KD MJ RC DN; Position Horiz FPC ("spectres dromadaires")
|
7h55: mise en chauffe en remote (modulateur, cyclage, laser, frigo/chillers)
==> plus de trig sur la machine (sur toute la plage de scan de la phase stab du laser PC). ==> OK, je suis une truffe le laser était
"off" |
VM, ND, VC;
|
08h35 Warm-up ThomX: Modulator, Laser, Fridge
08h41 Chillers were started, cycling all magnets.
09h40 HV is ON |
IC, VM, ND;    
|
08h29 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.
10h48 Beam is in the ring after resolving a lot of problems. The receipt loaded: recipe_recipe_LI_TL_RI_all_20260115_18_10_34.txt, with Linac-Tl |
IC; Ring studies    
|
08h56 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.
Low SF6 pressure. |
VM, RC, MJ, IC; Test Soleno=245, optic issue de la simu Julien Matching
|
08h36 Warm-up ThomX: Modulator, Laser, Fridge
8h41 Chillers were started, cycling all magnets.
09h40 HV is ON |
KD; shift du 13 janvier 2026
|
7h55 : mise en chauffe en remote (chiller/frigo, laser, modulateur, cyclage)
9h : démarrage, pas de soucis au niveau du trig
16h30 : demarrage anneau pour recette 230A |
Hayg; Monday Shift : Q-scan + Data (Active Learning)
|
Mesures du jour :
Quad scans à QP1 pour voir d'autres points de fonctionnement avec une matcihing anneau correct (Figure de merite <1 ?)
autres
points Solé
autres points Q > 100pC (jusqu'à 300pC)
Active learning pour données |
KD, IC, VM, RC; shift du 9 janvier 2026 6x
|
8h05: mise en chauffe en remote (modulateur, frigo/chillers, laser, cyclage)
09h06 HV is ON
10h10 receipt recipe_recipe_LI_TL_RI_all_20260108_17_34_30.txt (242 A BMAD). RF gun phase 226 dg. Sect Att. 2.457 dB, sect. phase 214 dg. |
IC, HG, RC, DN, JM; Test of the new receipt from BMAD Isol = 242 A 13x
|
8h55: mise en chauffe (modulateur, frigo/chillers, laser, cyclage)
10h20 HV ON
Start with the receipt nominal. problem with the RF gun laser camera. Solved. |
VM DN MJ KD; shift du 07 janvier 2026 16x
|
7h55: mise en chauffe en remote (modulateur, frigo/chillers, laser, cyclage)
11h25 HV is ON
Archivage lance |
KD; shift du 06 janvier 2026 
|
8h: mise en chauffe en remote (cyclage, modulateur, frigo/chillers, laser)
problème lancement cyclage RI-C1: QP.04, QP.09 et QP.10
Sole 238 |
MJ; shift twiss Q1 versus soleno
|
Modulateur en chauffe
Alarme rendant impossible clim casemate . Maher envoie un mail a urgencevc
Check Sf6 : 2 bar ==> Appel JN ==> ajout sf6 2.5 bar |
KD; shift du 19 décembre 2025
|
7h20: mise en chauffe en remote (frigo/chiller, laser, modulateur, cyclage)
*** Programme *** |
DN, IC, HG, KD, MJ, and Co; X-ray measurement/characterization campaign
|
The machine was warmed up remotemy
The FPC is ready. The laser is locked.
9h Start HV |
KD, IC, MV, DN,; shift du 17 décembre 2025
|
7h15: mise en chauffe en remote (chiller/frigo, laser, modulateur, cyclage)
8h33 HV ON
09h30 Beam is in the ring 40 MeV, RF 100 kV ==> 150 kV I3+I4 up to 14000 pA. Vertical step at IP from -2 mm to +2 mm. MRSW 24.5 pix. Receipt recipe_recipe_LI_TL_RI_all_20251217_09_17_49.txt |
KD, IC, RC,VM ; shift du 16 décembre 2025 
|
7h10: mise en chauffe en remote (chiller/frigo, laser, cyclage, modulateur).
à cause du faible flux d'hier et de la non répétabilité des recettes de la semaine précédente :
* essaie avec la section à 28.4°C (seule condition différente de mardi dernier) |
KD MJ; shift du 15 décembre 2025
|
8h: mise en chauffe en remote (chiller/frigo, laser, modulateur, cyclage)
* cannot enter to the ring with the recipe "40_MeV_Enough_Good_20251211_14_07_28", probably due to mis alignment procedure of the QP1-QP3.
* reset de TL steerers with the recipe "40MeV_20250401_15_09_50", first turn ok but no storage. |
VM, IC; Check of the 70 MeV with MRSV, Ring studies    
|
08h40 Warm-up ThomX: Modulator, Laser, Fridge
8h45 Chillers were started, cycling all magnets.
10h10 HV is ON |
VM, IC; 40 MeV operation 12x
|
8h37 Warm-up ThomX: Modulator, Laser, Fridge
8h44 Chillers were started, cycling all magnets.
9h49 HV is ON |
Entered by Super Team from 134.158.195.141 on Wed Dec 10 10:45:16 2025;
|
8h30 : machine started on remote
50 MeV operation.
Problem with Yag-TL camera |