HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 59 of 62  Not logged in ThomX    logo
Entry   DN, IC, HG, KD, MJ, and Co; X-ray measurement/characterization campaign Q_missed_2025-12-18_13-50-19.png
Entry   KD; shift du 19 décembre 2025 
Entry   MJ; shift twiss Q1 versus soleno 
Entry   KD; shift du 06 janvier 2026 2026-01-06_19_17_58_tl_dg_sst_03-ccd_01_RAW.png2026-01-06_19_17_20_tl_dg_sst_03-ccd_01_RAW.png
Entry   VM DN MJ KD; shift du 07 janvier 2026 16x
Entry   IC, HG, RC, DN, JM; Test of the new receipt from BMAD Isol = 242 A 13x
Entry   KD, IC, VM, RC; shift du 9 janvier 2026 6x
Entry   KD; shift du 13 janvier 2026 
Entry   VM, RC, MJ, IC; Test Soleno=245, optic issue de la simu Julien Matching 
Entry   IC; Ring studies Screenshot_from_2026-01-15_11-04-16.pngScreenshot_from_2026-01-15_11-33-33.pngRi_C1_Quads_is_off_Screenshot_from_2026-01-15_18-19-14.pngScreenshot_from_2026-01-15_16-42-27.pngScreenshot_from_2026-01-15_17-36-28after1LOCO.png
Entry   IC, VM, ND;  Screenshot_from_2026-01-16_18-28-24.pngScreenshot_from_2026-01-16_13-22-12.pngScreenshot_from_2026-01-16_13-23-01.pngScreenshot_from_2026-01-16_13-31-16MODEl.pngScreenshot_from_2026-01-16_16-02-15LOCO_1it.png
Entry   VM, ND, VC;  
Entry   KD MJ RC DN; Position Horiz FPC ("spectres dromadaires") 
Entry   IC, VM; Beam studies 
Entry   IC, VM; Ring studies 
Entry   KD, HG, VM; Laser PC status Screenshot_from_2026-02-05_17-11-35.png
Entry   Entered by Super Team from 127.0.0.1 on Fri Feb 6 08:26:22 2026;  Screenshot_from_2026-02-06_10-52-58.png
Entry   VM && HG; Linac commissioning  Vacc_2026-02-11_11-05-31.pngScreenshot_from_2026-02-11_15-57-35.pngCharge_trend_2026-02-11_17-12-31.png
Entry   Entered by Super Team from 127.0.0.1 on Fri Feb 13 17:38:00 2026; SHift du jour 
Entry   MJ, KD,VM,IC, RC, DN; shift du 17 fevrier 2026 10x
ELOG V3.1.4-395e101