| Toutes les notes concernant les Commissionning de ThomX, Page 5 of 63 |
Not logged in |
 |
|
| New entries since: | Thu Jan 1 01:00:00 1970 | |
VK/ND/SC; Faisceau Anneau 10x
|
IC, VM, VK, AL, JH; Optimization of the ring 6x
|
VC VK IC; Commissionning
|
VK, VM, IC, KD; Ring commissioning 7x
|
KD; shift du 9 decembre 2022
|
SC/ND/IC/VK/VM; Faisceau 11x
|
ND, VK, VM; Shift 23/2 9x
|
ND, Enzo Crou, Noé Idesheim, Jean-Nicolas Quenot; Prise de donnee 16/3/2023 17x
|
IC, VM, VK, ND; RIng commissioning 10x
|
VK, VM, IC, LS; Restart storage in the Ring
|
KD VM VK JN SL; shift du 5 mai 2023    
|
ND, LS, IC, VK, VM, SW; Ring operation 15/5 7x
|
LS, ND, IC, VK; Ring operation 16/5   
|
VK, IC. AL; Understanding of the shift in RF frequency 18x
|
VK, IC; RF frequency of the Ring   
|
VK, IC. VM, LS; Studies on the beam revolution frequency 12x
|
ND, LS, IC, VK, VM; Studies on the Ring revolution frequency 8x
|
ND, LS, IC, VK, VM; RE: Studies on the Ring revolution frequency
|
VK, IC. VM; Reestablishing running conditions at 500.38 MHz    
|
VK, IC. VM, ND, LS; beam storage   
|
|