Tue Oct 4 17:34:09 2022 |
Entered by Nicolas Delerue from 134.158.88.175 on Tue Oct 4 17:33:52 2022 | | Shift summary | |
|
Planning shift Thursday 6th October | |
- Study beam position on SST and BPM vs iris size / TL/BPM.01
- Start AcQAttrManager
- Study RDP vs TL/BPM.02
- Start MRSV
|
|
Draft
|
Wed Oct 5 19:02:28 2022 |
VK, VM, HG,IC, AL | | | |
|
| |
Shift started with machine receipy from Monday .
Scan parameters, injection to find orbit in the ring. Testing alghrithms for orbit correction.
15.55 Energy , charge not stable, asked Hayg to stabilize .
Ring Dipoles up 160.4A
Problem with steerers : RIC2 STR02-V01 and RIC1/ STR.05-H01 NEED TO BE REPAIRED
Fixed orbit correction gui. Units in libera are [nm] should be in [mm] to correctly scale currents.
|
|
Draft
|
Thu Oct 27 11:12:33 2022 |
Entered by Nicolas Delerue from 80.119.21.73 on Thu Oct 27 11:12:17 2022 | Under Process | Shift summary | |
|
Programme prise de donnée 28/10 | |
===
Program for the shift on 28/10
0) Git pull
1) Start beam
2) Measure respone of TL/SST.2 as function of time
3) Try to put TL/SST2 on negative polarity
4) Study BPM attenuation
|
|
Draft
|
Fri Jan 13 09:45:14 2023 |
ND/VK/IC/KD/HG/MJ | Under Process | Shift summary | |
|
Prise de donnee 13/01 | |
Mise en chauffe
9:45 Cyclage aimants
9:48 Demarrage |
| Attachment 1: scan_charge_phase_min_0.0_max_360.0_9_54_10.png
|
 |
| Attachment 2: scan_charge_phase_min_190.0_max_230.0_9_54_54.png
|
 |
| Attachment 3: 2023-01-13_09_58_47_li_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 4: 2023-01-13_10_01_07_tl_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
|
Draft
|
Wed Mar 8 11:45:46 2023 |
Entered by Marie Jacquet from 134.158.205.47 on Wed Mar 8 11:45:31 2023 | | | |
|
I-dipole vs X_TLBPM02 - Mesures/Simul (suite elog 28 fev) | |
Tue Feb 28 08:48:29 2023
8H50-demarrage chiller et chauffage klystron
* Laser réaligné avec phase (foc max) et (foc max -3deg).
- Comparaisson avant (Xlaser = 3.97mm/Ylaser = 1.88mm) et après (Xlaser = 4.95mm/Ylaser = 2.35mm) en P.J avec les screenshots.
Attention, la phase de foc max avait drifté de 3deg pendant l'alignement, les images prise après sont avec background substraction.
- Position LI/BPM.01 sans steerer : X = 1.2mm, Y = 1.8mm
- Solenoïde 234A (cf. e-log du 27/02/2023) Phase Canon-Laser (foc max - 50deg). Mesure d'énergie = 5.18MeV, mesure position LI/BMP.01 : X = 1.7mm, Y = 1.1mm (revoir alignement solénoïde)
* Passage section (1.8dB, phase 110deg)
- Les BPM saturent (cf. screenshot) ==> on change le power (-57 à -10)
- Steerer à revoir à cause du point laser procedure pour réalignement (utilisation script KD de minimisation du déplacement en fonction du PQ) :
1) LI/STR.01 sur QP.01
2) TL/STR.01 sur QP.03
3) rafinement avec valeur de QP.01 à QP.03 et atténuation section OK
==> cf. recette générale : recipe_recipe_LI_TL_RI_good_20230228_16_51_45.txt
- Position BPM une fois aligné : LI/BPM.01 : X = 0mm, Y = 1.7mm, TL/BPM.01 : X = 0.2mm, Y = -0.2mm
- Mesure énergie sortie Linac (soléno à 200A) : Calib (28.7/28.6 um/pixel) on obtient 50.4 MeV
* Passage TL :
- TL/BPM.02 saturé également cf. image, la puissance est réajusté (-58 à -10)
- Alignement Horizontal sans QUAD. Pas de désalignement horizontal lorsque TL/BPM.02 X = 0mm TL/BPM.03 et TL/BPM.04 ~ 0mm ==> les paire de dipôles font bien à 90°
- Alignement des QUAD :
QP.04 : Ajustement du dipôle pour être sur l'axe mag horizontal ==> dipôle 159.3A à ~ 159.1A, aligné avec QP.01 à QP.03 verticalement
QP.05 : Ajustement avec QP.04 aligné (DP = 159.1A), TL/STR.02 : H = -8A et V = -4.3A
QP.06 : TL/STR.02 : H = -3/-5A et V = -4.7A (difficile en horizontal pour cause de saute en énergie)
* Passage LE (on s'aligne dans QP.04 et QP.05, cf. recette générale) ==> utilisation des valeurs de QP.01 à QP.07 de la recette de Christelle du 27/02/2023 :
- On rentre dans la LE immédiatement avec EL/DPE = -7.4A et EL/DP = 159.3A ==> alignement pour utiliser EL/DPE = -7.72A (l'alignement se fait sur EL/BPM.01 afin que EL/DPE ne produise plus de shift vertical avec le changement de courant)
- faisceau intense et visible avec EL/SST.01 à 1s et gain 1dB. ==> caméra EL/SST.01 mal triguée il faut passer à 0.1s pour voir le faisceau
- Valeur des EL/QP ajusté la main pour avoir un faisceau bien focalisé (cf. photo) ==> cf. recette générale du jour
- Fin du shift, machine plutôt stable (cf. screenshot BPM)
==> energie finale 49.1MeV (soleno à 200A), et au dipôle 159.3A ==> TL/BPM.02 : X = 0mm ==> pas de shift en énergie
==> phase shift d'environ 10 deg (cf. courbe).
** Remarques Générales **
- Variation importante de la puissance en sortie Klystron en fonction de la phase caon/Laser. ==> Vincent est en cours d'investigation (surment problème de saturation du PA)
- "Grande" variation de puissance Klystron quelques mm sur TL/BPM.02 ==> correction avec l'atténuation du klystron de quelque 0.01dB (1.8dB -> 1.98dB). En fin de shift c'était beaucoup plus stable plus de reprise de l'attenuation (1.98dB)
- Pas de point de fonctionnement stable plus qu'un autre en fonction (atténuateur et HV modulateur)
==> cf différentes images du jour.
- Idipole = 158.5A, TL/BPM.02 : X = 5mm
- Idipole = 159A, TL/BPM.02 : X = 1.8mm
- Idipole = 159.8A, TL/BPM.02 : X = -4mm
|
|
Draft
|
Tue Apr 4 15:21:51 2023 |
| | | |
|
, entered from 134.158.195.141 | |
<p>12h10: Mise en chauffe modulateur, laser et chiller + PA</p>
<p>14h30: mesure phase relative sortie pilote/ sortie PA Vrms pilote, Vrms PA <strong>Sans HT dans le Klystron</strong></p>
<p>s'il vous plait, Indiquez l'heure du passage sous haute tension (pour voir si cela change quelque chose à aux mesures RF) MERCI</p>
<p>15h03 modulateur trig</p>
<p>Wave catchers arretes soft - Vincent les a redemarre (c'est la 2eme fois) Est-vr</p>
<p> </p>
<p> </p> |
|
Draft
|
Tue Oct 10 13:46:06 2023 |
KD MJ | | Shift summary | |
|
| |
|
|
Draft
|
Fri Nov 15 07:56:03 2024 |
IC, VK, VM, ND | | Shift summary | |
|
Ring studies, MRSV | |
07h50 Start ThomX
09h20 HV is 'ON'
09h25 HV 1215 V
09h52 RF Gun phase 234 dg. Att. 0.0 dB, Charge -110.0 pC; Sect. phase 208 dg., Att. 2.566 dB, TL/BPM2 X +2 mm
10h00 injection to the ring TL/BPM2 X -2 mm
10h02 Ring RF 100 kV
Today compared to yesterday shift the synchrotron oscillation amplitude is very unstable. Phase ? To be investigated.
First beam imaging with the MRSV.
BBA studies
Horizontal plane
BPM3 (BPM.04-Lib.03) dX=1.1 mm
BPM9 (BPM.04-Lib.05) dX=0.8 mm
BPM5 (BPM.06-Lib.04) dX=0.2 mm
BPM11 (BPM.06-Lib.05) dX=-0.3 mm
BPM4 (BPM.05-Lib.04) dX=-0.3 mm
BPM10 (BPM.05-Lib.05) dX=1.2 mm
Set offsets on X in Liberas (OffX)
BPM.01-Lib.03, 130000+1800000 = 1930000
BPM.02-Lib.03, 70000+400000 = 470000
BPM.04-Lib.03, 40000+1100000 = 1140000
BPM.06-Lib.04, 30000+200000 = 230000
BPM.03-Lib.03, 60000+100000 = 160000
BPM.05-Lib.04, 130000-300000 = -170000
BPM.01-Lib.04, 300000+400000 = 700000
BPM.02-Lib.04, 70000+200000 = 270000
BPM.05-Lib.05, 140000+1200000 = 1340000
BPM.06-Lib.05, -20000-300000 = -320000
BPM.04-Lib.04, -50000+800000 = 750000
BPM.03-Lib.03, 60000+100000 = 160000
Vertical plane
BPM12 ri-c1/dg/bpm.01-lib.03 dY = -2.4 mm
BPM1 ri-c1/dg/bpm.02-lib.03 dY = - 0.1 mm
BPM2 ri-c1/dg/bpm.03-lib.03 dY = - 0.5 mm
BPM3 ri-c1/dg/bpm.04-lib.03 dY = -0.2 mm
BPM4 ri-c1/dg/bpm.05-lib.04 dY = -1.0 mm
BPM5 ri-c1/dg/bpm.06-lib.04 dY = - 0.7 mm
BPM6 ri-c2/dg/bpm.01-lib.04 dY = - 1 mm
BPM7 ri-c2/dg/bpm.02-lib.04 dY = - 0.1 mm
BPM8 ri-c2/dg/bpm.03-lib.05 dY = -0.3 mm
BPM9 ri-c2/dg/bpm.04-lib.05 dY = -0.6 mm
BPM10 ri-c2/dg/bpm.05-lib.05 dY = + 0.3 mm
BPM11 ri-c2/dg/bpm.06-lib.05 dY = +0.5 mm
Set offsets on Y in Liberas (OffY)
BPM12 ri-c1/dg/bpm.01-lib.03 dY_new = -300000 -2.4 mm = -2700000
BPM1 ri-c1/dg/bpm.02-lib.03 dY_new = - 10000 - 0.1 mm = -110000
BPM2 ri-c1/dg/bpm.03-lib.03 dY_new = 105000 - 0.5 mm = -395000
BPM3 ri-c1/dg/bpm.04-lib.03 dY_new = 190000 -0.2 mm = -10000
BPM4 ri-c1/dg/bpm.05-lib.04 dY_new = - 110000 -1.0 mm = -1110000
BPM5 ri-c1/dg/bpm.06-lib.04 dY_new = -100000 - 0.7 mm = -800000
BPM6 ri-c2/dg/bpm.01-lib.04 dY_new = -20000 - 1 mm = -980000
BPM7 ri-c2/dg/bpm.02-lib.04 dY_new = 150000 - 0.1 mm = 50000
BPM8 ri-c2/dg/bpm.03-lib.05 dY_new = 0 - 0.3 mm = -300000
BPM9 ri-c2/dg/bpm.04-lib.05 dY_new = - 90000 -0.6 mm = -690000
BPM10 ri-c2/dg/bpm.05-lib.05 dY_new = 70000 + 0.3 mm = 370000
BPM11 ri-c2/dg/bpm.06-lib.05 dY_new = 10000 +0.5 mm = 510000
Studies in single trigget mode. See screenshots.
Beam is stored (sligth decay) in the ring around 15 minutes without touching anything. This opens way for beam dynamics studies and for better understanding of machine. Need to find a way to have diagnostics data (trigger only diag) in such mode.
17h50 Stop ThomX
|
| Attachment 1: Screenshot_from_2024-11-15_17-28-09.png
|
 |
| Attachment 2: Screenshot_from_2024-11-15_17-14-46.png
|
 |
| Attachment 3: Screenshot_from_2024-11-15_17-14-38.png
|
 |
| Attachment 4: Screenshot_from_2024-11-15_17-13-08.png
|
 |
| Attachment 5: Screenshot_from_2024-11-15_17-12-53.png
|
 |
| Attachment 6: Screenshot_from_2024-11-15_17-10-09.png
|
 |
| Attachment 7: Screenshot_from_2024-11-15_17-10-00.png
|
 |
| Attachment 8: Screenshot_from_2024-11-15_17-06-09.png
|
 |
| Attachment 9: Screenshot_from_2024-11-15_17-04-24.png
|
 |
| Attachment 10: Screenshot_from_2024-11-15_16-43-47.png
|
 |
| Attachment 11: Screenshot_from_2024-11-15_16-42-08.png
|
 |
| Attachment 12: Screenshot_from_2024-11-15_16-41-59.png
|
 |
| Attachment 13: Screenshot_from_2024-11-15_16-40-52.png
|
 |
| Attachment 14: Screenshot_from_2024-11-15_16-40-44.png
|
 |
| Attachment 15: 1HzOscScreenshot_from_2024-11-15_16-32-30.png
|
 |
| Attachment 16: Screenshot_from_2024-11-15_17-33-43.png
|
 |
| Attachment 17: Screenshot_from_2024-11-15_17-33-35.png
|
 |
| Attachment 18: Screenshot_from_2024-11-15_17-28-09.png
|
 |
| Attachment 19: Screenshot_from_2024-11-15_17-14-46.png
|
 |
| Attachment 20: Screenshot_from_2024-11-15_17-14-38.png
|
 |
| Attachment 21: Screenshot_from_2024-11-15_17-12-53.png
|
 |
| Attachment 22: Screenshot_from_2024-11-15_17-10-09.png
|
 |
| Attachment 23: Screenshot_from_2024-11-15_17-38-16.png
|
 |
| Attachment 24: Screenshot_from_2024-11-15_12-12-55.png
|
 |
| Attachment 25: Screenshot_from_2024-11-15_12-12-46.png
|
 |
| Attachment 26: Screenshot_from_2024-11-15_12-11-23.png
|
 |
| Attachment 27: Screenshot_from_2024-11-15_12-03-43.png
|
 |
| Attachment 28: Screenshot_from_2024-11-15_11-55-01.png
|
 |
| Attachment 29: Screenshot_from_2024-11-15_11-52-36.png
|
 |
| Attachment 30: Screenshot_from_2024-11-15_11-47-59.png
|
 |
| Attachment 31: Screenshot_from_2024-11-15_11-47-39.png
|
 |
| Attachment 32: Screenshot_from_2024-11-15_11-21-31.png
|
 |
| Attachment 33: Screenshot_from_2024-11-15_11-16-37.png
|
 |
| Attachment 34: Screenshot_from_2024-11-15_10-59-46.png
|
 |
| Attachment 35: Screenshot_from_2024-11-15_17-35-21-2.png
|
 |
| Attachment 36: Screenshot_from_2024-11-15_17-36-04-2.png
|
 |
|
Draft
|
Mon Feb 17 11:00:01 2025 |
VM, IC, VK | Under Process | Shift summary | |
|
70 MeV WP | |
10h30 Start beam
Since Friday evening the problem to store the beam at 70 MeV. There is 1 turn only. Probably some subsystem failure. At this moment the reason is not found. Help is needed: synchronization/Diag/Magnets.
Today morning the same situation. We came back to 50 MeV and the problem remains.
We checked dipoles with resistors, it looks fine. We are checking synchronization and laser, Diag delays.....
We found the problem is with kicker. looking now at this with Maher. The max value it accepts is 2500 V.
12h20 Maher wil restart the kicker at the hardware level. Maher is contacting SOLEIL.
12h30 The modulator has been set to standby mode.
Investigation of the problem with injection kicker.
Tomorrow tests with SOLEIL people.
16h30 Stop ThomX |
|
Draft
|
Tue Oct 21 12:29:35 2025 |
HG, DN. VM, MJ | | | |
|
| |
11h40 Thomx warm-up
12h35 HV is ON
12h40 HV 1215 V
12h50 Cycling all magnets
13h40 Beam is in the ring without RF
13h50 The FR cavity power has been restarted.
14h14 RF Gun phase 221 dg. Sect. Phase 206 dg. Sect. Att. 2.42 dB Laser Att. 286 Charges: -99 pC, -99 pC, -100 pC Linac steerers H [0.84 -3.18] V [-2.46 3.03]. MRSV light on the streak camera
14h31 The modulator is on standby. Daniele goes to the bunker with Marie to install the horizontal slit for MRSV
14h52 HV is ON
Image MRSV sigX=36.2 sigy=14.8 pixels
Intensite sur la streak reduite ==> On va essayer de deplacer la fente du coup
15h09 The modulator is on standby. Daniele goes to the bunker with Marie.
15h33 HV is ON
15h33 Image MRSV sigX=46.7 sigy=14.8 pixels avec la nouvelle positions de la fente - cf screenshot |
| Attachment 1: mrsv_2_positions_fente.png
|
 |
|
Draft
|
Fri Oct 24 08:33:30 2025 |
Entered by Super Team from 134.158.195.141 on Fri Oct 24 08:33:07 2025 | Under Process | Shift summary | |
|
| |
08h32 Warm-up ThomX: Modulator, Laser, Fridge
08h37 Chilers were started, cycling all magnets
09h38 HV is ON
The receipt loaded: recipe_recipe_LI_TL_RI_all_20251023_14_56_13
10h16 The beam is in the ring. RF Gun phase 233 dg., Sect. phase is 200 dg., Att. 2.34 dB, linac steerers: H [0.75 -2.98], V [-2.63 3.25], Charges: -101, -100, -102 -102 pC (from BPMs), TL/BPM02 X= -3, RF cavity 100 kV, phase 14 dg.
11h18 Laser feedback was reset.
phases were reset RF Gun 256 dg. Sect. 211 dg. RF Cav. 9.5 dg.
Scanning TL/QP3 at QP1=QP2 = 0
Scanning TL/QP3 at QP1= -0.17 A, QP2 = 3.5 A
Scanning TL/QP1 at QP2=QP3 = 0
|
|
Draft
|
Tue Oct 28 08:40:22 2025 |
Entered by Super Team from 134.158.195.141 on Tue Oct 28 08:40:06 2025 | Under Process | Shift summary | |
|
| |
08h40 Warm-up ThomX: Modulator, Laser, Fridge
08h45 Chillers were started, cycling all magnets
09h45 HV is ON
09h49 HV was set to 1215 V
10h15 the receipt recipe_recipe_LI_TL_RI_all_20251023_12_06_10.txt was loaded, linac phases, section attenuator and steerers was adjusted
10h20 The beam is in the ring W/O RF. RF Gun phase 215 dg., Sect. phase 207 dg., Sect. Att. 2.47 dB, TL/BPM02 X=-2mm, Laser Att. 274,Charges (BPMs) -110, -109, -80, -80 ???
10h33 Data taking for different TL/BPM02 X
10h50 RF 100 kV, Phase 11 dg. YL/BPM02 x=-3 to -4 mm, Very good storage, but losses in the TL, Check alignment
11h11 RF gun phase 202 dg. Secr. phase 206 dg. RF phase 3.5 dg. All charges are about -100 pC
11h27 TL/BPM02 X ==> 0 mm to minimize Sync. osc. Hor. Tun 0. 159
11h41 Hor. tun ==> 0.169
11h56 BBA
12h21 RF Gun phase ==> 207 dg.
12h32 Hv was set on standby
13h44 HV is ON
14h14 RF Gun phase ==> 211 dg.
16h52 Stop ThomX |
| Attachment 1: Screenshot_from_2025-10-28_11-48-31.png
|
 |
| Attachment 2: Screenshot_from_2025-10-28_11-47-12.png
|
 |
| Attachment 3: Screenshot_from_2025-10-28_11-46-55.png
|
 |
| Attachment 4: Screenshot_from_2025-10-28_15-34-03.png
|
 |
|
Draft
|
Wed Nov 5 12:50:55 2025 |
Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025 | | | |
|
| |
Matin :
Soucis synchro :
- Nicolas les a redémarré
- kevin est vebu vérifier la synchro du laser, le signal du 500 Mega un peu faible (à vérifer)
- toujours des coups perdus
Soucis Alims :
Dipole --> 250A impossible de forcer 159.3
- currentSetpointPM=159.3
- currentSetpoint=250=Current ...
Ds passé en erreur. Ok L'alim était en local ....
Soucis phase section :
Problem with calc/li_hfi/write_dep.01-mot.01 does not work.
To change section phase li/hfi/dep.01-mot.01 was used
18h08 Unable to get low energy spread on TL sst2. It seems we observed a scattered beam.
18h15 Gave up. Stop ThomX |
| Attachment 1: Screenshot_from_2025-11-05_17-49-33.png
|
 |
| Attachment 2: Screenshot_from_2025-11-05_17-51-14.png
|
 |
| Attachment 3: Screenshot_from_2025-11-05_17-50-44.png
|
 |
|
Draft
|
Thu Jan 15 09:09:37 2026 |
IC | Under Process | Shift summary | |
|
Ring studies | |
08h56 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.
Low SF6 pressure.
10h20 HV ON
Tuning of the Linac. Charge at ICT1 is about 100 pC
Load the nominal receipt.
Modulator put to stand by. Lunch break.
13h16 HV ON
Application of the quadrupol calibration curve -12..12 A.
NEW
K1i_model =
-1.5941
-1.5941
-1.5941
-1.5941
K2i_model =
3.2615
3.2615
3.2615
3.2615
K3i_model =
-6.1107
-6.1107
-6.1107
-6.1107
K4i_model =
5.4292
5.4292
5.4292
5.4292
K5i_model =
-3.5901
-3.5901
-3.5901
-3.5901
K6i_model =
2.3630
2.3630
2.3630
2.3630
>>
OLD
K1i_model =
-1.5473
-1.5473
-1.5473
-1.5473
K2i_model =
3.1987
3.1987
3.1987
3.1987
K3i_model =
-6.0302
-6.0302
-6.0302
-6.0302
K4i_model =
5.3524
5.3524
5.3524
5.3524
K5i_model =
-3.5248
-3.5248
-3.5248
-3.5248
K6i_model =
2.3082
2.3082
2.3082
2.3082
Machine-Model studies.
Nominal receipt
Before LOCO
=== dQ/dx comparison (axis: delta (dk*steps)) ===
Family dQx/dx(M) dQx/dx(T) ratio dQy/dx(M) dQy/dx(T) ratio
QP1 +4.975e-01 +5.370e-01 0.927 -3.362e-01 -4.067e-01 0.826
QP2 +7.289e-01 +8.119e-01 0.898 -2.407e-01 -2.830e-01 0.851
QP3 +2.198e-01 +2.420e-01 0.908 -9.850e-01 -6.102e-01 1.614
QP4 +1.026e+00 +1.136e+00 0.903 -2.736e-01 -2.968e-01 0.922
QP31 +6.600e-02 +7.543e-02 0.875 -2.357e+00 -1.288e+00 1.830
QP41 +5.350e-01 +6.000e-01 0.892 -1.024e+00 -5.563e-01 1.841
LOCO studies.
Checked that the first turn on which we inject now is 13-14th.
18h20 STOP THOMX
|
| Attachment 1: Screenshot_from_2026-01-15_11-04-16.png
|
 |
| Attachment 2: Screenshot_from_2026-01-15_11-33-33.png
|
 |
| Attachment 3: Ri_C1_Quads_is_off_Screenshot_from_2026-01-15_18-19-14.png
|
 |
| Attachment 4: Screenshot_from_2026-01-15_16-42-27.png
|
 |
| Attachment 5: Screenshot_from_2026-01-15_17-36-28after1LOCO.png
|
 |
|
Draft
|
Fri Jan 16 08:29:33 2026 |
IC, VM, ND | Under Process | Shift summary | |
|
| |
08h29 Warm-up ThomX: Modulator, Laser, Fridge
Chillers were started, cycling all magnets.
10h48 Beam is in the ring after resolving a lot of problems. The receipt loaded: recipe_recipe_LI_TL_RI_all_20260115_18_10_34.txt, with Linac-Tl : recipe_recipe_TL_all_20260116_10_52_12.txt, recipe_recipe_LI_TL_straight_all_20260116_10_51_52.txt. Linac steerers: H [0.59 -2.74], V [-2.48 3.06]
RF Gun phase 140 dg. Sect. Att. 2.523 dB, Sect. phase 190 dg. Laser att. 409, charges (BPMs): -100, -95, -98, -98 -97 pC , RF 100 kV, phase -8.5 dg. The MRSV camera dozs not operate.
11h44 Problem with cameras
All triggers dissapeared
Nicolas fixed it, but phases is different: RF gun phase 96 dg., sect phase 203 dg. RF cav. phase?
12h50 Laser phase jumped to 171 dg. Sect. phase ==> 210 dg. Manual phase shifter set back to 1176. The laser att. ==> 359 for RF gun charge -115 pC (BPM)
Ring studies Model-Machine
From time to time laser fase jumps.
Triggers stopped. Nicolas is looking at it.
14h40 Beam dissapears in between the studies. Every time we retune the linac...
No triggers!!!!
18h04 LOCO is on its way. Time to times the laser loses phase synchronization. It's terrible.
18h20 We've lost laser synchronization.
18h21 Stop ThomX
|
| Attachment 1: Screenshot_from_2026-01-16_18-28-24.png
|
 |
| Attachment 2: Screenshot_from_2026-01-16_13-22-12.png
|
 |
| Attachment 3: Screenshot_from_2026-01-16_13-23-01.png
|
 |
| Attachment 4: Screenshot_from_2026-01-16_13-31-16MODEl.png
|
 |
| Attachment 5: Screenshot_from_2026-01-16_16-02-15LOCO_1it.png
|
 |
|
Draft
|
Tue Jan 20 08:35:56 2026 |
VM, ND, VC | Under Process | Shift summary | |
|
| |
08h35 Warm-up ThomX: Modulator, Laser, Fridge
08h41 Chillers were started, cycling all magnets.
09h40 HV is ON
10h12 The receipt loaded: recipe_recipe_LI_TL_RI_all_20260116_14_22_26.txt. Beam is in the ring W/O RF
RF gun phase 40 dg., Sect. Att. 2.556 dB, Sect. phase 207 dg., Linac steerers: H [0.58 -2.83], V [-2.48 2.94], charges (BPMs): -125, -119, -121, -122, -119 PC, the laser att. 359
10h38 RF 100 kV, phase -4 dg., manual phase shifter was adjusted.
10h54 RI_C1 Quads were stoped to chec dispersion at injection
13h00 Triggers stoped, after that was fixed the laser phase jumped to 202 dg. sect. phase 206 dg.
15h39 Mod. standby
17h20 HV is on
18h01 Stop ThomX |
|
Draft
|
Mon Feb 23 09:43:36 2026 |
IC | | | |
|
Ring studies | |
9h40: mise en chauffe (chillers/frigo, modulateur, cyclage)
HV ON
The ICT signal (GUN) is frozen. Need help to restart it. Use the BPM SpSum instead.
13h Beam in the ring.
RF gun phase 31 dg., Sect. att. 2.47 dB, Sect. phase 237 dg., charges (ICT): about -120 pC
17h16 ThomX stopped
|
|
Draft
|
Thu Feb 26 08:18:00 2026 |
IC, VM | | | |
|
| |
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
09h19 HV is on
RF gun phase 78 dg. Sect. Att. 2.56 dB, sect. phase 219 dg. RF 50 kV. Linac steerers: H [-0.36 -2.65], V [-2.49 3.24].
Scan ring RF frequency.
16h40 ThomX stopped |
|
Draft
|
Fri Mar 6 09:00:45 2026 |
VM | Under Process | Shift summary | |
|
| |
09h00 Warm-up ThomX: Modulator, Laser, Fridge
09h05 Chillers were started, cycling all magnets
10h03 HV is on
10h08 The laser att. 300 ==> 274 to set the gun charge to -100 pC |
|
Draft
|
Mon Mar 9 12:55:30 2026 |
Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026 | | | |
|
Restart after strange last shift | |
12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen put last motor positions (2266 && 4158) --> No spot on screen :(
13h05 : Gun activities incresed (Vac > 1e-7 && reflected power)
13h12 : Laser put OFF |