VM;
|
08h22 ThomX was started: modulator, frig, laser
08h28 Chillers was started, all magnets cycling
09h45 HV is 'ON' |
VC, DN, MJ, IC, VM; Recherche position image camera MRSV   
|
Start chauffage 9H
There were some problems: the phase section motor was in the wrong position, although the readings were normal; The rear door of the septum
power supply was not fully closed. |
Entered by Super Team from 134.158.195.141 on Tue Apr 29 11:02:38 2025; Data taking for ML
|
Demarrage ACQ pour ML
Random : Phi_GUN, Phi_Section, ST1, ST2, Solenoid, QP1, QP2, QP3
Mesures : BPM1, BPM2, Charge, Laser, YagTL, Intensité Ecran |
Entered by Super Team from 134.158.195.142 on Mon Apr 28 17:13:39 2025; Hayg / Thibault
|
Position moteur actuels (on ne les vois pas dans le log du shift Sophie/Vincent)
Col-01 Mot-01 : 1.213 |
VM, IC, ND; Measurements 18/4    
|
08h21 Thomx Started: modulator, frig, laser
08h27 Chillers started, cycling all magnets
09h32 HV is 'ON' |
VM, RC, DN, ND;    
|
08h15 Start Thomx: modulator, frig, laser
08h21 Chillers started, all magnets cycling
Filesystem very slow |
Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025; Beam study    
|
Mesures du jour : prendre des images pour refaire le calcul d'émittance en tenant compte des corrélations pour reconstruire le 4D du
faisceau.
|
KD; shift du 15 avril 2025
|
8h10 : mise en chauffe de la machine à distance (modulateur, chiller/frigo, cyclage)
* redémarrage des DS client5
* impossible de lancer le laser (il faut intervenir en local) |
VC SC HG; shift du 11 avril
|
demarrage chauffage 8hh50
faisceau sur Yag 1 depuis 1heure....
le script d'alignement solenoide est introuvable!!!!! |
KD, HG, ND, ML, VM; shift du 10 avril 2025 
|
9h : mise en chauffe en remote (frigo/Chiller, Modulateur, laser, cyclage)
*** programme *** |
KD; shift du 8 avril 2024  
|
10h10 : mise en chauffe machine (frigo/chiller, modulateur, laser) + remise de SF6
recette sauvé pour 7MeV jusqu'à TL/SST.03, phase section 53° @34dB (canon energie max @ 3dB)
==> il faut jouer sur le klystron car trop de puissance RF dans la section (atténuation max ~38dB @ 2460pas) |
ML, VM, DN, ND; Prise de données 4/04 10x
|
8:59 Mise en chauffe
9:15 Installation laser alignement SR
10:30 Problem Astor et Jive (see screenshot) |
KD; shift du 3 avril 2025
|
| 9h: mise en chauffe machine en remote (Modulateur, frigo/chiller, laser, cyclage aimants). |
Entered by Marie Jacquet from 88.165.97.136 on Wed Apr 2 08:24:51 2025; Programme mercredi 2/04
|
9h: mise en chauffe machine depuis bureau (Modulateur, laser, frigo/chiller, cyclage aimants)
Problème sur les Dipôles TL et EL (erreur à acquitter sur place)
Erreurs acquittees |
VM, IC, DN;
|
08h42 Start ThomX: Morulator, firg, laser
08h47 Chillers, cycling all magnets
10h40 HV is 'ON' |
VM, IC, RC;   
|
08h00 ThomX started by Maher
09h50 Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.
ThomX configuration changed to 'Linac'. |
Entered by Super Team from 134.158.195.141 on Mon Mar 31 09:46:30 2025; Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.
|
09h45 Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.
10h03 Fixed!
10h22 From time to time TO-V3 and EL-V1 close. Septum vacuum is 2.6e-10 |
Entered by Super Team from 134.158.195.141 on Fri Mar 28 14:26:38 2025; Prep faisceau pour lundi
|
12h47 Mise en chauffe modulateur
Zone de stockage en rouge
Mise en route frigo, chillers : ok |
Entered by Marie Jacquet from 134.158.89.45 on Fri Mar 21 17:57:25 2025; 21 mars - Mesures X-rays - Bravin & co
|
Det Photonic fond de la X-hutch
Tomo : un kiwi sur hexa echantillon
2D : Fil de pêche sur hexa mono – Single
shot
2D : Fil de pêche |
VM; Modulador problem
|
08h38 There is problem with the Linac modulator
08h55 Fixed with Maher help |