|
HOME
Prise de donnees
MML
Controle commande
Simulations
Notes
Hardware
Ligne X
Laser Interaction
Diagnostiques
Synchronisation
|
|
Commissionning
Commissionning Preparation
Pannes
ShiftCheck
|
| Toutes les notes concernant les Commissionning de ThomX, Page 4 of 62 |
Not logged in |
 |
|
| New entries since: | Thu Jan 1 01:00:00 1970 | |
ND, VK, IC, VM, AL; Shift du 14/10/2022 10x
|
KD, ND, IC, VM, VK; shift du 2 décembre 2022 7x
|
ND, IC, VK, VM, ME; Shift 8/12 14x
|
ND, Camille Cheney, Mohamed ; Prise de donnees 16/12 9x
|
ND, LS, MB, DN, MA, IC, VK, MEK, JNC, MJ, RC; X-rays attempt 22/06 10x
|
VK, VM, IC; Recomissioning of the SR, search for the revolution frequency 13x
|
VK, VM, IC on Thu Feb 29 ; Recomissioning of the SR, search for the revolution frequency  
|
Entered by Super Team from 134.158.195.141 on Mon Mar 4 08:57:45 2024; Recomissioning of the SR, search for the revolution frequency
|
KD, VM, IC; shift du 25 septembre 2025  
|
VC; Shift du jour
|
VC, VM, VK, IC; Shift summary 
|
ND, SC, AM, VK, IC, VI; Mesures du 22/09 7x
|
Entered by Nicolas Delerue from 80.119.21.73 on Thu Dec 1 01:14:20 2022; Beam time / Thursday 1st December 11x
|
ND, LS; Prise de donnee 26/4/2023 
|
DN, KD, ND; Prises de données MRSV et Streak camera
|
VC VK AM IC & all; Shift du 28/09/2022  
|
AM, VI, VK, IC, VC, ND; Shift du 30/09/2022 16x
|
Slava, Viktor M, Iryna; Check the QUADs in the ring
|
VK, AL, IC; Beam is stored 6x
|
VK/ND/SC; Faisceau Anneau 10x
|
|