1135
|
Fri Oct 10 09:20:34 2025 |
ND, VM | | Shift summary | Diag | SY |
|
Prise de données 10/10 | |
9:00 Mise en chauffe
9:20 Intervention de deux personnes de Dalkia dans l'igloo.
9h30 Cyclage aimants
10:00 Info: pas de clim laser aujourd'hui (intervention Dalkia en cours)
Etude des coups manqués en fonction de la phase du dephaseur rigol.
12h00 HV is ON at 1215 V
12h05 Laser iris set to 1.3 mm
12h20 Etude signal septum: le signal est tres bruité.
13h00 Faisceau MRSV visible en salle laser
13h20 Etude des coups manqués en fonction de la phase du dephaseur rigol. (cf plot)
Les phases rigol où il y a des pertes se repetent tous les 24 degrees avec une largeur de 6degrees. Reproductible sur plusieurs mesures.
Changement de la frequence anneau: + 4.5kHz, delta phase=52degrees
Etude des coups manqués en fonction de la phase du dephaseur rigol. (cf plot)
C'est a nouveau reproductible tous les 24 degrees mais a des phases differentes.
Changement de fréquence de sonnerie plus : + 4,5 kHz, delta RF Phase 43 dg. (99 dg. on the limit)
**Si vous avez un probleme de coups manqués, faites +12 degrees sur le dephaseur Rigol. Un bouton a ete ajouté sur l'IHM Ring Cavity**
Analyse de l'amplitude des pulses du septum (cf plot en mode persistance): Bruit de l'ordre de 5mV sur 850mV.
Le kicker tire quand l'impulsion du septum n'est pas au maximum.
16h30 EL quads: [-3.67; 4.2; 0.0; -4.08; 3.8; 2.57; -2.54] A (from simulation). Ext. kiker 7422 V. There is image on the EL SST.01 (saved).
16h35 Stop ThomX
Image processing results from the EL/DG/SST.01 camera. The resolution of the target image is 9.8 μm/pixel (horizontally).
The rms width of the horizontal beam profile (Gaussian approximation) is 325 pixels or 3.2 mm (see the figure uploaded). The simulated dispersion at the screen is about 1 m, so the rms energy spread is 0.32%. |
|
1134
|
Thu Oct 9 08:37:45 2025 |
Entered by Super Team from 134.158.195.141 on Thu Oct 9 08:37:29 2025 | Under Process | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning |
|
Shift "du Jeudi" : VM/HG/KD/DN/RC | |
09h35 Warmup ThomX
09h40 Cycling all magnets
09h50 Start Chillers
09h48 HV is ON
The reflected wave from the RF gun seems too high. Trying to set it to 27°C, but the clarinet temperature rises to 30.4°C and does not change.
10h15 HV is OFF
10h27 Stop the Gun chiller.
10h50 Start the RF Gun chiller. The temperature is constantly rising.
11h25 Kevin reloaded the RF gun chiller. All is OK
17h00 Beam is in the ring. Receipt was loaded from 10/04/2025 17:32, RCDS, Good storage, Orbit adjustment to measure bunch length with MRSV. There is the light on the camera. Receipt saved 09102025 17:07
Emittance measurements during the shift as well, at QP1, QP2 QP3 with low charge 70pC(0.8 mm) normal charge 100pC(1.3mm) and (300pC)3mm : here we wanted to see the affect of asymetric laser beam as well.
QP4-Scan also but scan is strange (and long ... 1s expo to see something)
|
|
1133
|
Fri Oct 3 09:08:29 2025 |
ND VC | Under Process | Shift summary | Linac Commissionning |
|
Shift summary | |
Demarrage machine 9H
test cyclage: OK (relecture courant parfois NAN)
Correction des fenetre d'intégration de mesure de charge des ICTs
Modification des coefficients des BPM TL 1 2 3 4 pour prendre en compte les attenuations des cables
Attention les coefficients doivent etre rechargés à chaque redemarrage du libéra
Libera 2 (TL) plante très souvant
Arret machine 17h45
|
|
1132
|
Thu Oct 2 08:32:08 2025 |
Entered by Super Team from 134.158.195.141 on Thu Oct 2 08:31:43 2025 | Under Process | Shift summary | LI |
|
| |
08h30 ThomX warm-up
08h37 Cycling all magnets
10h20 HV is ON
10h30 Beam is in the ring |
|
Draft
|
Wed Oct 1 07:42:45 2025 |
KD, IC, VM | Under Process | Shift summary | Ring Commissioning |
|
shift du 1e octobre 2025 | |
7h40: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage)
==> IHM cyclage très longue à lancer, (a planté hier, pas aujourd'hui), des nan apparaissent (cf. screenshot)
08h45 Start modulator
09h09 There is a problem with the HV increasing above 1212 V
09h21 HV=1215 V
09h35 Beam is in the ring
RF gun phase 272 dg. Laser Att. 280 for -100 pC, Sect. Att. 2.38 dB, Phase 207 dg. Linac steerers: H [0.85 -3.17 ], V [-2.24 2.78]
09h49 RF gun phase 282 dg. Laser Att. 280 for -100 pC, Sect. Att. 2.38 dB, Phase 210 dg. Linac steerers: H [0.85 -3.17 ], V [-2.24 2.78]
Laser feedback does not seem to support maximum laser spot density
09h55 Modulator set to standby
Magnet offset: output Ri_C2 DP04 rise 6/12 turns, output Ri_C1 DP04 fall 3/12 turns,
12:00 HV in standby mode
14h30 HV is ON
Several accesses in the casemat with Rodolphe to rotate the dipoles. 4 dipoles are totated.
The vertical orbit seems to go in the good direction. Work in progress.
Still need one iteration tomorrow morning with Rodolphe.
18h20 STOP THOMX |
|
1130
|
Tue Sep 30 08:41:41 2025 |
KD | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 30 septembre 2025 | |
8h40: mise en chauffe en remote (frigo/chiller, modulateur, laser)
9h30: ajout de graisse sur le verrin du shutter Xline dans la casemate
9h45: le klystron ne passe pas en HV, gros problème de perverance aussi (impossiblde de passer à 1215V)
** Le générateur rigol ne répond plus ==> adresse IP fausse (anciennement celle de camera sst spare) ==> rigol en DHCP nom reseau "dephaseur-sy" = "192.168.229.164"
** Cavité FP instable gros délock ==> impossible de faire le programme de shift.
** Problème de delock visible sur l'accéléromètre ==> travaux devant sciences ACO totalement corrélé avec les délock.
18h Stop ThomX |
|
1129
|
Fri Sep 26 09:01:14 2025 |
ND | | Shift summary | LI | Diag |
|
Verifications IHM_cyclage | |
9:00 Accès pour FPC
Recherche des problemes de plantage de l'IHM cyclage.
Plantages difficiles a reproduire (pas de plantage quand j'essaie).
Quelques optimisation du code.
git pull
Ajustement des contantes Ks des BPM LI, TL, EL en fonction des attenuations de cables.
Recherche du probleme de profondeur memoire des BPMs.
|
|
1128
|
Thu Sep 25 08:17:57 2025 |
KD, VM, IC | Under Process | Shift summary | Ring | Ring Commissioning |
|
shift du 25 septembre 2025 | |
8h05: mise en chauffe en remote de la machine (modulateur, frigo/chiller, laser)
==> cyclage aimant plante, donc aimant non allumés ni cyclé.
9h All keys are in vertical position. Totes rondes sont tombees. We need help to restart.
Kevin and Vincent came to help.
All systems were started.
We switch on the RF and found problem with the reflected RF power in the gun. Checked the temperature and found that chiller failed to set the proper temperature.
10h10 Restart frigo+chiller
Several restarts but the temperature does not rise.
After several attempts it is OK
11h Problem with laser, we do nto see the dark current on the ICT1; Try to understand the reason
Laser was not aligned. Kevin helped.
We restarted all the Liberas as they were not in a good state.
The phase shifter DS was OFF.
11h50 Finally we have the beam in the ring
problem with the RIC1 STR 4 VERT It does not take the command and stays in the orange state. Steerer resistance is 18 Ohm.
12h02 F Gun phase 283 dg. Sect Att. 2.32 dB. Sect. phase 218 dg. Beam charges about -100 pC. Charge devices do not show values
Restart all Liberas because of reading problems
Srudies of the RF freq change. it is clear that it changes the phase of the RF cavity. Not clear if it is OK for th e measurements.
=> It is very important to measure the deltaPhase introduced by the RF transport lines in order to proceed with the measurements.
The vert cteere in the ring shuld be checked/repaired.
Stop for lunch and steerer reparation.
13h20 Jean-Noel came to help and check the steerer. Overvoltage on the PS. Access to the casemat.
14h11 RIC1 STR 4 VERT fixed by Jean-Noel
14h14 HV is 'ON'
15h Studies of the vetical orbit and its compensation
17h Optics measurements.
|
|
1127
|
Fri Sep 19 14:49:23 2025 |
DN, KD, ND | Under Process | Shift summary | Ring | Diag |
|
Prises de données MRSV et Streak camera | |
Matin: Alignement.
Apres midi tentative de voir du faisceau en salle laser.
Faisceau tres faible.
On trouve deux iris dans le chemin optique. Après ouverture, le chemin optique n'est plus bon.
Realignement.
17:35 Arret machine |
|
1126
|
Fri Sep 19 07:51:19 2025 |
KD | Under Process | Shift summary | Diag | Opt | Ring Commissioning |
|
shift du 19 septembre 2025 | |
7h50: mise en chauffe en remote (modulateur, frigo/chiller, laser, cyclage)
==> plantage cyclage entre les QP Ri-C1 et Ri-C2 |
|
1125
|
Thu Sep 18 07:51:55 2025 |
KD, VM, IC | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 18 septembre 2025 | |
7h50: mise en chauffe en remote (modulateur, frigo/chiller, laser, cyclage)
==> impossible d'allumer les aimants, trop de plantage de l'IHM cyclage !
==> après insistance le bouton "cyclage" ne semble pas planter (seul le bouton "allumage" semble être en cause)
08h30 Section temperature set to 30 C
Transition to 50 MeV
08h55 HV is 'ON'
10h15 Beam is in the ring without RF. RF Gun phase 235 dg., Sect. Att. 2.46 dB, Sect. Phase 202 dg. Linac steerers H [1.0 -3.17], V [-2.25 2.81], Chargges (BPMs): -135, -129 -135
We are trying to measure the dispersion in the ring. It is necessary to change the RF, but this creates problems.
1) By changing FR frequency, problem with triggering
2) Changing the RF frequency changes RF cavity phase !!! Imprtant for beam physics studies.
3) Sometimes als laser phase
This point should be studies.
For today Nicolas checked the DS Ring_freq which we use. We started the discussion how to approach the issue.
We use unipolar frequency sweep method with deltaRF = 10 kHz. Sometimes it fails. Even by doing this, the real deltaRF is not 10 kHz but apparently up to 100 Hz different.
We also observed that by changing the frequency by multiple of 5 keeps the phase almost unchanged but still with mistriggering.
We made the studies of vertical dispersion and orbit.
The current conclusions: we should change the tilt of 2 dipoles in the ring to correct for vertical dispersion, by about 0.5 mrad.
We contacted Rodolphe Marie to organize this intervention.
With corrected vertical dispersion we made LOCO. Succesfull 1st iteration. Should be continued.
During the day several problems with RF cavity. 4 times it went to interlock Reflected Power. Took some time to rester it.
18h STOP ThomX
|
|
1124
|
Wed Sep 17 16:56:59 2025 |
HG, MJ | Fixed | Shift summary | LI | TL | LE | Ring |
|
Quads scans Q3 et Q7 + Courbe energie vs Phase section | |
Modulateur HT @600 V 
Question : Quand on switch off le Dipole de la TL (Linac) le faisceau prend un kick ( - 0.1 mm sur le BPMx, et 0.2 mm BPMy) --> déjà observé ?
Vers 13h30
Min de dispersion pour phi_Section 246° et Att : 0.15
** Energie vs Ph_sec
Phi246 : Ekin :68.05 (Dispersion min Yag TL2)
Phi248 : Ekin :68.49
Phi250 : Ekin :68.27
Phi252 : Ekin :67.88
Phi254 : Ekin :67.65
Phi256 : Ekin :68.17
Phi258 : Ekin :66.8
Phi260 : Ekin :66.9
Phi264 : Ekin :65.5
244° (avec backlash) pour avoir disp min TL2 - 250.8 dipole pour BPMTL2X = 0
** Quad Scans
Conditions : q1 q2 q3 q4 q5 q6 : -0.25 / 4.9 / -4.77 / 2.94 / 2.94 / -5.6
Scan Q7 a Phi_sec=248
emitX=3.1 (14h04)
emitY=2.2 (13h59)
Dipole OFF - Scan Q3 a Phi_sec=248 (14h56 seulement car probleme de code qui beuguait)
emitX=1.6
emitY=3.9
Dipole ON - Scan Q7 a Phi_sec=248 (bis) 15h08
emitX=2.8
emitY=2.6
Dipole ON - Scan Q7 a Phi_sec=248 (ter) 15h14
emitX=2.8
emitY=2.5
Dipole ON - Scan Q7 a Phi_sec=246 15h17
emitX=2.3
emitY=2.5
Dipole ON - Scan Q7 a Phi_sec=244 15h23
emitX=3.1
emitY=2.4
Dipole ON - Scan Q7 a Phi_sec=246 (bis) 15h35
emitX=2.5
emitY=2.8
Dipole OFF - Scan Q3 a Phi_sec=246 15h39
emitX=1.7
emitY=3.6
** Check min espread ecran TL2 : min espread ph_sec 245-246 (15h43)
** De nouveau Energie vs Ph_sec (q1 q2 q3 = 0) (pour voir precision, effet aller-retour, backlash) (16h)
Data ci-dessous ==> data traitees : cf. pj
Phi245 : Ekin :68.7
Phi246 : Ekin :69.0
Phi247 : Ekin :69.0
Phi248 : Ekin :69.9
Phi249 : Ekin :68.5
Phi250 : Ekin :68.4
Phi252 : Ekin :67.7
Phi254 : Ekin :67.1
Phi256 : Ekin :67.3
Phi260 : Ekin :67.0
Phi264 : Ekin :64.3
Phi267 : Ekin :62.9
Je repars de plus bas et je monte
Phi225 : Ekin :67.4
Phi215 : Ekin :64.5
Phi225 : Ekin :65.2
Phi230 : Ekin :67.5
Phi235 : Ekin :68.2
Phi235bis : Ekin :68.7
Phi235ter : Ekin :68.1
Phi237 : Ekin :67.8
Phi239 : Ekin :68.3
Phi240 : Ekin :69.0
Phi241 : Ekin :68.9
Phi242 : Ekin :69.3
Phi243 : Ekin :68.7
Phi244 : Ekin :69.9
Phi245 : Ekin :69.8
Phi246 : Ekin :69.5
Phi247 : Ekin :69.4
Phi248 : Ekin :68.7
Phi249 : Ekin :68.4
Phi251 : Ekin :68.2
Phi254 : Ekin :64.3
Phi254bis : Ekin :68.3
Phi257 : Ekin :67.9
Phi262 : Ekin :66.7
Je redescends
Phi257 : Ekin :66.0
Phi257bis : Ekin :68.4
Phi257ter : Ekin :66.0
Phi257quatro : Ekin :67.2
Phi254 : Ekin :67.0
Phi251 : Ekin :67.6
Phi248 : Ekin :67.7
Phi248bis : Ekin :67.8
Phi247 : Ekin :69.5
Phi246 : Ekin :69.2
Phi246bis : Ekin :68.3
Phi246ter : Ekin :68.3
Phi246quatro : Ekin :69.9
Phi245 : Ekin :69.3
Phi244 : Ekin :69.8
Phi244bis : Ekin :67.7
Phi244ter : Ekin :67.3
Phi244quatro : Ekin :69.2
Phi243 : Ekin :67.2
Phi242 : Ekin :68.3
Phi241 : Ekin :69.0
Phi240 : Ekin :67.0
Phi237 : Ekin :69.7
Phi235 : Ekin :67.0
Phi232 : Ekin :68.6
Phi232bis : Ekin :68.5
Phi228 : Ekin :66.1
Phi225 : Ekin :66.4
Phi225bis : Ekin :67.2
Phi225ter : Ekin :66.9
Phi225quatro : Ekin :65.5
|
|
1122
|
Wed Sep 17 09:22:32 2025 |
ND, VC | Under Process | Shift summary | Linac Commissionning |
|
shift | |
Demarrage chauffage 9h30
branchement DEG4
Verification DEG4: Reglages OK.
Cycle termine sans plantage.
Machine laissee en Chauffe pour les operateurs de la journee.
|
|
1121
|
Tue Sep 16 12:11:42 2025 |
KD | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 16 septembre 2025 | |
12h: mise en chauffe (modulateur, frigo/chiller, laser, cyclage)
==> plantage IHM cyclage (2fois)
12h15: Stop machine ==> pas besoin pour la CFP
*** Programme CFP *** |
|
1120
|
Fri Sep 12 09:06:59 2025 |
VC, ND, KD | Under Process | Shift summary | LE |
|
Shift summary 12/9/2025 | |
8h20: mise en chauffe en remote (Laser, modulateur, frigo/chiller, cyclage)
9:00 Redemarrage mean_std qui etait planté
9:10 Cyclage aimants
9:27 Git pull: Added EL/PS/DPi to IHM_Cycling
9:50 Discussion avec JNC. Changement de la valeur maximum d'alerte sur QP5 de 10.0 a 10.1A. Le probleme de cyclage persiste: la tension depasse parfois 6V quand I=10A. JNC va resserer des cables.
recette: good_20250821_17_14_40 70MeV
11:00 Observation signal FC EL avec et sans faisceau. wc3_shutter_effect.png (11H22)
Vers l'échantillon 200 on voit la réponse de la FC.
11:50 Optimisation des steerers. EL/PS/STR.02-V.01 plante souvent, impossible de l'utiliser.
12:40 Extinction de l'anneau pour analyse bruit EP sur ICT et BPM.
13:00 arret faisceau
14:00 test cyclage QP5 succès (2 fois de suite)
Test mesure charge:
ICTs : Deux traitements de données ("Vincent" et "Hayg")
La méthode "V" est robuste aux bruits des EPs (avec une mesure de "dark current" à effectuer quand les EPs sont allumés), La méthode "H" est très sensible aux EPs (pas de soustraction du bruit) mais semble plus "propre" dans la mesure de charge.
BPMs
après plusieurs tests (utilisation des fentes pour diminuer la charge) pour vérifier que la charge transmise dans la ligne n'est pas un pB physique, il semble que les BPM TL02 et TL03 on une mesure 20% supérieure à TL01
Check des configuration des liberas
(code pour calcul charge ICT taurustrend 'eval:a={er/ca/rac.05-elr.01-wac.01/ch0}; 1e9 * (a[650:950] - a[:200].mean()).sum() *10 / (3200 * 1e6 * 50) ' 'eval:a={er/ca/rac.05-elr.01-wac.02/ch3}; 1e9 * (a[650:950] - a[:200].mean()).sum() *10 / (3200 * 1e6 * 50) ' 'eval:a={er/ca/rac.05-elr.01-wac.02/ch4}; 1e9 * (a[650:950] - a[:200].mean()).sum() *10 / (3200 * 1e6 * 50) ' &
Avec un décalage timing des wavecatchers et le code ci dessus , la méthode "H" est moins sensible aux EPs...
Attention un recall de la rectte Timing est à faire ... prévu par Nicolas ce soir!
17H15 ThomX OFF
===
Objectifs:
1) Utiliser EL/FC avec passage dans l 'anneau.
2) Comparer Signaux sur ICT, FC et BPM avec et sans EP
3) Comprendre probleme augmentation charge dans TL
|
|
1119
|
Fri Sep 12 08:20:01 2025 |
KD | Under Process | Shift summary | Diag | Linac Commissionning | Ring Commissioning |
|
shift du 12 septembre 2025 | |
8h20: mise en chauffe en remote (Laser, modulateur, frigo/chiller, cyclage) |
|
Draft
|
Thu Sep 11 11:12:36 2025 |
IC, VM | | | Ring |
|
BBA | |
8h50 Thomx warmup
10h20 HV is 'ON'
RF Gun phase is 254 dg. Sect phase is 243 dg. Sect. Att. 0.119 dB, Charges: -112 pC, -113. pC, -140 pC. Linac steeres: H [1.00 -3.49], V[1.92 2.13]
11h00 Beam is in the ring. Receipt 70 MeV from references BPM TL2 X=-1 mm
11h30 HV went standby. Maher fixed it.
11h32 HV is 'ON'
BPM transmission does not work properly (see screenshot)
Good storage at 70 MeV with the receipt.
Laser phase adjustment during the shift a few times
Work on the BBA at 70 MeV
For this, measurement of the ORM. There is a differennce with the model ORM. Attempts to tune the ring from the model. Work should be continued.
Due to this, only manual BBA can be done at the moment.
Starting also to adress the manual BBA in the TL. We used HCOR2 and QP5 and TL BPM.03. The results are not clear (big element-to-element distances). To be continued.
18h STOP THOMX
|
|
Draft
|
Thu Sep 11 08:49:20 2025 |
IC, VM | | | Ring |
|
BBA | |
08h50 Warm up of the modulator |
|
1116
|
Tue Sep 9 15:19:47 2025 |
Entered by Marie Jacquet from 134.158.205.21 on Tue Sep 9 15:19:28 2025 | Fixed | Shift summary | LI | TL | LE | Ring |
|
X-rays - Recherche on-axis avec script fwhm - Prise de qq spectres - Mesure taille source | |
** spectre CdTe avec feuille Au (pour calib)
** Utilisation du script FWHM des spectres, mapping 2D - Enregistrment spectres dans /data/shared (5x5 positions a chaque lancement du script).
** Prise de qq spectres autour de la position on-axis (position estimee juste avant avec le script)
** Mesure taille source "methode fentes 1" (images photonic science) |
|
1115
|
Tue Sep 9 07:35:39 2025 |
KD | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 9 septembre 2025 | |
7h30: mise en chauffe en remote (modulateur, frigo/chiller, laser, cyclage)
*** programme ***
- scan faisceau rayons-X et mise au point d'une méthode de repérage du centre
- prise de spectres à différents endroit autour du centre
- mesure taille faisceau |