ID Date Author Status Type Category Important Subject Icon Text Attachments
  1103   Thu Jul 17 08:08:41 2025 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 17 juillet 2025 8h05 : mise en chauffe en remote (modulateur,
laser, frigo/chiller, cyclage)

 
  
  1102   Wed Jul 16 09:09:13 2025 KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 16 juillet 2025 9h07 : Mise en chauffe (frigo/chiller,
modulateur, laser, cyclage)

FPC laser stability and lock observation.
 Sautes_de_Charge_2025-07-16_14-13-34.png 
  1101   Tue Jul 8 08:02:52 2025 KD, ND, RCUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 08 juillet 2025 8h: mise en chauffe en remote (modulateur,
frigo/chiler, laser, cyclage)

 
  
  1100   Mon Jul 7 08:04:06 2025 KD,ND, RC,DNUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 07 juillet 2025 8h: mise en chauffe en remote (frigo/chiller,
modulateur, laser, cyclage)

9h14: Demarrage faisceau
  
  1099   Fri Jul 4 12:02:34 2025 ND Shift summaryTL Prise donnees 4/7 Les aimants et les chillers etaient restes
allumes.

11h59 Mise en chauffe
 temp_vs_time.pngtp2spX_vs_time.pngtp2spY_vs_time.pngpos_TL2_spX_vs_temp.png 
  1098   Thu Jul 3 08:06:05 2025 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 03 juillet 2025 8h05: mise en chauffe en remote (frigo/chiller,
laser, modulateur, cyclage)

9h: problème avec le DEG04
 2025-07-03_12_56_24_el_dg_sst_01-ccd_01_RAW.png2025-07-03_10_40_07_OBL_DG_MRSV_01-CCD_01_RAW_0.pngspectre_70keV.bmp 
  1097   Wed Jul 2 14:45:20 2025 Entered by Super Team from 134.158.195.141 on Wed Jul 2 14:45:07 2025Under ProcessInfoLI   Vérif position laser photocathode
:

--> bouge de 1mm en Y et 0.2
  
  1096   Tue Jul 1 08:15:08 2025 KD MJ VC DN RCUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 01 juillet 2025 8h15: mise en chauffe distance (chiller/frigo,
modulateur, laser, cyclage)

9h45: modulateur ok  
 orbit_recette_flat.png 
  1095   Fri Jun 27 08:49:36 2025 SC, ND LinacLI | Linac Commissionning   8h49 allumage modulateur, chiller, laser

10h00 Beam ON

Prise de données Cf images
 pos_TL2_vs_phase_RF.pngpos_TL2_spX_vs_temp.pngtp2spX_vs_time.png 
  1094   Thu Jun 26 08:55:15 2025 IC, DN, RC, HG, MEUnder ProcessShift summaryRing Commissioning Improve ring for X-rays  Goal: Vertical orbit and angle
at the IP with I3 and I4 X-ray signals

8h55 Switch ON the modulator and
 7x 
  1093   Wed Jun 25 18:47:20 2025 Entered by Super Team from 134.158.195.141 on Wed Jun 25 18:47:07 2025Under ProcessShift summaryLI Laser position icon1.gif New laser position :

5.041
4.448
  
  1092   Tue Jun 24 18:33:20 2025 Entered by Marie Jacquet from 134.158.205.58 on Tue Jun 24 18:33:05 2025 Shift summaryLI | TL | LE | Ring Spectres Bazin - Config "cone en plomb" - + enregistrement trends parametres machine (e- et X) *** Spectres
des 4 Echantillons Bazin + Backgroung avec
:
 10x 
  1091   Fri Jun 20 08:23:10 2025 KDUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 20 juin 2025 8h20: mise en chauffe en remote (frigo/chiller,
modulateur, laser, Cyclage)

IHM cyclage plante toujours au
 6x 
  Draft   Thu Jun 19 08:10:54 2025 KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 19 juin 2025 8h: mise en chauffe en remote (frigo/chiller,
modulateur, laser, cyclage)

***
  
  1089   Wed Jun 18 12:45:49 2025 Entered by Super Team from 134.158.195.141 on Wed Jun 18 12:45:28 2025Under ProcessInfoLinac Commissionning Linac measurement + phase +  
Phi Qmax ; 324° : Phi Emax
: 274°
Qmax : 70-80 pC (Att
: 290°) and 300 pC (Att : 420°)
Recipt
 6x 
  Draft   Fri Jun 13 08:41:04 2025 VM,ICUnder ProcessShift summaryLinac Commissionning   08h40 ThomX was started: Modulator,
Frig, Laser

08h45 Chillers were started,
 health_check_Diag_charge_wavecatcher_2025_06_13_10_13.pngScreenshot_from_2025-06-13_11-11-22.pngScreenshot_from_2025-06-13_14-31-57.pngScreenshot_from_2025-06-13_14-31-45.png 
  1087   Wed Jun 11 08:46:58 2025 Entered by Marie Jacquet from 134.158.205.17 on Wed Jun 11 08:46:44 2025 Shift summaryLI | Ring 2025-06-04 Fluo-spectro : Spectre du 2025-06-04    spectres_20250604.pdf 
  1086   Wed Jun 11 08:12:28 2025 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 11 juin 2025 8h10: mise en chauffe à distance
(modulateur, frigo/chiller, cyclage aimant,
laser)
  
  1085   Tue Jun 10 18:39:54 2025 SC, HGUnder ProcessShift summaryLI | TL Emittance + data taking  phi max :  220 deg Qmax = 120 pC

Laser new position : 4.714
/ 3.524
 Emittance_QP7_phiS_222.pngEmittance_QP7_phiS_220.pngEmittance_QP7.pngEmittance_QP3.png 
  Draft   Fri Jun 6 08:17:31 2025 MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025Under ProcessShift summaryRing Commissioning   08h15 ThomX was started; Modulator,
Frig, Laser

08h21 Chillers were started,
 ThomX_PhaseChargeScan20250606.pngThomX_FPC_TableVerticalScan20250606.png 