Fri Mar 20 07:20:47 2026 |
IC, VM | Under Process | Shift summary | |
|
Work on orbit at 70 MeV for X rays | | 7h20: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
08h55 HV is ON
10h07 70 MeV. Beam is in the ring with RF 100 kV, phase -37.5 dg. The recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt loaded, linac steerers adjusted, Laser phase 56 dg., Sect. Att. 0.191 dB, Sect. phase 255 dg. charges around -100 pC, laser att. 323,
Goal: same orbit as for 50 MeV for X rays.
Work on 70 MeV orbit.
Orbits were obtained near IP. Receipt 70 MeV: recipe_recipe_LI_TL_RI_all_20260320_12_35_26.txt
Work on 61.5 MeV
Receipt 61.5 MeV: recipe_recipe_LI_TL_RI_all_20260320_16_26_35.txt, F=500.034945 MHz
|
|
Draft
|
Thu Mar 19 07:46:50 2026 |
Entered by Super Team from 127.0.0.1 on Thu Mar 19 07:46:39 2026 | | | |
|
, entered from 127.0.0.1 | | 7h45: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
8h46 The photocathode laser image on the camera is very weak, I can't initiate feedback. Help needed.
08h56 HV is on
During another attempt to launch laser position feedback, the diaphragm completely disappeared outside the screen (to the right).
OK it was fixed
09h57 beam is in the ring w/o RF, recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt loaded. Laser phase 5 dg. (to low), sect. att. 0.148 dB, sect. phase 258 dg., Charges around -100 pC,
10h06 RF 100 kV, phase -45 dg.
10h30 interlocks even at sect. att. 0244 dB
11h15 Sect. temp. set to 29.2C (Clarinette, Consigne 28.6 C)
11h57 laser phase jumped to 18 dg.
12h25 For the 70 MeV settings (DP current 255.8 A) the linac energy is too low, so we left 253.8 A ==> 69.7 MeV.
18h10 ThomX was stopped
|
|
1214
|
Wed Mar 18 07:58:19 2026 |
KD, VM, MJ, RC, DN | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 18 mars 2026 | | 8h: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
*** Programme : Mesure spectre et monochromateur à 61.5MeV (70MeV si le temps le permet)
61.5 MeV
09h35 HV is on
photocathod laser phase 62 dg. The receipt 61p5MeV_20250703_12_56_55.txt loaded, going to 61.5 MeV (interlocks)
10h13 Beam is on TL/SST02. Sect. att. 0.992 dB, sect. phase 236 dg.
10h30 Aligned with QP1 - QP3, linac steerers: H [-0.2 -3.02], V [-2.55 3.22]
11h05 Beam is in the ring W/O RF with all ring correctors set to zero
RF 100 kV storage is good, but can't correct the orbit at 61.5 MeV : le faisceau est presque hors du tube ==> Try to go to 70 MeV
70 MeV
13h20 RF processing the section on 25 pps by increasing pulse length from 1 us to 3 us
13h56 70 MeV, Linac steerers H [0.21 -3.75], V [-2.84 3.33], sect. att 0.18, phase 255 dg. laser phase 56 dg. (On the base of 70_MeV_Vert_tune 0.66_good_20251212_13_56_38.txt)
16h17 recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt saved, screenshots, RF 100 kV, phase -36 dg., Freq. 500.031645 MHz
L'orbite n'est pas la meme que pour 50 MeV ==> Checks spectres dromadaires a V+40
X_fpc = -1.5 / -1.3 / -1.7 / -1.9 / -1.1 mais on a oublie d'ajuster la phase a chaque fois .... meme phase (3.0 V)
X_fpc = -0.9 / -0.7 / -0.4 / -0.2 / -0.5 en ajustant la phase a chaque fois
Cf les 2 screenshots "Spectre 70 MeV"
On se place a X_fpc = -1 mm (pas top mais dans l'urgence on se met la)
Fente2 centrees a l'oeil : [H , V] = [11 , -23]
Prise de spectres a +/- 10 en H et V (a voir ce que ca donne offline)
17h56 ThomX was stopped |
|
1213
|
Tue Mar 17 08:07:49 2026 |
KD MJ RC DN VK | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
ENERGY-ANGLE reconstruction : prise de donnees - 17 mars 2026 | | 8h05 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
*** programme : Mesures : sol 230 100 pC
- Taille vert. e- (FPC) ==> FAIT (sigma = 110 um RMS stat / 102 um gauss) --> Taille ele V = 85 um
- Spectre angulaire sur 6-7 mrad ==> FAIT
Carre de 30 x 30 mm autour de l'OnAxis a l'oeil : ouverture fente2 0.3x0.3 mm
Au dela : ouverture fente2 0.4 x 0.4 mm
- Diode_Calib (flux On-Axis) - PAS fait (I3 et I4 suffisent)
- Taille_Source photonic ==> FAIT - DISTANCE Hexa_ech - Photonic = 43 cm
LSF [V , H] = [135 , 52] um
LSF [V , H] = [136 , 53] um --> Taille ele [H , V] = [143 , 81] um
- Longueur e- ==> FAIT ~ 100 ps au debut, 200 ps end (fwhm) ==> 85 ps RMS
- Emitt_Linac (QuadScan Q1) - PAS fait, les mesures emittances sont chaque fois de l'ordre de 2-3 mm.mrad ...
- Puissance FPC ~ 85 kW
- Flux : I3+I4 ~ 15000 - 18000 ==> 1.1 - 1.3 10^10 ph/s
=================================
09h09 HV is on
09h41 recipe_recipe_LI_TL_RI_all_20260311_13_12_06.txt loaded, linac steerers adjusted. Beam in the ring W/O RF, ring saved
09h49 RF 100 kV phase -42 dg. Charges around -100 pC, RF gun phase 172 dg., Sect. att. 2.4 dB , phase 224 dg. linac steerers: H [-0.2 -2.72], V [-2.54 3.14]
|
|
1212
|
Sun Mar 15 18:42:53 2026 |
MJ HG VK | Fixed | Shift summary | Linac Commissionning | Ring Commissioning |
|
Etudes de points MATCHING - 13 mars 2026 | | Programme : Etudes points Matching
==============================
Fentes2 centre faisceau a l’œil [H , V] = [7 , -18]
(Mot Det Ty = 10000 , TX = 0)
Orbites e- : idem que le 12/03 et le 11/03 (plate en Y, tout petit angle en X)
Check meilleures position de X_fpc
X_fpc de -1.4 a -1.7 , prise de spectres V+40 et OnAxis
- Ne change pratiquement rien aux dromadaires V+40
- On se place à X_fpc = -1.7 mm
DISTANCE Hexa_ech - Photonic = 43 cm
Sol = 230, iris=1.3
** Flux ~ 18000 (~ 12000 I3, ~ 6000 I4)
** Spectre OnAxis
** Mesure de taille source Photonic
(Mot Det Ty = 12000 , TX = 18000)
(Fente1 Hpos = -10.5 / Vpos = 2 / Hapert = 6 / Vapert = 5)
LSF [H , V] = [52 , 132] um
** Long paquet : 87 ps inj à 190 ps (FWHM)
** Quadscan Q1 :
Emit [x , y] = [1.8 , 1.8]
Beta [x , y] = [6.5 , 4.7]
alpha [x , y] = [-2 , -1]
Sol = 242, iris=1.0
** Flux ~ 8-9000
** Mesure de taille source Photonic
LSF [H , V] = [69 , 197] um
LSF [H , V] = [68 , 188] um MOINS BON
** PAS de prise de spectre
** Quadscan Q1 :
Emit [x , y] = [2.3 , 3.6]
Beta [x , y] = [54 , 44]
alpha [x , y] = [-11 , -8.5]
Avec autre fit du quadscan Q1 (Sol = 242, iris=1.0)
Emit [x , y] = [3.9 , 5.8]
Beta [x , y] = [32 , 26]
alpha [x , y] = [-7 , -5.4]
** Flux ~ 9000 (6000 I3 , 3000 I4)
** Mesure de taille source Photonic
LSF [H , V] = [66 , 192] um
LSF [H , V] = [63 , 186] um
** 1 spectre OnAxis
** Long paquet : 100 ps inj à 200 ps (FWHM)
MOINS bien que Sol = 230
Sol = 238, iris=1.0
** Quadscan Q1 :
Emit [x , y] = [2.4 , 1.7]
Beta [x , y] = [31 , 40]
alpha [x , y] = [-6 , -8]
** Flux ~ 10000
** 1 spectre ONAxis
On passe l’iris de 1.0 à 1.3, avec même optique
** 1 spectre ONAxis
** Flux ~ 10000
MOINS bien que Sol = 230
Retour a Sol = 230, iris = 1.3
** Prise de spectres
V+20 / V-20 / V-20 H+20 / H+20 / H+20 V+20 / H-20 V+20 / H-20 / H-20 V-20
V-40
V+40
H+40
** Mesure de taille source Photonic
LSF [H , V] = [67 , 168] um
|
|
Draft
|
Fri Mar 13 08:33:25 2026 |
Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026 | | | |
|
| | 08h32 Warm-up ThomX: Modulator, Laser, Fridge
08h37 Chillers were started, cycling all magnets
09h48 HV is ON
10h42 There was a problem with "Camera Laser". Restarted li/op/las.02 server by killing it
12h26 Beam is in the ring, RF 100 kV, phase -42 dg. Laser phase 163 dg. Sect att. 2.57 dB, Sect. phase 221 dg. Laser att. 324, Charge oscillating around -120 pC. Feedback laser PID coefficients were changed: P=0.5,I=0.02, D=0.05 to get more stable laser spot position (Old: P=0.7,I=0.01, D=0.1 ).
18h27 ThomX was stopped |
|
1210
|
Thu Mar 12 15:17:49 2026 |
MJ, KD | Fixed | Shift summary | Linac Commissionning | Ring Commissioning |
|
MONOCHROMATEUR - 12 mars 2026 | | Alignement CdTe On-axis a l'oeil
Prises spectres ouvertures fentes2 0.3x0.3 : OnAxis , V+40 , H+40 , H+20 , V+20 , H-20 , H+20 , V-20
-----------------------------------------------------------------------------------------------------------
Alignement MONO parallele au faisceau : Hexa mono Ry_mono = -0.1 deg
----------------------------------------------------------------------------------------------------------
Fente2 OnAxis
Ry = - 2.6 - 0.1 deg (43.6 keV code Kilperic) - R_sample = 5.2 deg
Spectres Fentes2 ouvertes ** 1 x 1 mm
** Max
Ry = - 2.5 - 0.1 deg (44.3 keV code Kilperic)
Spectres Fentes2 ouvertes ** Max
** 1 x 1 mm
** 0.5 x 0.5
** 2 x 2
** 3 x 3
Ry = - 2.45 - 0.1 deg (46 keV code Kilperic)
Spectres Fentes2 ouvertes ** Max
** 0.5 x 0.5
** 2 x 2
Mesure du flux diode calib avec et sans MONO
SANS MONO
Fentes2 ** 1 x 1 mm 12h50-51
** 2 x 2 12h51-52
** 3 x 3 12h52-53
Avec MONO : IMPOSSIBLE trop de bruit de fond
Mesure du flux avec DECTRIS
Ry = - 2.45 ==> Images 404 et 405 (13h11)
Ry = - 2.5 ==> Images 406 et 407 (13h12)
Ry = - 2.6 ==> Images 408 et 409 (13h13)
REF Ry = - 0.1 ==> Images 410 et 411 (13h18)
Fente2 V+40
Ry = - 2.9 - 0.1 deg (39 keV code Kilperic)
Spectres Fentes2 ouvertes ** 1 x 1 mm
** Max
** 2 x 2
Mesure du flux avec DECTRIS
Ry = - 2.9 ==> Images 415 et 416 (13h41)
REF Ry = - 0.1 ==> Images 418 et 419 (13h43)
Prise spectre ref a V+40
Fente2 V+70
Ry = - 3.8 - 0.1 deg (30 keV code Kilperic)
Spectres Fentes2 ouvertes ** 1 x 1 mm
** Max
** 2 x 2
** 5 x 5
** et divers autres
Fente2 H-37
Prise spectre ref a H -37
Pour Ry = - 2.9° (angle mono), R_sample = 6.5° (2theta)
Spectres Fentes2 ouvertes ** 2 x 2 mm
** Max
Fente2 H-64
Prise spectre ref a H -64
Pour Ry = - 3.8° (angle mono), R_sample = 8.5° (2theta) ==> Emean ~ 27keV
Pour Ry = - 3.2° (angle mono), R_sample = 7.3° (2theta) ==> Emean ~ 31.5keV
Fente2 H+36
Prise spectre ref a H +36
Pour Ry = - 2.9° (angle mono), R_sample = 5.5° (2theta) ==> Emean ~ 42keV
Pour Ry = - 3.2° (angle mono), R_sample = 6.1° (2theta) ==> Emean ~ 38keV
|
|
Draft
|
Thu Mar 12 07:57:41 2026 |
KD, VM, MJ, RC, DN | Under Process | Shift summary | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 12 mars 2026 | | 8h: mise en chauffe de la machine en remote (modulateur, laser, frigo/chillers, cyclage)
*** Programme ***
- Prise de données MonoChromateur.
09h04 HV is on
recipe_recipe_LI_TL_RI_all_20260311_13_12_06.txt loaded
09h43 Beam is in the ring W/O RF
10h16 RF 100 kV, phase-42 dg. Charge is oscillating -100 pC to -120 pC. Laser att. 316, RF gun laser phase 148 dg., sect. phase 222 dg.,
10h36 Laser phase 140 dg., Sect. 223 dg.
12h16 RF 100 kV, phase-46 dg. Charge is oscillating -100 pC to -120 pC. Laser att. 316, RF gun laser phase 142 dg., sect. phase 223 dg.,
15h48 RF 100 kV, phase-46 dg. Charge is oscillating -100 pC to -120 pC. Laser att. 316, RF gun laser phase 132 dg., sect. phase 224 dg.,
17h27 ThomX was stopped |
|
1208
|
Wed Mar 11 18:12:23 2026 |
Entered by Super Team from 127.0.0.1 on Wed Mar 11 18:12:09 2026 | Under Process | Shift summary | LI |
|
Emittance vs Iris | | Some Quad scans with variying the Iris opening.
Data :
- 17h17 : 2mm 120 pC
- 17h31 : 1.3mm 100pC
- 17h46 : 1mm 80pC
- 18h00 : 1mm 100 pC
- 18h27 : 1mm 100 C Sole 240
- 18h41 : 1mm 100 C Sole 245
|
|
1207
|
Wed Mar 11 08:03:48 2026 |
KD, VM, MJ, RC | Under Process | Shift summary | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 11 mars 2026 - TRANSFOCATEUR | | 8h: mise en chauffe en remote (cyclage, modulateur, laser, frigo/chiller)
clients et réseau très lent ==> reboot à faire sur TOUT les clients (client1 à 100% de la mémoire de prise)
09h28 HV is on
10h02 Beam is in the ring W/O RF. recipe_recipe_LI_TL_RI_all_20260224_14_54_20.txt loaded. Linac steerers adjusted
10h15 RF 100 kV, phase -39 dg.
11h03 Charges ~100 pC, laser att. 320
-----------------------------------------------------------------------------------
Les 2 det Dectris et photonic sur bras detecteur
Changement de position du CdTe sur l'hexa ech ==> Nouvelle correspondance Fentes2 / Hexa : Hexa [70 , 20] Fente2 [4 , -19]
Check : 1 spectre OnAxis, 1 a V+40, 1 a H+40
Calibration bras détecteur TZ : 1m = 79 777 pas moteur
-------------------------------------------------------------------------------------
Alignement TRANSFO centre faisceau avec les 2 pinholes
12h25 Mesure taille de source
5 images Photonic tous les 20000 pas (~ 1 m d'excursion en Z , Z=0 correspond au point echantillon)
AVEC PINHOLES :
R 17 + 22 + 28 ==> 5 images Z = 0 , 20000 , 40000 , 60000 , 80000
R 17 + 22 "
R 17 "
R 28 "
R 22 + 28 "
R 22 "
R 17 + 28
Alignement diode calibree centre faisceau - Fentes2 refermee autour de la diode - Mesures flux diode calibree
Pinholes : 13h53 - 54
Pin + R17+22+28 : 13h54 - 55
Pin + R17+22 : 13h55 - 56
Pin + R17 : 13h56 - 59
Pin + R17+28 : 14h00 - 01
Pin + R22+28 : 14h02 - 03
Pin + R28 : 14h03 - 04
Pin + R22 : 14h05 - 06
Photonic au point echantillon - R17+22 AVEC PINHOLES ==> Fentes 2 : ouverture [1 , 0.4] mm = tout le faisceau
[0.5 , 0.2] mm
[0.25 , 0.1] mm
Diode calib au point echantillon - Mesures
SANS LENTILLES - AVEC PINHOLES
Fentes 2 = [1 , 0.4] 14h32 - 33
[0.5 , 0.2] 14h33 - 34
[0.25 , 0.1] 14h35 - 36
SANS LENTILLES - SANS PINHOLES
Fentes 2 = [0.25 , 0.1] 14h36 - 37
[0.5 , 0.2] 14h38 - 39
changement de calib du PICO
[1 , 0.4] 14h42 - 43
SANS Fentes2 - SANS PINHOLES
Avec R17 -14h44 - 47
Avec R17+22 14h48 - 49
Avec R17+22+28 14h49 - 50
5 images Photonic tous les 20000 pas (~ 1 m d'excursion en Z , Z=0 correspond au point echantillon)
SANS PINHOLES :
R 17+22+28 (==> 5 images Z = 0 , 20000 , 40000 , 60000 , 80000) ,
R 17+22
R17
R 28
R 22+28
R22
R17+28
Mesure taille de source fentes1 (15h40)
|
|
Draft
|
Mon Mar 9 12:55:30 2026 |
Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026 | | | |
|
Restart after strange last shift | | 12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen put last motor positions (2266 && 4158) --> No spot on screen :(
13h05 : Gun activities incresed (Vac > 1e-7 && reflected power)
13h12 : Laser put OFF |
|
Draft
|
Fri Mar 6 10:44:11 2026 |
VM, HG, JN | Under Process | Shift summary | RF D1 |
|
| | 09h00 Warm-up ThomX: Modulator, Laser, Fridge
09h05 Chillers were started, cycling all magnets
10h03 HV is on
10h08 The laser att. 300 ==> 274 to set the gun charge to -100 pC
10h53 beam is in the ring. Laser phase 101 dg., Sect. Att. 2.533 dB, sect. phase 223 dg. (mot. pos. 1710. 223-60 dg. mot. pos. 1254 )
11h34 Breakdowns in the gun. Low SF6 pressure (2.2 bar)
13h38 Jean-Noel fixed it
13h48 HV is on
14h41 Gun charge is very ubstable and low. Breakdowns in the gun.
15h06 RF gun att. 3 dB
15h10 RF gun att. 2 dB
15h13 RF gun att. 1.5 dB
15h16 RF gun att. 1 dB. Can't move on.
15h19 Shutter was closed
15h24 RF gun att. 0.8 dB
15h28 RF gun att. 0.4 dB
15h29 RF gun att. 0.2 dB, breakdowns, go back to 2 dB
15h51 50 pps 2 dB
16h02 It gets worse
16h03 12.5 pps.
16h25 RF gun att. 0.5 dB
17h00 RF gun att. 0.8 dB
17h53 RF gun att. 0.0 dB, pulse width 2 us, breakdowns
17h58 RF gun att. 0.0 dB, pulse width 2.7 us, dark current 30 mV, solenoid off
18h00 RF gun att. 0.0 dB, pulse width 3 us, dark current 30 mV (it used to be around 18)
18h17 The laser spot on the cathode, the solenoid on, charge is low. There are breakdows at the new spot position.
18h20 ThomX was stopped
|
|
Draft
|
Fri Mar 6 09:00:45 2026 |
VM | Under Process | Shift summary | |
|
| | 09h00 Warm-up ThomX: Modulator, Laser, Fridge
09h05 Chillers were started, cycling all magnets
10h03 HV is on
10h08 The laser att. 300 ==> 274 to set the gun charge to -100 pC |
|
1203
|
Thu Mar 5 13:19:22 2026 |
MJ VM DN RC HG | | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Etudes matching |
| Mesures : Spectres et taille source X + Quads scans associées, @
** Sol 230 100pC
** Sol 242 100pC
** Sol 250 100pC (pas de mesure, car flux ~ 3000, pas de centre vertical du faisceau sur Dectris)
** Sol 230 200 pC
18h40 Fin
|
|
1202
|
Wed Mar 4 08:35:23 2026 |
VM, MJ, DN, RC | Fixed | Shift summary | Linac Commissionning | Ring Commissioning |
|
Check point du fonctionnement anneau du 24/02 suite a l'ajout de resistances dipole le 24/02 au soir | | 08h35 Warm-up ThomX: Modulator, Laser, Fridge
Programme shift : verifier que la recette orbite plate utilisee lors du shift du 24/02/2026 (= orbite PLATE, vers 15h) est toujours ok apres l'ajout de resistance sur dipole anneau (resistance installee apres le shift, = le 24/02 au soir)
08h40 Chillers were started, cycling all magnets.
09h47 HV is on but there are no triggers. Failed to connect to device li/op/opt.02-las.01-asp.01. The photocathode laser control mashine is off.
10h10 The photocathode laser control mashine is on. The laser amplifier was started.
10h29 Misstriggering caused modulator interlocks
10h44 It is OK with triggering, exept the photocathode laser.
11h15 Laser is ok, phase 133 dg.
11h48 The laser spot moves out of the screen, Hayg fixed it
12h35 Transfocator_20260225_17_33_57.txt loaded. Linac steeres were adjusted. Laser phase 127 dg., Sect. att. 2.532 dB, sect. phase 225 dg. linac steerers: H [-0.21 -2.66], V [-2.47 3.32], RF 100 kV, phase -39 dg., charges around -100 pC
On ne voit pas le centre du faisceau X sur DECTRIS - Trop allonge verticalement
Viktor "ajuste" la recette ==> on voit un tout petit petit petit peu mieux le centre ...
Flux < 5000 .....
Scan FPC ==> faisceau enorme cf screenshot 1_scanFPC_recipe_ou_on_voit_le_centre.png
Retour recette du depart orbites a peu pres plates plates
Flux minuscule
Scan FPC ==> faisceau enorme cf screenshot 2_scanFPC_receipe_FLAT_centre_pas_visible.png
Optimisation phases etc par Viktor
Flux minuscule
Scan FPC ==> faisceau enorme cf screenshot 3_scanFPC_receipe_FLAT_OPTIM_centre_pas_visible.png
16h58 Standby, removing the additional shunt resistor from the bend #3
17h42 HV is on
18h00 recipe_recipe_LI_TL_RI_all_20260224_14_54_20.txt loaded
Faisceau a peu pres au centre du tube
Flux ~ 20.000
Comparaison avec shift du 24/02 (spectre onaxis et V+40) ==> cf screenshot compar_20260224_20260304_after_cut_resistance.png
==> c'est OK, spectres tres similairees
18h26 ThomX stopped
CONCLUSION : impossible d'obtenir un faisceau electrons correct avec la nouvelle resistance. Retirer la resistance a permis de retrouver les resultats du 24/02
DEMAIN : demarrage des etudes matching a ce point de fonctionnemenet
A 100 pC
- Sol 230
- Sol 242
- Sol 250 100 pC,
puis SOL 230 a 200 pC |
|
Draft
|
Fri Feb 27 08:00:46 2026 |
IC, VM | Under Process | Urgent | Laser |
|
, entered from 127.0.0.1 | | 07h55: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
09h00 HV is on
09h35 recipe_recipe_LI_TL_RI_all_20260226_14_47_33.txt loaded. Beam is in the ring, RF cav. 100 kV, phase 32 dg., F=500.108655MHz
RF Gun phase 75 dg., Sect. att. 2.532 dB, sect. phase 220 dg., linac steerers: V [0.23 -2.68], V [-2.49 3.27], charges (BPMs) around -110 pC
At F=500.108655MHz and TL/BPM02 X=2mm the orbits are almost the same with and without RF (see screenshot)
At given ring settings, the MRSV size is highly dependent on the DPI, septum, and kicker settings, which are determined by the injection energy (Sect. att. and line phasing).
A combination of DPI, septum, and kicker settings should be adjusted to reduce the MRSV size.
12h35 The laser spot has moved outside the screen!!! Help needed!!!
Kevin fixed it.
Additional research showed that F=500.10045 MHz is suitable for ring operation.
15h55 ThomX was stopped.
|
|
Draft
|
Thu Feb 26 08:18:00 2026 |
IC, VM | | | |
|
| | 08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
09h19 HV is on
RF gun phase 78 dg. Sect. Att. 2.56 dB, sect. phase 219 dg. RF 50 kV. Linac steerers: H [-0.36 -2.65], V [-2.49 3.24].
Scan ring RF frequency.
16h40 ThomX stopped |
|
1199
|
Wed Feb 25 07:29:16 2026 |
KD MJ DN VK IC | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
25 fevrier 2026 - Alignement TRANSFO - Prise d'images PhotonicScience Rack transfo IN/OUT | | 7h30: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
*** Programme *** :
- Check spectres OnAxis, V+25 et V+40 apres resistances dipole installe hier soir (pas fait)
- Alignement et 1ere prise d'image TRANSFOCATEUR sur orbite de référence (fait)
8h30 : on charge la recette "all_20260224_14_54_20"
Flux tres bas (3000-4000)
Adjustement chroma ==> Recette 20260224_15_49_43_adjust_chroma
Flux toujours tres bas : 3000-4000 ph/s
Taille verticale scan FPC 230um RMS
Streak : 240 ps
On ne peut pas demarrer le shift
16h16 Several recipes were saved with adjusted settings for the linac and ring orbit. Flux I3+I4 riched of 20000 pA, but they became unusable after a few minutes due to instability.
17h36 Receipt recipe_recipe_LI_TL_RI_all_20260225_17_33_57.txt saved with comment: 20260225_for_transfocator_align
Recipe saved in References recipes : Transfocator_20260225_17_33_57.txt
Alignement transfocateur et Prise d'image - Racks in/out
----------------------------------------------------------
Code redpit phase laser a change
il reste a redemarrer la carte
|
|
1198
|
Tue Feb 24 07:38:01 2026 |
KD, VM, RC, MJ, IC | Under Process | Shift summary | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 24 fevrier 2026 | | 7h40: mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)
*** Programme ***
- repartir de la recette "iniale" de jeudi avec un grand angle vertical à l'IP
- trouver le point de "bascule" horizontal de l'IP avec la CFP (point immobile en fonction de la phase CFP)
- Changer l'angle vertical pour trouver le minimum acceptable pour les spectres (par dicotomie)
08h36 HV is on
09h30 recipe_recipe_LI_TL_RI_all_20260218_12_34_02.txt loaded. RF Gun phase 42 dg., Sect. att. 2.57 dB, phase 213 dg. Linac steerers: H [-0.09 -2.76], V [-2.39 3.23], Charges (ICT) about -100 pC, BPMs - about -100 pC. RF cavity phase -33 dg.
09h50 Ramp to 280 kV
Laser phase appears unstable
10:34 AM Vertical orbit bump applied
13h41 RF cavity ramp down to 150 kV
18h00 Standby
The additional shunt resistor installed on third DP.
19h27 HV is on
19h40 Standby
The additional shunt resistor installed on sixth DP.
20h00 HV is on
20h20 Standby
The additional shunt resistor was removed on sixth DP.
20h52 HV is on
21h30 RF gun phase 87 dg. Sect. att. 2.442 dB, Sect. phase 222 dg. Charges (BPMs): around -110 pC, unstable. Linac steerers: H [-0.19 -2.67], V [-2.43 3.30], RF cav. 150 kV, -33 dg.
22h30 Dispersion measurement
22h50 Beta functin measurement
Data save in filename /tmp_mnt/data/iryna.chaikovska/mml/measdata/THOMX/StorageRingdata/QUAD/QuadBeta_2026-02-24_22-44-21.mat
Tunes before mesurement nux = 0.1692 nuz = 0.7226
Tunes after mesurement nux = 0.1676 nuz = 0.7265
maximum betabeat dbxobx = 32.7 % dbzobz = 6.8 %
rms betabeat bx = 12.3 % rms bz = 2.9 % rms
Frequency scan from 500.078 MHz to 500.124450 MHz
02h16 ThomX was stopped |
|
Draft
|
Mon Feb 23 09:43:36 2026 |
IC | | | |
|
Ring studies | | 9h40: mise en chauffe (chillers/frigo, modulateur, cyclage)
HV ON
The ICT signal (GUN) is frozen. Need help to restart it. Use the BPM SpSum instead.
13h Beam in the ring.
RF gun phase 31 dg., Sect. att. 2.47 dB, Sect. phase 237 dg., charges (ICT): about -120 pC
17h16 ThomX stopped
|
|