Entry   HG, SC; Faisceau injecteur  RF_2025_05_20_0dB_consigne_temp28.45.pngvide_temp_2025-05-20_17-43-40.png
14h : Faisceau, charge max = 200pC à 300 position attenuateur laser

15h : beaucoup de claquages dans le canon, modulateur qui interlocke, et interlock vide en rouge sur le MPS

Le canon n'est plus adapté et impossible de re-démarrer meme à 3dB
Entry   Entered by Super Team from 134.158.195.141 on Mon May 19 17:56:57 2025; Data : Sole scan, Q scan, random linac Yag_TL1 
Today's data :
- coil scan (+ images)
- Q3 scan
Entry   VM, IC, DN ;  
08h20 ThomX was started: Modulator, frig, laser

08h27 Chillers were started, cycling all magnets

10h50 HV is 'ON'
Entry   KD; shift du 15 mai 2025 Size_vs_SolenoScan_18-03-13.pngSize_vs_SolenoScan_18-12-12.png
7h50: mise en chauffe à distance (Modulateur, chiller/frigo, laser)

cyclage aimant bug ==> impossible de cycler les aimants, trop de plantage

Soleno scan : Iris 0.5 mm --> on retrouve la symétrie : le laser donne cette dissymétrie ... 
Entry   KD, HG; shift du 14 mai 2025 9x
8h: mise en chauffe à distance (modulateur, frigo/chiller, laser)

10h30: on a du faisceau atténuateur à 260pas pour 100pC.

Nouveau point cathode : [H,V] = [4.81, 3.62]
Entry   KD, HG, ME ; shift du 13 mai 2025 : conditionnement GUN 6x
8h: mise en chauffe à distance modulateur et frigo/chiller

Demarrage à 10H
HV 1215V
Entry   Entered by Super Team from 134.158.195.141 on Mon May 12 16:26:53 2025; Conditionnement 7x
Demarrage du conditionnement :

Température : 30.90 pour accorder le canon
20dB 19dB ..... 15.5dB à 16h20: vide travaille cf plot. 
Entry   Entered by Kevin Dupraz from 109.222.35.58 on Mon May 12 07:58:41 2025; shift du 12 mai 2025 : conditionnement GUN Screenshot_from_2025-05-12_08-02-15_vacuum_problem.pngScreenshot_from_2025-05-12_14-36-54.png
8h: mise en chauffe modulateur et frigo/chiller

- problème de lecture de vide (visible sur toute les jauges LINAC)

--> Réparé : un switch (de fin de ligne etait on et mis OFF)
icon4.gif   VS, AG, KD; changement PhotoCathode 6x
lundi 5 mai : remise à l'air et démontage de l'ancienne cathode (Cu)

- Le faiscea laser est remis sur les réferences et le faisceau passe au travers de la cathode trouée (OK pour le Mg). NB. Le trou
de la cathode trouée fait la taille de la pastille de Mg. (cf. Photos)
Entry   Entered by Marie Jacquet from 134.158.89.45 on Fri May 2 17:47:04 2025; Commissioning Spectro Vortex/FalconX setup.jpeg20250502_Pulse_charac_Capture.PNG20250502_acquisition_Capture.PNG
1) Setup (pj 1) : petite sphere "jaune" devant le vortex (je ne sais pas en quoi elle est faite, peut-etre un laiton ...)

2) "pulse characterisation" (pj2) --> fichier  20250502.ini  cree

3) Acquisition avec 20250502.ini (pj3) 
Entry   VM;  
08h22 ThomX was started: modulator, frig, laser

08h28 Chillers was started, all magnets cycling

09h45 HV is 'ON'
Entry   VC, DN, MJ, IC, VM; Recherche position image camera MRSV 2025-04-30_16-23-33_MRSV_fwhm_trends.png2025-04-30_17-14-26_total_beam.png2025-04-30_17-15-03_coupe_moitie_basse.png2025-04-30_17-15-54_coupe_moitie_haute.png
Start chauffage 9H

There were some problems: the phase section motor was in the wrong position, although the readings were normal; The rear door of the septum
power supply was not fully closed.
Entry   Entered by Super Team from 134.158.195.141 on Tue Apr 29 11:02:38 2025; Data taking for ML  
Demarrage ACQ pour ML 

Random : Phi_GUN, Phi_Section, ST1, ST2, Solenoid, QP1, QP2, QP3 
Mesures : BPM1, BPM2, Charge, Laser, YagTL, Intensité Ecran 
Entry   Entered by Super Team from 134.158.195.142 on Mon Apr 28 17:13:39 2025; Hayg / Thibault 
 

Position moteur actuels (on ne les vois pas dans le log du shift Sophie/Vincent)

Col-01 Mot-01 : 1.213
Entry   VM, IC, ND; Measurements 18/4 Screenshot_from_2025-04-18_09-42-24.pnginjection_sequence_blank2ms_009.pnginjection_sequence_blank2ms_003.pnginjection_sequence_blank2ms_002.pnginjection_sequence_blank2ms_036.png
08h21 Thomx Started: modulator, frig, laser

08h27 Chillers started, cycling all magnets

09h32 HV is 'ON'
Entry   VM, RC, DN, ND;  health_check_Vide_Jauge_2025_04_17_09_25.pnghealth_check_RF_Redpitaya_2025_04_17_09_27.pngbpm_1_vs_kicker_second.pngviewer_2025_04_17_12_44_06.png20250417_175615.jpg
08h15 Start Thomx: modulator, frig, laser

08h21 Chillers started, all magnets cycling

Filesystem very slow
Entry   Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025; Beam study  Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_Charge.pngCoil_Scan_BeamSize_Align_Ring_Ref_50MeV_YagTL1.pngSize_vs_SolenoScan_14-07-49.pngQ_vs_SolenoScan_14-07-50.pngFigure_2025-04-16_163405.png
Mesures du jour : prendre des images pour refaire le calcul d'émittance en tenant compte des corrélations pour reconstruire le 4D du
faisceau.
 
Entry   KD; shift du 15 avril 2025 
8h10 : mise en chauffe de la machine à distance (modulateur, chiller/frigo, cyclage)

* redémarrage des DS client5

* impossible de lancer le laser (il faut intervenir en local)
Entry   VC SC HG; shift du 11 avril  align_soir.png
demarrage chauffage 8hh50

faisceau sur Yag 1 depuis 1heure....

le script d'alignement solenoide est introuvable!!!!! 
Entry   KD, HG, ND, ML, VM; shift du 10 avril 2025 Screenshot_from_2025-04-10_17-10-09.pngScreenshot_from_2025-04-10_17-09-56.png
9h : mise en chauffe en remote (frigo/Chiller, Modulateur, laser, cyclage)

 

*** programme ***