  Status of commissioning, report also here plots are reports., Page 5 of 13  Not logged in ELOG logo
ID Date Author Status Type Category Locationdown Title Text Attachments
  81   Wed Apr 27 22:13:37 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Finished the alignment of the SBox with
M1 of SBox placed, to be changed to gamma
factory mirror later
 all_mirrorsplaced_after_m2_window.jpg20222704_SBox_alignment.pptx 
  82   Wed Apr 27 22:30:14 2022 Manar AmerFixedreportlasers and optics | utilitiesOptical roomSpincoater - Mirrror cleaning Images of the SBox mirrors cleaned at the
same time when the cavity was aligned.

Directly from the spincoater to
 Images_SBox_Mirrors.pptx 
  83   Mon May 9 18:36:48 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Last week In FP cavity we had all SBox
mirrors including the damaged M1 mirror.

The beating was observed with just
 Beating_TM00_SBox_damaged_M1.jpgBeating_HigherOrder_SBox_damaged_M1.jpg 
  84   Mon May 9 19:05:35 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Today; replaced the M1 SBox mirror with
M1 from gamma factory , following the previous
alignment.
 M2_alignment_M3_pinhole.jpgM3_alignment_M4_pinhole.jpgM4_alignment_M1_pinhole.jpgBeating_TM00_CW_piezo_drive.jpg 
  85   Mon May 9 19:27:35 2022 Manar AmerFixedreportlasers and optics | utilitiesOptical roomSpincoater - Mirrror cleaning PowerPoint shows the detailed images of
all the mirrors before and after cleaning.

Images of SBox mirrors and M1 from
 20220509_Images_SBox_Mirrors.pptxM1GFA.jpgM2FA.jpgM3FA.jpgM4FA.jpg 
  86   Wed May 11 09:19:48 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Yesterday, to find the source of why the
mode is deformed, I tried to rotate the mirrors
to see if there is a change.
 Beating00_after_rotatingM2_2.jpg 
  87   Wed May 11 20:51:28 2022 Manar AmerFixedreportlasers and optics | utilitiesOptical roomSpincoater - Mirrror cleaning Following the observation that when rotating
M2 plan mirror of SBox the deformation position
of the mode changes.
 M2_spare_fb_2.jpgM2_spare_fa_2.jpg20201210_M2_spare_after_cleaning.tif 
  88   Wed May 11 21:10:27 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment M2 Sbox changed to spare. Alignment of
M2 was redone. 

With the help of Ronic , We observe
 TM00_mode.jpgTM01_mode.jpgTM10_mode.jpg 
  89   Tue May 24 21:51:01 2022 Manar AmerFixedreportlasers and optics | utilitiesOptical roomSpincoater - Mirrror cleaning While repeating the alignment, the mirrors
were cleaned using the spin-coater and placed
again.
  
  90   Tue May 24 22:05:48 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment The external and internal alignment was
redone.

External Alignment : the collimator
 7x 
  91   Tue May 24 22:11:40 2022 Manar AmerFixedreportlasers and opticsOptical roomFundamental Mode TEM00The current setup for the SBox has a beam
viewer and 2 photodiodes placed at reflection
and transmission.
 20220524_SBox_Setup.png00mode_CW_piezo_drive.bmp00mode_11mode.bmp 
  92   Wed May 25 17:34:29 2022 Manar AmerFixedreportlasers and opticsOptical roomFundamental Mode TEM00Adding images from the transmission after
the spherical mirrors M3 and M4 window for
a resonating mode inside the cavity.
 beamviwer_transmission_at_M3.bmpbeamviwer_transmission_at_M4.bmp 
  93   Wed Jun 8 10:47:45 2022 Manar AmerFixedreportlasers and opticsOptical roomSBox Alignment Closing Series for Alignment.

Beating observed, beam is in the
locking stages
  
  94   Wed Jun 8 10:58:15 2022 Manar AmerFixedreportlasers and opticsOptical roomFundamental Mode TEM00Images of the Transmitted beam at M2 mirror
at different days. 

The first one was from last week,
 20220530_00_Mode.bmp00_Mode_Beam_Transmitted_Position_drift_due_to_temperature.bmp 
  95   Wed Jun 8 11:10:17 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCavity Lock Start with the cavity lock images attached,
taken from last week, at
start we have a coupling ~ 5%  and started
 Screenshot_2022-05-30_0_125247.png20220530_00_Mode.bmp11.bmp 
  96   Wed Jun 8 11:24:35 2022 Manar AmerFixedreportlasers and opticsOptical roomTelescope - Spacial Matching Divergence of the CW beam out of the collimator
measured after 1 meter to be 


 SBox_Spacial_Matching_Telescope.png 
  97   Wed Jun 8 11:31:47 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCavity Lock Current setup at SBox for locking the cavity

After spacial matching, the coupling
increased to ~ 15 - 20 % 
 20220607_SBox_Setup.pngMa1_Ma2_Horizontal_end-of-day.jpgMa1_Ma2_Vertical_end-of-day.jpg 
  98   Thu Jun 9 19:59:42 2022 Manar AmerFixedreportlasers and optics | detectors and electronics | softwareOptical roomCavity Lock Cavity locked today under vacuum and no
airflow, it is stable over a long time

the alignment was improved and
 00_Mode_Locked_Under_vacuum.bmpMa1_Ma2_Horizontal_end-of-day.jpgMa1_Ma2_Vertical_end-of-day.jpg 
  99   Tue Jun 21 23:52:28 2022 Manar AmerFixedreportmechanics | lasers and optics | detectors and electronicsOptical roomMenhir Pulsed LaserThe SBox Length (FSR), was changed to match
the repetition rate of the Menhir
pulsed laser Frep = 216.6625 MHz
 MENHIR_injection_into_fiber.jpgSBox_M.jpg20220620_SBox_MENHIR.pptx 
  100   Mon Jun 27 08:52:46 2022 Manar AmerFixedreportlasers and optics | vacuumOptical roomSBox Finesse at 216.6625 MHzThe Sbox currently has the injection from
ThomX installed T ~ 120 ppm , M2 planar from
Sbox spare and M3 / M4 spherical mirrors
 20220624_SBox_MENHIR.pptx 