained @ 4 mirror setup was
~ 19 300
With M1 from ThomX , M2/M3/M4 from
105
Wed Jul 6 18:39:38 2022
Manar Amer
Fixed
report
lasers and optics | vacuum
Optical room
SBox Finesse at 216.6625 MHz
106
Wed Jul 6 19:57:17 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
2 Mirror Setup @ 216.6 MHz
The SBox cavity setup was changed to have
only 2 mirrors M1 plane and M2 spherical,
both from ThomX
107
Fri Jul 8 17:09:26 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Images of ThomX mirrors
Under the microscope,
the spherical mirrors show the
deposit of metal dots on the reflecting surface
108
Fri Jul 8 17:10:44 2022
Manar Amer
Fixed
report
lasers and optics
Optical room
Images of ThomX mirrors
Mirror images in the previous log showing
the metal deposit of the coating of the spherical
mirrors
109
Fri Jul 8 17:48:48 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
2 Mirror Setup @ 216.6 MHz
The cavity was realigned using irises instead
of pinholes, gave a better alignment.
The inside of the box, the spherical
110
Fri Jul 8 19:37:24 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
2 Mirror Setup @ 216.6 MHz
Update for Finesse measurement, The cavity
was put under vacuum ~ 1.1*10^-1 mbar
and the alignment and coupling
111
Tue Jul 12 10:07:05 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
FSR change & Finesse Measurements
The FSR of the 2 mirror (plan-spherical)
Cavity was adjusted from 210 MHz to reach
216.643 MHz
112
Tue Jul 12 10:19:30 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
FSR change & Finesse Measurements
Yesterday evening the cavity was Vacuum
pumped up to pressure of 5.5*10^-2 and locked
changed FSR to be 216.662 MHz and
113
Tue Jul 12 14:41:55 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
FSR change & Finesse Measurements
a Finesse of 30k with the present mirrors
:
T1=120 ppm ;A1=(2.6+1) ppm;
114
Tue Jul 12 18:53:55 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
Installation of D-shaped mirror / Alignment
To prepare for the amplifier. I installed
the D-shapped mirrors after cleaning (using
aceton and ethanol) between the cavity 2
115
Tue Jul 12 19:07:50 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation
The amplifier was installed on the optical
table next to SBox table.
The CVBG that will be used for
116
Fri Jul 22 17:07:32 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation + chiller
Amplifier placed next to the pulsed laser
on the table under the airflow
The output is in free space with
117
Fri Jul 22 17:10:06 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics
Optical room
Installation of D-shaped mirror / Alignment
The D-shaped mirrors are installed properly
and not cutting the path of the beam.
The cavity has been aligned again
118
Fri Jul 22 18:00:21 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
Alignment / Table setup
The current setup of the optical table
attached.
The cavity is aligned and the lock
119
Fri Jul 22 18:19:13 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CVBG stretching / Fiber Injection
Before injecting into the amplifier, the
pulse needs to be stretched using a CVBG,
type attached.
7x
120
Fri Jul 22 18:25:31 2022
Manar Amer
Fixed
report
lasers and optics | detectors and electronics | software
Optical room
CELIA amplifier installation + chiller
The software to control the CELIA amplifier
is on the laptop that was placed in ThomX
bunker.