Wed Mar 18 07:58:19 2026 |
KD, VM, MJ, RC, DN | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 18 mars 2026 | | 8h: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
*** Programme : Mesure spectre et monochromateur à 61.5MeV (70MeV si le temps le permet)
61.5 MeV
09h35 HV is on
photocathod laser phase 62 dg. The receipt 61p5MeV_20250703_12_56_55.txt loaded, going to 61.5 MeV (interlocks)
10h13 Beam is on TL/SST02. Sect. att. 0.992 dB, sect. phase 236 dg.
10h30 Aligned with QP1 - QP3, linac steerers: H [-0.2 -3.02], V [-2.55 3.22]
11h05 Beam is in the ring W/O RF with all ring correctors set to zero
RF 100 kV storage is good, but can't correct the orbit at 61.5 MeV : le faisceau est presque hors du tube ==> Try to go to 70 MeV
70 MeV
13h20 RF processing the section on 25 pps by increasing pulse length from 1 us to 3 us
13h56 70 MeV, Linac steerers H [0.21 -3.75], V [-2.84 3.33], sect. att 0.18, phase 255 dg. laser phase 56 dg. (On the base of 70_MeV_Vert_tune 0.66_good_20251212_13_56_38.txt)
16h17 recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt saved, screenshots, RF 100 kV, phase -36 dg., Freq. 500.031645 MHz
L'orbite n'est pas la meme que pour 50 MeV ==> Checks spectres dromadaires a V+40
X_fpc = -1.5 / -1.3 / -1.7 / -1.9 / -1.1 mais on a oublie d'ajuster la phase a chaque fois .... meme phase (3.0 V)
X_fpc = -0.9 / -0.7 / -0.4 / -0.2 / -0.5 en ajustant la phase a chaque fois
Cf les 2 screenshots "Spectre 70 MeV"
On se place a X_fpc = -1 mm (pas top mais dans l'urgence on se met la)
Fente2 centrees a l'oeil : [H , V] = [11 , -23]
Prise de spectres a +/- 10 en H et V (a voir ce que ca donne offline)
17h56 ThomX was stopped |
|
Draft
|
Tue Mar 18 07:56:38 2025 |
KD, IC, RC, DN, VM | Under Process | Shift summary | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 18 mars 2025 - Mesure tailles transverses H et V de la source | | 7h55: mise en chauffe en remote (modulateur, laser, frigo/chiller, cyclage)
*** programme ***
- préparation de la machine pour la seconde session d'imagerie (du 19 au 21 mars)
- mesure et optimisation de la longueur de paquet dans le linac
-----------------------------------------------------------------------------
09h20 HV is 'ON'
09h30 RF gun phase is 10 dg., Sect Phase is 209 dg. Sect Att. is 2.57 dB, Charges: -107 pC
09h45 the modulator was set to the standby mode. Access to the bunker
Mesures X-rays in X-Hutch
** Verification Photonic Science avec le cable "Soleil" : ok
** Mesures tailles transverses source (H et V):
Fermeture partielle des fentes 1
Det Photonic sur bras detecteur (a 280 mm du zero hexapode)
Prise d'images des bords de la fentes (a differents voltages cavite RF, de 50 a 280 kV)
19h10 Stop ThomX |
|
1104
|
Fri Jul 18 08:49:22 2025 |
KD | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 18 juillet 2025 | | 8h50 : mise en chauffe de la machine (frigo/chiller, laser, modulateur, cyclage) |
|
1194
|
Wed Feb 18 07:40:44 2026 |
KD | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 18 février 2026 | | 7h40: mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
8h40 HV ON
10h20 recipe_recipe_LI_TL_RI_all_20260218_10_18_05.txt saved ,
15h15 Li/ps/str03-V steers the beam verticaly "-" UP, "+" Down. Li/ps/str03-H steers the beam horizontaly, "+" <==, "-" ==>
16h44 Laser new position : [5.112, 4.423]
Align QP-Linac
Quad scans : depends on camera settings ...
| Sole |
Emit_X |
betaX |
AlphaX |
Emit_Y |
BetaY |
AlphaY |
Camera |
Sole0 |
File |
Charge (pC) |
retard |
rem |
| 230 |
1.31 |
13.8 |
-5.01 |
1.31 |
4.1 |
-1.5 |
0dB |
66.47 |
Scan_QP0117h01.txt |
110 |
10% |
check energy |
| 235 |
1.57 |
11 |
-3.15 |
2.02 |
7.4 |
-2 |
|
|
Scan_QP0117h12.txt |
110 |
10% |
|
| 240 |
2.61 |
11.7 |
-2.83 |
5.52 |
10.6 |
-2.7 |
|
|
Scan_QP0117h16.txt |
110 |
10% |
|
| 245 |
2.06 |
46.9 |
-9.49 |
12.3 |
19.8 |
-3.98 |
|
|
Scan_QP0117h21.txt |
110 |
10% |
|
| 230 |
1.29 |
7 |
-2.5 |
1.23 |
8.5 |
-2.5 |
|
0 |
Scan_QP0117h27.txt |
110 |
10% |
|
| 230 |
1.65 |
12.1 |
-4.46 |
1.26 |
4 |
-1.58 |
|
100 |
Scan_QP0117h32.txt |
110 |
10% |
|
| 250 |
11.61 |
39.3 |
-6.82 |
23.7 |
30.3 |
-4.53 |
|
|
Scan_QP0117h40.txt |
110 |
10% |
|
| 242 |
2.3 |
28.4 |
-5.82 |
6.7 |
20.8 |
-4.26 |
|
|
Scan_QP0117h48.txt |
110 |
10% |
|
| 241 |
1.99 |
21.3 |
-4.49 |
5.34 |
14.7 |
-3.14 |
|
|
Scan_QP0117h52.txt |
110 |
10% |
|
| 238 |
1.57 |
12.1 |
-2.8 |
2.32 |
16.7 |
-4.21 |
|
|
Scan_QP0117h57.txt |
110 |
10% |
|
| 243 |
3.63 |
18.4 |
-3.64 |
9.31 |
18.6 |
-4.09 |
|
|
Scan_QP0118h01.txt |
|
10% |
|
| 230 |
2.41 |
25.2 |
-7.37 |
2.2 |
9.3 |
-3.24 |
|
|
Scan_QP0118h31.txt |
230 |
350 |
check energy |
| 242 |
3.51 |
15.1 |
-3.15 |
5.28 |
20.2 |
-4.63 |
|
|
Scan_QP0118h43.txt |
110 |
350 |
check energy |
| 245 |
5.85 |
16.7 |
-3.51 |
9.21 |
23 |
-4.64 |
|
|
Scan_QP0118h55.txt |
110 |
350 |
check energy |
| 248 |
20.5 |
20 |
-2.85 |
35 |
14.7 |
-2.4 |
|
|
Scan_QP0119h05.txt |
|
350 |
check energy |
Matching from calculated twiss in attached file.
19:10 : End |
|
592
|
Mon Oct 17 09:09:13 2022 |
KD, MJ | Fixed | Shift summary | LI | TL | LE | Linac Commissionning |
|
shift du 17 octobre 2022 | | Redémarrage ThomX :
* remise en pression d'eau sur la boucle principale (légèrement inférieur à 4bars à l'arret).
* PSS HS (écran freezé) ==> rémarrage de l'écran de l'automate (nécessite la clé de l'armoire)
* mise en chauffe du modulateur (9h)
Programme journée :
* essaie d'alignement automatique (laser photoCathode + quad)
* génération d'une recette pour injection dans l'anneau (mesure émittance + énergie)
* Tests correction orbite TL
*********
* L'alignement automatique du laser sur la PhotoCathode semble fonctionner mais est très bruité dû au bruit sur les BPM (~1mm en X)
De plus il y a une saturation sur les BPM (LI et TL/BPM.01 au moins), cf. Screenshot ==> cela doit destabiliser l'alignement automatique.
* Alignement Steerer VS QP, même constat que pour la photocathode. Le bruit des BPM limite la résolution de l'algorithme
* Mesure Alignement QP de la TL ==> manque données BPM pour TL/BPM.04 (mean, std des positions)
|
|
1103
|
Thu Jul 17 08:08:41 2025 |
KD | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 17 juillet 2025 | | 8h05 : mise en chauffe en remote (modulateur, laser, frigo/chiller, cyclage)
*** Programme ***
- prise de spectre fluorescence (échantillon prostate) et amélioration du setup (réduction du bruit de fond)
==> Fait, montage avec du plomb meilleur et faisceau collimé dans le cone en plomb
- mise en place de la diode Calibrée "sans" bruit (écran alu)
==> pas eu le temps de progresser sur ce point |
|
1193
|
Tue Feb 17 07:48:24 2026 |
MJ, KD,VM,IC, RC, DN | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 17 fevrier 2026 | | 7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
Le cyclage de RI-C1/QP.08, RI-C1/QP.11 et RI-C2/QP.03 ne démarre pas tout seul (action nécessaire sur le boutton cyclage de l'élément).
Programme - Etude "IP dromadaire" ==> Scan pos horizontale FPC + phase
Positions FENTES2/HEXA des 2 derniers shifts :
Pos FENTE2 : [H , V] = [-3 , -10.20]
Pos HEXA ech : [Tx , Ty] = [+79 , +31]
10h00 Beam is in the ring W/O RF, -120 pC, receipt saved: recipe_recipe_LI_TL_RI_all_20260217_09_44_16.txt on the base of reference for 50 MeV
recipe_recipe_LI_TL_straight_all_20260217_10_08_07.txt for the linac and the TL stright part
RF 100 kV phase -48.5 dg.
10h35 Standby, Changing the FPC controller
11h23 HV is on
11h40 RCDSon injection
11h59 RF gun phase 23 dg., Sect. Att. 2.39 dB, Phase 230 dg., Charges: (ICT) from -120 to 140 pc, (BPMs) -137, -137, 137, 137 pC
tunes: H 0.166, V 0.71
12h26 tunes: H 0.167, V 0.72. MRSV size is very sensetive to injection settings
At around 2:45 p.m., the power to the ring dipole went out.
16h42 RF 280 kV, phase -50 dg. Streak camera measurements for 100 kV and 280 kV
Orbit bump to change orbit tilt around IP
18h59 Stop ThomX
|
|
981
|
Tue Dec 17 08:09:41 2024 |
KD | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 17 décembre 2024 | | 8h10 : mise en chauffe de la machine (modulateur, laser, frigo et chiller)
9h30: faisceau dans anneau avec 100pC injecté
Problème modulateur (interlock tension) ==> attendre que la perverance déscende en trig à faible tension pendant 1h (Maher a augmenté la valeur du threshold, le problème ne devrait pas revenir)
9h35 HV is 1214 V, RF Gun phase is 176 dg. Sect. Att. 2.578 dB, Phase is 216 dg. Charges -84 pC, -72 pC, -76 pC
10h40 HV 1215 V
13h24 Linc steerers H [2.65 -4.29], V [-1.8 2.07] RF Gun Phase 175 dg. Sect. Att. 2.564, Phase 217 dg. Charges: -117 pC, -117 pC, -127 pC
Several vertical scans were performed for different initial beam charge with X ray flux in async mode
Decay time data taken.
End of shift 18h.
|
|
Draft
|
Wed Dec 17 07:17:06 2025 |
KD, IC, MV, DN, | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 17 décembre 2025 | | 7h15: mise en chauffe en remote (chiller/frigo, laser, modulateur, cyclage)
8h33 HV ON
09h30 Beam is in the ring 40 MeV, RF 100 kV ==> 150 kV I3+I4 up to 14000 pA. Vertical step at IP from -2 mm to +2 mm. MRSW 24.5 pix. Receipt recipe_recipe_LI_TL_RI_all_20251217_09_17_49.txt
10h19 Hor. tune 0.177, sum of TbTsum 2e11. TL/BPM02 X=+3 mm, RF cavity phase 5 dg. Sect Att. 3.967 dB, Sect. phase 197 dg. RF gun phase 222 dg. Charges: -165, -157, -159, -161, -158 pA Laser Att. 300, Sol. 223 A
*** Programme ***
* faire 1 à 2 tomographie à 40 Mev avant de passer aux manips à 70MeV (besoin de flux pour la rapidité d'acquisition)
* passage à 70MeV, mesure de dosimétrie et spectre angulaire |
|
1121
|
Tue Sep 16 12:11:42 2025 |
KD | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 16 septembre 2025 | | 12h: mise en chauffe (modulateur, frigo/chiller, laser, cyclage)
==> plantage IHM cyclage (2fois)
12h15: Stop machine ==> pas besoin pour la CFP
*** Programme CFP *** |
|
Draft
|
Thu Oct 16 07:37:52 2025 |
KD, IC, VM | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 16 octobre 2025 | | 7h30: mise en chauffe en remote (chillers/frigo, laser, cyclage)
==> impossible de passer en Standby sur le modulateur ==> mail envoyé à Maher.
8h30 We inspected the modulator, made the rondes. The error (status 8 bit) remains. Need for help from Maher. problem: Modumator PSS.
09h12 Maher started the modulator (there was problem with cooling)
10h30 HV is ON
10h44 RF Gun phase is 228 dg Laser Att. 280, Charge device does not work properly
11h18 RCDS on injection, Beam is in the ring
11h20 Modulator went to OFF then start to warm-up
The RF cavity DS can not read ring RF frequency
12h28 HV ON
Restarting the beam
Working on the WP 50 MeV, orbit correction after dipole rotation. Recette:
TL and EL tuning and measurement of the energy spread.
Beam cut issue in EL investigations.
Optics studies. LOCO.
19h50 STOp THOMX |
|
1102
|
Wed Jul 16 09:09:13 2025 |
KD | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 16 juillet 2025 | | 9h07 : Mise en chauffe (frigo/chiller, modulateur, laser, cyclage)
FPC laser stability and lock observation.
Change the RF frequency to work at 50 MeV. Tuning of the FPC.
The recette "Flat orbit"
During the day we observe the very big variation of the synchrotron oscillation amplitude (very difficult to find the ring working conditions) in the ring, sudden charge variation.
14h40 measurement of the synch osillations for 200 injections
Amplitude deviation = 33.3028%
Frequency deviation = 0.91508% (267.9607 kHz)
Phase deviation = 46.4524 degrees orbit
Average position deviation = 1.4408%
Vertical orbit correction studies
|
|
1170
|
Tue Dec 16 07:18:46 2025 |
KD, IC, RC,VM | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 16 décembre 2025 | | 7h10: mise en chauffe en remote (chiller/frigo, laser, cyclage, modulateur).
à cause du faible flux d'hier et de la non répétabilité des recettes de la semaine précédente :
* essaie avec la section à 28.4°C (seule condition différente de mardi dernier)
8h10: démarrage.
chargement de la recette du "recipe_recipe_LI_TL_RI_all_20251209_17_54_51.txt", rien sur la caméra sst, on retrouve les paramètres de mardi (3.74dB, 210°C phase section)
image SST vraiment décalé ==> quelques chose à bougé sur la machine ? ==> réalignement quads
** après réalignement et ajustement (phase + atténuateur)
e-:
attenuateur section : 3.77dB
phase section : 214°
chiller: 28.4°C
Freq: 500.11851 MHz
phase shifter manuel : 8600
longueur paquet pas assez de MRSV pour la mesure
10h43 Results: T_sect. 30dg.C (consigne 29.2), laser spot position: 4.714 H, 3.524 V; starting from the receipt recipe_recipe_LI_TL_RI_all_20251211_14_07_28.txt
RF gun phase 222 dg., Sect. Att. 3.987, phase 197 dg. TL/BPM02 X= +2 mm, Linac steerers: H [0.97 -3.6], V [-3.0 3.9], Charges (BPMs): -115, -109, -112, -112, -112 pC,
Beam in the ring after RCDS on TL RF 100 kV, phase 9.0 dg. MRSV 27 pix, (sometime 22 pix). RCDS on ring V cor. X I3+I4 up to 12000 pA but with vertical step at IP ( recipe_recipe_LI_TL_RI_all_20251216_10_41_50.txt)
10h58 Went to the receipt recipe_recipe_LI_TL_RI_all_20251216_10_09_21.txt to have more flat vertical orbit (4000 pA after FPC table scan)
QUAD cycling
11h30 We reoptimized the vertical orbit to have smaller angle. I3+I4 ~7-8 kpA Receipt: recipe_recipe_LI_TL_RI_all_20251216_11_29_31.txt (MRSV 24 - 26 pix, Hor. tune 0.2 at maximum flux)
18h20 Laser Att ==>297 ,charges:-159,-152,-157,-156,-155 pC, Solenoid 225 A, Sum of TbTsum 2e11, from 15e11, MRSV 35.8 pix, I3+I4 about 8000, then FPC desynchronized.
18h43 Stop ThomX |
|
817
|
Wed Nov 15 09:13:06 2023 |
KD, MJ, RC | Under Process | Shift summary | LI | TL | LE | Ring | Laser | Opt | SY |
|
shift du 15 novembre 2023 | | 9h : mise en chauffe de la machine
12h: intervention Iryna et Slava pour un meilleur stockage dans l'anneau (recette semaine passé)
Recherche de la phase et du bucket Laser/e-
- X trouvé (cf. screen shots et datas) :
* bucket Laser/trigger = 21.5ns (visu au scope)
* Dephaseur 500MHz (ER/CA/RAC.05-API.AO1) : 5.3 V (à affiner)
* Cavité trop instable avec le lock sur la fréquence RF (délock en moins de qq minutes)
*** Passage dans la EL (uniquement jusqu'au BPM) avec :
qp1 qp2 qp3 = 1.5 -2.6 0.7
kicker 5840 V retard -7.96
dpi 0.8 A
dp 160.1 A
--> TBTSUM ne peut pas etre utilise pour estimer la charge entrante anneau / sortante anneau car : TBTSUM sortant > TBTSUM entrant (cf screenshot de 15h44)
*** Mesure de la taille e- a l'IP avec table FPC - Fin de journee, a voir si ces mesures permettent d'extraire taille e-
*** Remarques ***
- Beaucoup de claquage au niveau du modulateur/Klystron (cf. TL/BPM.02 trend)
*** Programme ***
- Optimization du flux de rayons X (ajustement phase/synchro, ajustement position laser)
- passage dans la Ligne d'Extraction |
|
1070
|
Thu May 15 07:54:16 2025 |
KD | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 15 mai 2025 | | 7h50: mise en chauffe à distance (Modulateur, chiller/frigo, laser)
cyclage aimant bug ==> impossible de cycler les aimants, trop de plantage
Soleno scan : Iris 0.5 mm --> on retrouve la symétrie : le laser donne cette dissymétrie ...
100pC et 150 pC
*** Programme ***
- refaire du faisceau de rayons X.
- Optimisation de l'injection (haute charge et/ou nouvelle lattice, cf. Viktor) |
|
996
|
Wed Jan 15 08:16:32 2025 |
MJ KD VC HG | Under Process | Shift summary | Aimants | Linac Commissionning | Ring Commissioning |
|
shift du 15 janvier 2025 | | 8h15 : mise en chauffe de la machine à distance (modulateur, laser, frigo, chiller)
faisceau Linac et TL non déviée => manip pour la comphéension des sauts.
Pos laser H4.374 V3.36
Phase canon Emax 162
best foc sut Li YAG1 250A
QEmax 130pC
LI Str 1 H 2.38 V -1.9
LI Str 2 H -4.16 V 2.05
phase section (non optimisée) 213
Dipole off
Avec ou sans Q1 à Q3 les saut sont visibles sur TL/BPM1 et TL/SST1
relation courant steerer/pos faisceau TL\BPM1
H
LI str2 +-0.1A => +-500µm position
LI str1 +-0.1A => +-300µm position
V
LI str2 +-0.1A => +-500µm position
LI str1 +-0.1A => +-500µm position
test nB step versus frequence canon
Q beam 25pC
11h27 => freq gun 25Hz 11h37
11h37 => freq gun 1Hz
(Njumps / delta_t) decreased with beam repetition rate --> most likely a charge effect
15h30 Alex fait 3/4 de tour de cle Q1-Q3 (q3 vers le mur, ~0.5-0.7 mrad)
Ca ne semble pas changer grand chose sur alignement q5_q7 ... a verifier + axe q1_q3 a reconstruire
======================
17h: Injection + stockage anneau avec 160.4 I_dip anneau + HIGH Steerers horiz TL
recipe_recipe_LI_TL_RI_good_20250115_17_11_29.txt
Cf screenshot stockage_50MeV_new_align.png
17h25 : injection + stockage anneau
1) sans steerer horiz
2) et avec 159.3 dipoles anneau
--> recipe_recipe_LI_TL_RI_good_20250115_17_28_10.txt
cf screenshots
stockage_50MeV_new_align_159_3_no_steerer.png
tbtsum_compare_160_4_and_159_3-ring_dipole_2025-01-15_17-33-25.png
ST3_storage_No_steerer_dipRING_159_3_2025-01-15_18-24-13.png
BPM_TL_2025-01-15_17-52-24.png
fin de shift
|
|
1169
|
Mon Dec 15 08:06:26 2025 |
KD MJ | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 15 décembre 2025 | | 8h: mise en chauffe en remote (chiller/frigo, laser, modulateur, cyclage)
* cannot enter to the ring with the recipe "40_MeV_Enough_Good_20251211_14_07_28", probably due to mis alignment procedure of the QP1-QP3.
* reset de TL steerers with the recipe "40MeV_20250401_15_09_50", first turn ok but no storage.
* steerers Ring to 0.
12h --> back to previous cathod point (last week tuning was done at that position)
- TEST/HL/ThomX_PhotoCathode/Horizontal_Iris_Position_set : <type 'float'> : 4.714
- TEST/HL/ThomX_PhotoCathode/Vertical_Iris_Position_set : <type 'float'> : 3.524
17h: essaie avec la recette initial de mardi "recipe_recipe_LI_TL_RI_all_20251209_17_54_51.txt"
==> difficile de retouver le TBTsum de mardi, ==> après quelques ajustements (rcds, etc). on retrouve quelques choses de passable
==> MRSV totalement différent: long, étalé et pas au même endroit (à droite au lieu d'être hors écran à gauche)
==> problème de répétabilité. La seule différence est la température de la section.
*** Scan FPC table (~16h) - A l'oeil FWHM ~ 300 microns ==> rms ~ 128 ==> sig_ele_Vert ~ 107 ==> sig_Source_Vert ~ 60 microns
Bilan imagerie du jour :
tres bas flux et faisceau tres instable .==> Pas de contraste de phase visible. On espere que demain sera mieux !
======================================================================================================
*** programme ***
Mesure imagerie X à basse énergie (40MeV)
|
|
656
|
Thu Dec 15 13:11:15 2022 |
KD | Under Process | Shift summary | LI | Laser | Linac Commissionning |
|
shift du 15 decembre 2022, entered from 134.158.195.141 | | 12h : intervention casemate sur laser photocathode.
énergie mesurée sur différents points de fonctionnement :
Sortie Laser : 230uJ
Point de fonctionnement initial : position iris 5.82 / 3.59, ouverture 3 mm, attenuateur 410 mm
Sortie Transport Laser : 190uJ
Sortie Iris : 160uJ Injection canon : 120 uJ
Initial + Mouvement M4 : position Iris 5.42 / 5.39
Injection Canon : 120 uJ
Initial + Mouvement M5 : -50 pas moteur sur M5_MOT.02
Sortie TL : 190 uJ
Injection Canon 110 uJ
==> rien n'explique au niveau de la table PhotoCathode la baisse de charge des jours précédent.
Inspection du hublot d'entrée canon:
* Hublot plein de poussières.
* Nettoyage de la face avant du hublot (acetone + friction seche pour retirer les résidus de l'acetone). Il reste de la poussière sur la face arrière du hublot. ==> intervention nécessaire au niveau du hublot.
* Pas d'impact laser visible sur la surface au niveau du spot laser (quelques goutes et rayure en bas du hublot)
Inspection du miroir de renvoie sous vide impossible.
13h20 : Démarrage faisceau
aucun écran SST et Laser accessible. Erreur dans lors du lancement :
Traceback (most recent call last): File "/data/shared/Interfaces/panneaux//Diags/interface_SST/IHM_SST.py", line 479, in master = SST_Control() File "/data/shared/Interfaces/panneaux//Diags/interface_SST/IHM_SST.py", line 127, in __init__ self.Image_camera = controled_image(save_path = self.attributs["SAVE_PATH"]) # nouvelle version File "/tmp_mnt/data/shared/Interfaces/panneaux/Diags/interface_SST/controled_image.py", line 331, in __init__ self.intensity_setting.setModel(synchro_tools.get_element_delay_tango_name("Diag",self.camera_delay_channel)) AttributeError: 'module' object has no attribute 'get_element_delay_tango_name'
13h25 : mesure de charge Max
Position iris 5.82 / 3.59 : 69pC
Position iris 5.42 / 3.59 : 140pC
Position iris 5.02 / 3.59 : 180pC
==> problème lors de l'injection dans le canon. |
|
Draft
|
Tue Apr 15 08:10:35 2025 |
KD | Under Process | Shift summary | Diag | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 15 avril 2025 | | 8h10 : mise en chauffe de la machine à distance (modulateur, chiller/frigo, cyclage)
* redémarrage des DS client5
* impossible de lancer le laser (il faut intervenir en local)
* 8h40 Timing opérationnel à 10Hz
* |
|
1137
|
Tue Oct 14 08:00:18 2025 |
KD | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 14 octobre 2025 | | 7h55: mise en chauffe en remote (laser, frigo/chiller, modulateur, cyclage)
==> Nouvelle interface de cyclage, on ne voit plus la progression ou l'état des éléments. (impossible de savoir si le cyclage à bien fonctionné)
10h: recette chargée 50MeV 20251010_15_48_41
Commentaires machine :
* pour un bon stockage l'énergie n'est pas bonne (157.3A sur TL/DP pour etre à 0 TL/BPM.02), position vertical TL/BPM.02 ~ -4mm (stockage possible avec +- 2A sur TL/DP)
/!\ l'orbite n'est pas "flat" à l'IP (comparaison avec chargement de la recette "50MeV_100pC_flatVERTorbit_withEL_20250717_10_58_38.txt"), l'orbite n'est plus "plate" avec l'ancienne recette.
* probleme dans la EL, le faisceau n'est pas extrait correctement avec la nouvelle recette.
/!\ probleme BPM/EL, le BPM n'affiche plus la position du faisceau !
* comparaison orbite du matin et de l'après midi, l'orbite change en X pas en Y.
* décalage du délais septum de 4us pour mettre l'impulsion des kicker à peu pres au sommet de l'impulsion ==> il faut désendre le septum de ~ 2V dans ce cas (97.13V --> 95.33V)
** recette sauvée sous : 50MeV_100pC_MRSV_20251014_18_22_53
* mise à jour du DS "DS_Ring_RF" pour faire les changement de fréquence anneau et phase au meme endroit.
*** Prise de donnée ***
- échantillon chocolat : le plus riche en Cd ne fait pas appaitre de pics !